메뉴 건너뛰기




Volumn 50, Issue 5, 2014, Pages 4242-4253

Uncertainty compliant design flood estimation

Author keywords

cost benefit analysis; flood frequency analysis; hydraulic design; uncertainty

Indexed keywords

COST BENEFIT ANALYSIS; COSTS; DESIGN; ESTIMATION; FLOOD CONTROL; FLOODS; FREQUENCY ESTIMATION;

EID: 84902361686     PISSN: 00431397     EISSN: 19447973     Source Type: Journal    
DOI: 10.1002/2013WR014981     Document Type: Article
Times cited : (29)

References (39)
  • 1
    • 0023523115 scopus 로고
    • Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures
    • Bao, Y., Y. Tung, and, V. Hasfurther, (1987), Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures, Water Resour. Res., 23 (11), 2023-2029.
    • (1987) Water Resour. Res. , vol.23 , Issue.11 , pp. 2023-2029
    • Bao, Y.1    Tung, Y.2    Hasfurther, V.3
  • 2
    • 0343282961 scopus 로고
    • Discussion of "expected annual damages and uncertainties in flood frequency estimation"
    • Beard, L., (1990), Discussion of "expected annual damages and uncertainties in flood frequency estimation", J. Water Resour. Plann. Manage., 116, 847-850.
    • (1990) J. Water Resour. Plann. Manage. , vol.116 , pp. 847-850
    • Beard, L.1
  • 3
    • 0031104597 scopus 로고    scopus 로고
    • Estimating flood frequency and average annual damage
    • Beard, L., (1997), Estimating flood frequency and average annual damage, J. Water Resour. Plann. Manage., 123, 84-88.
    • (1997) J. Water Resour. Plann. Manage. , vol.123 , pp. 84-88
    • Beard, L.1
  • 4
    • 85001578751 scopus 로고    scopus 로고
    • Discussion of expected probability and annual damage estimators' by Jery R. Stedinger
    • Beard, L., (1998), Discussion of expected probability and annual damage estimators' by Jery R. Stedinger, J. Water Resour. Plann. Manage., 124, 365-366.
    • (1998) J. Water Resour. Plann. Manage. , vol.124 , pp. 365-366
    • Beard, L.1
  • 5
    • 72149085715 scopus 로고    scopus 로고
    • A limits of acceptability approach to model evaluation and uncertainty estimation in flood frequency estimation by continuous simulation: Skalka catchment, Czech Republic
    • doi: 10.1029/2007WR006726.
    • Blazkova, S., and, K. Beven, (2009), A limits of acceptability approach to model evaluation and uncertainty estimation in flood frequency estimation by continuous simulation: Skalka catchment, Czech Republic, Water Resour. Res., 45, W00B16, doi: 10.1029/2007WR006726.
    • (2009) Water Resour. Res. , vol.45
    • Blazkova, S.1    Beven, K.2
  • 6
    • 0342413310 scopus 로고
    • Model uncertainty in flood frequency analysis and frequency-based design
    • Bodo, B., and, T. Unny, (1976), Model uncertainty in flood frequency analysis and frequency-based design, Water Resour. Res., 12 (6), 1109-1117.
    • (1976) Water Resour. Res. , vol.12 , Issue.6 , pp. 1109-1117
    • Bodo, B.1    Unny, T.2
  • 7
    • 33646549923 scopus 로고    scopus 로고
    • Assessing the effect on flood frequency of land use change via hydrological simulation (with uncertainty)
    • DOI 10.1016/j.jhydrol.2005.10.001, PII S0022169405004816
    • Brath, A., A. Montanari, and, G. Moretti, (2006), Assessing the effect on flood frequency of land use change via hydrological simulation (with uncertainty), J. Hydrol., 324 (14), 141-153, doi: 10.1016/j.jhydrol.2005.10.001. (Pubitemid 43729382)
    • (2006) Journal of Hydrology , vol.324 , Issue.1-4 , pp. 141-153
    • Brath, A.1    Montanari, A.2    Moretti, G.3
  • 8
    • 0033943215 scopus 로고    scopus 로고
    • Flood frequency estimation by continuous simulation (with likelihood based uncertainty estimation)
    • Cameron, K. T. J., and, D. Beven, (2000), Flood frequency estimation by continuous simulation (with likelihood based uncertainty estimation), Hydrol. Earth Syst. Sci., 4, 23-34.
    • (2000) Hydrol. Earth Syst. Sci. , vol.4 , pp. 23-34
    • Cameron, K.T.J.1    Beven, D.2
  • 9
    • 79960389349 scopus 로고    scopus 로고
    • USACE experience in implementing risk analysis for flood damage reduction projects
    • doi: 10.1111/j.1936-704X.2008.00023.x.
    • Davis, D., B. A. Faber, and, J. R. Stedinger, (2008), USACE experience in implementing risk analysis for flood damage reduction projects, J. Contemporary Water Res. Educ., 140 (1), 3-14, doi: 10.1111/j.1936-704X.2008.00023.x.
    • (2008) J. Contemporary Water Res. Educ. , vol.140 , Issue.1 , pp. 3-14
    • Davis, D.1    Faber, B.A.2    Stedinger, J.R.3
  • 10
    • 84910966046 scopus 로고
    • Bayesian decision theory applied to design in hydrology
    • Davis, D. R., C. Kisiel, and, L. Duckstein, (1972), Bayesian decision theory applied to design in hydrology, Water Resour. Res., 8 (1), 33-41.
    • (1972) Water Resour. Res. , vol.8 , Issue.1 , pp. 33-41
    • Davis, D.R.1    Kisiel, C.2    Duckstein, L.3
  • 11
    • 0035499011 scopus 로고    scopus 로고
    • Uncertainty assessment of regionalized flood frequency estimates
    • DOI 10.1061/(ASCE)1084-0699(2001)6:6(453)
    • De Michele, C., and, R. Rosso, (2001), Uncertainty assessment of regionalized flood frequency estimates, J. Hydrol. Eng., 6 (6), 453-459. (Pubitemid 33045111)
    • (2001) Journal of Hydrologic Engineering , vol.6 , Issue.6 , pp. 453-459
    • De Michele, C.1    Rosso, R.2
  • 12
    • 3042687321 scopus 로고    scopus 로고
    • Exact variance structure of sample L-moments
    • DOI 10.1016/S0378-3758(03)00213-1, PII S0378375803002131
    • Elamir, E., and, A. Seheult, (2004), Exact variance structure of sample l-moments, J. Stat. Plann. Inference, 124 (2), 337-359, doi: 10.1016/S0378-3758(03)00213-1. (Pubitemid 38830082)
    • (2004) Journal of Statistical Planning and Inference , vol.124 , Issue.2 , pp. 337-359
    • Elamir, E.A.H.1    Seheult, A.H.2
  • 13
    • 85009632244 scopus 로고    scopus 로고
    • Risk-based floodplain management: A case study from Greece
    • doi: 10.1080/15715124.2003.9635191.
    • Ganoulis, J., (2003), Risk-based floodplain management: A case study from Greece, Int. J. River Basin Manage., 1 (1), 41-47, doi: 10.1080/15715124.2003. 9635191.
    • (2003) Int. J. River Basin Manage. , vol.1 , Issue.1 , pp. 41-47
    • Ganoulis, J.1
  • 14
    • 0031103436 scopus 로고    scopus 로고
    • Estimating expected annual damage for levee retrofits
    • doi: 10.1061/(ASCE)0733-9496(1997)123:2(89).
    • Goldman, D., (1997), Estimating expected annual damage for levee retrofits, J. Water Resour. Plann. Manage., 123 (2), 89-94, doi: 10.1061/(ASCE)0733-9496(1997)123:2(89).
    • (1997) J. Water Resour. Plann. Manage. , vol.123 , Issue.2 , pp. 89-94
    • Goldman, D.1
  • 16
    • 9744256994 scopus 로고    scopus 로고
    • Cost-benefit analysis and flood damage mitigation in the Netherlands
    • Jonkman, S., (2004), Cost-benefit analysis and flood damage mitigation in the Netherlands, Heron, 49, 95-111.
    • (2004) Heron , vol.49 , pp. 95-111
    • Jonkman, S.1
  • 17
    • 0032918166 scopus 로고    scopus 로고
    • Comprehensive at-site flood frequency analysis using Monte Carlo Bayesian inference
    • DOI 10.1029/1999WR900012
    • Kuczera, G., (1999), Comprehensive at-site flood frequency analysis using Monte Carlo Bayesian inference, Water Resour. Res., 35 (5), 1551-1557. (Pubitemid 29207988)
    • (1999) Water Resources Research , vol.35 , Issue.5 , pp. 1551-1557
    • Kuczera, G.1
  • 18
    • 69249129453 scopus 로고    scopus 로고
    • Model selection techniques for the frequency analysis of hydrological extremes
    • doi: 10.1029/2007WR006666.
    • Laio, F., G. Di Baldassarre, and, A. Montanari, (2009), Model selection techniques for the frequency analysis of hydrological extremes, Water Resour. Res., 45, W07416, doi: 10.1029/2007WR006666.
    • (2009) Water Resour. Res. , vol.45
    • Laio, F.1    Di Baldassarre, G.2    Montanari, A.3
  • 19
    • 80052821213 scopus 로고    scopus 로고
    • Spatially smooth regional estimation of the flood frequency curve (with uncertainty)
    • doi: 10.1016/j.jhydrol.2011.07.022.
    • Laio, F., D. Ganora, P. Claps, and, G. Galeati, (2011), Spatially smooth regional estimation of the flood frequency curve (with uncertainty), J. Hydrol., 408 (1-2), 67-77, doi: 10.1016/j.jhydrol.2011.07.022.
    • (2011) J. Hydrol. , vol.408 , Issue.12 , pp. 67-77
    • Laio, F.1    Ganora, D.2    Claps, P.3    Galeati, G.4
  • 20
    • 84861598283 scopus 로고    scopus 로고
    • Bayesian flood frequency analysis in the light of model and parameter uncertainties
    • doi: 10.1007/s00477-011-0552-y.
    • Liang, Z., W. Chang, and, B. Li, (2012), Bayesian flood frequency analysis in the light of model and parameter uncertainties, Stochastic Environ. Res. Risk Assess., 26 (5), 721-730, doi: 10.1007/s00477-011-0552-y.
    • (2012) Stochastic Environ. Res. Risk Assess. , vol.26 , Issue.5 , pp. 721-730
    • Liang, Z.1    Chang, W.2    Li, B.3
  • 21
    • 20344370293 scopus 로고    scopus 로고
    • Separating natural and epistemic uncertainty in flood frequency analysis
    • DOI 10.1016/j.jhydrol.2004.11.015, PII S0022169404005670
    • Merz, B., and, A. Thieken, (2005), Separating natural and epistemic uncertainty in flood frequency analysis, J. Hydrol., 309 (1-4), 114-132, doi: 10.1016/j.jhydrol.2004.11.015. (Pubitemid 40782477)
    • (2005) Journal of Hydrology , vol.309 , Issue.1-4 , pp. 114-132
    • Merz, B.1    Thieken, A.H.2
  • 22
    • 70449532142 scopus 로고    scopus 로고
    • Flood risk curves and uncertainty bounds
    • doi: 10.1007/s11069-009-9452-6.
    • Merz, B., and, A. Thieken, (2009), Flood risk curves and uncertainty bounds, Nat. Hazards, 51 (3), 437-458, doi: 10.1007/s11069-009-9452-6.
    • (2009) Nat. Hazards , vol.51 , Issue.3 , pp. 437-458
    • Merz, B.1    Thieken, A.2
  • 24
    • 84872230847 scopus 로고    scopus 로고
    • Multi-variate flood damage assessment: A tree-based data-mining approach
    • doi: 10.5194/nhess-13-53-2013.
    • Merz, B., H. Kreibich, and, U. Lall, (2013), Multi-variate flood damage assessment: A tree-based data-mining approach, Nat. Hazards Earth Syst. Sci., 13 (1), 53-64, doi: 10.5194/nhess-13-53-2013.
    • (2013) Nat. Hazards Earth Syst. Sci. , vol.13 , Issue.1 , pp. 53-64
    • Merz, B.1    Kreibich, H.2    Lall, U.3
  • 25
    • 28244446739 scopus 로고    scopus 로고
    • Bayesian generalized least squares regression with application to log Pearson type 3 regional skew estimation
    • doi: 10.1029/2004WR003445.
    • Reis, D., J. Stedinger, and, E. Martins, (2005), Bayesian generalized least squares regression with application to log Pearson type 3 regional skew estimation, Water Resour. Res., 41, W10419, doi: 10.1029/2004WR003445.
    • (2005) Water Resour. Res. , vol.41
    • Reis, D.1    Stedinger, J.2    Martins, E.3
  • 26
    • 0020971819 scopus 로고
    • Design events with specified flood risk
    • Stedinger, J., (1983), Design events with specified flood risk, Water Resour. Res., 19 (2), 511-522.
    • (1983) Water Resour. Res. , vol.19 , Issue.2 , pp. 511-522
    • Stedinger, J.1
  • 27
    • 0031103884 scopus 로고    scopus 로고
    • Expected probability and annual damge estimators
    • Stedinger, J., (1997), Expected probability and annual damge estimators, J. Water Resour. Plann. Manage., 123 (2), 125-135.
    • (1997) J. Water Resour. Plann. Manage. , vol.123 , Issue.2 , pp. 125-135
    • Stedinger, J.1
  • 28
    • 0022264492 scopus 로고
    • Regional hydrologic analysis: 1. Ordinary, weighted, and generalized least-squares compared
    • Stedinger, J., and, G. Tasker, (1985), Regional hydrologic analysis: 1. Ordinary, weighted, and generalized least-squares compared, Water Resour. Res., 21 (9), 1421-1432.
    • (1985) Water Resour. Res. , vol.21 , Issue.9 , pp. 1421-1432
    • Stedinger, J.1    Tasker, G.2
  • 29
    • 0001874255 scopus 로고
    • Frequency analysis of extreme events
    • edited by D. R. Maidment, chap. 18. McGraw-Hill Inc., New York, USA.
    • Stedinger, J., R. Vogel, and, E. Foufoula-Gergiou, (1993), Frequency analysis of extreme events, in Handbook of Hydrology, edited by, D. R. Maidment, chap. 18. McGraw-Hill Inc., New York, USA.
    • (1993) Handbook of Hydrology
    • Stedinger, J.1    Vogel, R.2    Foufoula-Gergiou, E.3
  • 30
    • 84876710152 scopus 로고    scopus 로고
    • Incorporating uncertainty of distribution parameters due to sampling errors in flood-damage-reduction project evaluation
    • doi: 10.1002/wrcr.20116.
    • Su, H.-T., and, Y. K. Tung, (2013), Incorporating uncertainty of distribution parameters due to sampling errors in flood-damage-reduction project evaluation, Water Resour. Res., 49, 1680-1692, doi: 10.1002/wrcr.20116.
    • (2013) Water Resour. Res. , vol.49 , pp. 1680-1692
    • Su, H.-T.1    Tung, Y.K.2
  • 31
    • 0019376844 scopus 로고
    • Optimal risk-based design of flood levee systems
    • Tung, Y., and, L. Mays, (1981), Optimal risk-based design of flood levee systems, Water Resour. Res., 17 (4), 843-852.
    • (1981) Water Resour. Res. , vol.17 , Issue.4 , pp. 843-852
    • Tung, Y.1    Mays, L.2
  • 33
    • 31444452755 scopus 로고    scopus 로고
    • Risk-based analysis for flood damage reduction studies (1996)
    • US Army Corps of Engineers Washington D. C.
    • US Army Corps of Engineers (1996), Risk-based analysis for flood damage reduction studies (1996), Eng. Manual 1110-2-1619, Washington D. C.
    • (1996) Eng. Manual 1110-2-1619
  • 35
    • 78249288471 scopus 로고    scopus 로고
    • Confidence intervals for the coefficient of l-variation in hydrological applications
    • doi: 10.5194/hess-14-2229-2010.
    • Viglione, A., (2010), Confidence intervals for the coefficient of l-variation in hydrological applications, Hydrol. Earth Syst. Sci., 14 (11), 2229-2242, doi: 10.5194/hess-14-2229-2010.
    • (2010) Hydrol. Earth Syst. Sci. , vol.14 , Issue.11 , pp. 2229-2242
    • Viglione, A.1
  • 36
    • 84876576771 scopus 로고    scopus 로고
    • Flood frequency hydrology: 3. A Bayesian analysis
    • doi: 10.1029/2011WR010782.
    • Viglione, A., R. Merz, J. L. Salinas, and, G. Bloeschl, (2013), Flood frequency hydrology: 3. A Bayesian analysis, Water Resour. Res., 49, 675-692, doi: 10.1029/2011WR010782.
    • (2013) Water Resour. Res. , vol.49 , pp. 675-692
    • Viglione, A.1    Merz, R.2    Salinas, J.L.3    Bloeschl, G.4
  • 37
    • 84874680880 scopus 로고    scopus 로고
    • Flood damage and influencing factors: A Bayesian network perspective
    • Granada, Spain. 11th International Conference on Structural Safety & Reliability. 2013
    • Vogel, K., C. Rigg, H. Kreibich, B. Merz, and, F. Scherbaum, (2012), Flood damage and influencing factors: A Bayesian network perspective, paper presented at the 6th European Workshop on Probabilistic Graphical Models (PGM 2012), Granada, Spain. 11th International Conference on Structural Safety & Reliability. 2013.
    • (2012) 6th European Workshop on Probabilistic Graphical Models (PGM 2012)
    • Vogel, K.1    Rigg, C.2    Kreibich, H.3    Merz, B.4    Scherbaum, F.5
  • 39
    • 0016544456 scopus 로고
    • Bayesian inference and decision making for extreme hydrologic events
    • Wood, E. F., and, I. Rodrguez-Iturbe, (1975), Bayesian inference and decision making for extreme hydrologic events, Water Resour. Res., 11 (4), 533-542.
    • (1975) Water Resour. Res. , vol.11 , Issue.4 , pp. 533-542
    • Wood, E.F.1    Rodrguez-Iturbe, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.