메뉴 건너뛰기




Volumn 49, Issue 3, 2013, Pages 1680-1692

Incorporating uncertainty of distribution parameters due to sampling errors in flood-damage-reduction project evaluation

Author keywords

epistemic uncertainty; expected opportunity loss; flood damage reduction project evaluation; risk based decision

Indexed keywords

DECISION MAKING; FLOOD DAMAGE; PROBABILITY DISTRIBUTIONS; PROJECT MANAGEMENT; RANDOM PROCESSES; RISK ASSESSMENT; UNCERTAINTY ANALYSIS;

EID: 84876710152     PISSN: 00431397     EISSN: 19447973     Source Type: Journal    
DOI: 10.1002/wrcr.20116     Document Type: Article
Times cited : (15)

References (36)
  • 2
    • 3042755044 scopus 로고    scopus 로고
    • How useful is quantitative risk assessment?
    • DOI 10.1111/j.0272-4332.2004.00455.x
    • Apostolakis, G. E., (2004), How useful is quantitative risk assessment?, Risk Anal., 24 (3), 515-520. (Pubitemid 38857623)
    • (2004) Risk Analysis , vol.24 , Issue.3 , pp. 515-520
    • Apostolakis, G.E.1
  • 3
    • 0023523115 scopus 로고
    • Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures
    • Bao, Y., Y. K. Tung, and, V. R. Hasfurther, (1987), Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures, Water Resour. Res., 23 (11), 2023-2029.
    • (1987) Water Resour. Res. , vol.23 , Issue.11 , pp. 2023-2029
    • Bao, Y.1    Tung, Y.K.2    Hasfurther, V.R.3
  • 4
    • 0003038679 scopus 로고
    • Exposition of a new theory of the measurement of risk
    • Bernoulli, D., (1954), Exposition of a new theory of the measurement of risk, Econometrica, 22 (1), 23-36.
    • (1954) Econometrica , vol.22 , Issue.1 , pp. 23-36
    • Bernoulli, D.1
  • 5
    • 0342413310 scopus 로고
    • Model uncertainty in flood frequency analysis and frequency-based design
    • Bodo, B., and, T. E. Unny, (1976), Model uncertainty in flood frequency analysis and frequency-based design, Water Resour. Res., 12 (6), 1109-1117.
    • (1976) Water Resour. Res. , vol.12 , Issue.6 , pp. 1109-1117
    • Bodo, B.1    Unny, T.E.2
  • 6
    • 0011143290 scopus 로고
    • Risk evaluation of investment projects
    • Bonini, C. P., (1975), Risk evaluation of investment projects, Omega, 3 (6), 735-750.
    • (1975) Omega , vol.3 , Issue.6 , pp. 735-750
    • Bonini, C.P.1
  • 7
    • 66549098236 scopus 로고
    • On the incongruity of program objectives and project evaluation: An example from the reclamation program
    • Bromley, D. W., and, B. B. Beattie, (1973), On the incongruity of program objectives and project evaluation: An example from the reclamation program, Am. J. Agric. Econ., 55 (3), 472-476.
    • (1973) Am. J. Agric. Econ. , vol.55 , Issue.3 , pp. 472-476
    • Bromley, D.W.1    Beattie, B.B.2
  • 8
    • 62249217187 scopus 로고    scopus 로고
    • Loss and gain functions for CBR retrieval
    • Castro, J. L., M. Navarro, J. M. Sanchez, and, J. M. Zurita, (2009), Loss and gain functions for CBR retrieval, Inf. Sci., 179 (11), 1738-1750.
    • (2009) Inf. Sci. , vol.179 , Issue.11 , pp. 1738-1750
    • Castro, J.L.1    Navarro, M.2    Sanchez, J.M.3    Zurita, J.M.4
  • 9
    • 33846939229 scopus 로고    scopus 로고
    • A UNISON framework for analyzing alternative strategies of IC final testing for enhancing overall operational effectiveness
    • DOI 10.1016/j.ijpe.2006.03.010, PII S0925527306002374, Building Core-Competence Through Operational Excellence
    • Chien, C. F., H. J. Wang, and, M. Wang, (2007), A UNISON framework for analyzing alternative strategies of IC final testing for enhancing overall operational effectiveness, Int. J. Prod. Econ., 107 (1), 20-30. (Pubitemid 46241852)
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 20-30
    • Chien, C.-F.1    Wang, H.-J.2    Wang, M.3
  • 10
    • 50249165824 scopus 로고    scopus 로고
    • Confidence bounds on structural reliability estimations for offshore platforms
    • De Leon, D., and, A. H.-S. Ang, (2008), Confidence bounds on structural reliability estimations for offshore platforms, J. Mar. Sci. Technol., 13 (3), 308-315.
    • (2008) J. Mar. Sci. Technol. , vol.13 , Issue.3 , pp. 308-315
    • De Leon, D.1    Ang, A.H.-S.2
  • 11
    • 33847020510 scopus 로고    scopus 로고
    • Mean-semivariance behavior: Downside risk and capital asset pricing
    • Estrada, J., (2007), Mean-semivariance behavior: Downside risk and capital asset pricing, Int. Rev. Econ. Finan., 16 (2), 169-185.
    • (2007) Int. Rev. Econ. Finan. , vol.16 , Issue.2 , pp. 169-185
    • Estrada, J.1
  • 12
    • 27744497699 scopus 로고    scopus 로고
    • Arrow's theorem, multi-criteria decision problems and multi-attribute preferences in engineering design
    • DOI 10.1007/s00163-004-0057-5
    • Franssen, M., (2005), Arrow's theorem, multi-criteria decision problems and multi-attribute preferences in engineering design, Res. Eng. Des., 16 (1), 42-56. (Pubitemid 41604352)
    • (2005) Research in Engineering Design , vol.16 , Issue.1-2 , pp. 42-56
    • Franssen, M.1
  • 13
    • 0344339135 scopus 로고    scopus 로고
    • Rough approximation of a preference relation by dominance relations
    • Greco, S., B. Matarazzo, and, R. Slowinski, (1999), Rough approximation of a preference relation by dominance relations, Eur. J. Oper. Res., 117, 63-83.
    • (1999) Eur. J. Oper. Res. , vol.117 , pp. 63-83
    • Greco, S.1    Matarazzo, B.2    Slowinski, R.3
  • 14
    • 79952284504 scopus 로고    scopus 로고
    • Optimal design of cable-stayed bridges based on minimum life-cycle cost
    • in, edited by H.-M. Koh and D. M. Frangopol, Taylor & Francis, Seoul, Korea.
    • Han, S.-H., and, A. H.-S. Ang, (2008), Optimal design of cable-stayed bridges based on minimum life-cycle cost, in Bridge Maintenance, Safety Management, Health Monitoring and Informatics-IABMAS '08, edited by, H.-M. Koh, and, D. M. Frangopol, Taylor & Francis, Seoul, Korea.
    • (2008) Bridge Maintenance, Safety Management, Health Monitoring and Informatics - IABMAS '08
    • Han, S.-H.1    Ang, A.H.-S.2
  • 15
    • 0000395009 scopus 로고
    • Too many proposals pass the benefit cost test
    • Hoehn, J. P., and, A. Randall, (1989), Too many proposals pass the benefit cost test, Am. Econ. Rev., 79 (3), 544-551.
    • (1989) Am. Econ. Rev. , vol.79 , Issue.3 , pp. 544-551
    • Hoehn, J.P.1    Randall, A.2
  • 17
    • 80052785230 scopus 로고
    • Choice criteria, decision behavior, and personality
    • Kernan, J. B., (1968), Choice criteria, decision behavior, and personality, J. Marketing Res., 5 (2), 155-164.
    • (1968) J. Marketing Res. , vol.5 , Issue.2 , pp. 155-164
    • Kernan, J.B.1
  • 18
    • 0016470436 scopus 로고
    • Confidence limits for design events
    • Kite, G. W., (1975), Confidence limits for design events, Water Resour. Res., 11 (1), 48-53.
    • (1975) Water Resour. Res. , vol.11 , Issue.1 , pp. 48-53
    • Kite, G.W.1
  • 20
    • 84995186518 scopus 로고
    • Portfolio selection
    • Markowitz, H. M., (1952), Portfolio selection, J. Finan., 7 (1), 77-91.
    • (1952) J. Finan. , vol.7 , Issue.1 , pp. 77-91
    • Markowitz, H.M.1
  • 22
    • 85005379934 scopus 로고
    • Stochastic dominance as a risk analysis criterion
    • Porter, R. B., and, K. Carey, (1974), Stochastic dominance as a risk analysis criterion, Decis. Sci., 5 (1), 10-21.
    • (1974) Decis. Sci. , vol.5 , Issue.1 , pp. 10-21
    • Porter, R.B.1    Carey, K.2
  • 24
    • 0001567393 scopus 로고
    • Safety first and the holding of assets
    • Roy, A. D., (1952), Safety first and the holding of assets, Econometrica, 20 (3), 431-449.
    • (1952) Econometrica , vol.20 , Issue.3 , pp. 431-449
    • Roy, A.D.1
  • 25
    • 0002900835 scopus 로고
    • The theory of statistical decision
    • Savage, L. J., (1951), The theory of statistical decision, J. Am. Stat. Assoc., 46 (253), 55-67.
    • (1951) J. Am. Stat. Assoc. , vol.46 , Issue.253 , pp. 55-67
    • Savage, L.J.1
  • 26
    • 84896089311 scopus 로고    scopus 로고
    • Flood-damage-reduction project evaluation with explicit consideration of damage cost uncertainty
    • doi: 10.1061/(ASCE)WR.1943-5452.0000291.
    • Su, H. T., and, Y. K. Tung, (2012), Flood-damage-reduction project evaluation with explicit consideration of damage cost uncertainty, J. Water Resour. Plann. Manage., doi: 10.1061/(ASCE)WR.1943-5452.0000291.
    • (2012) J. Water Resour. Plann. Manage.
    • Su, H.T.1    Tung, Y.K.2
  • 27
    • 0026822970 scopus 로고
    • Probability distribution for benefit/cost ratio and net benefit
    • Tung, Y. K., (1992), Probability distribution for benefit/cost ratio and net benefit, J. Water Resour. Plann. Manage., 118 (2), 133-150.
    • (1992) J. Water Resour. Plann. Manage. , vol.118 , Issue.2 , pp. 133-150
    • Tung, Y.K.1
  • 28
    • 0019376844 scopus 로고
    • Optimal risk-based design of flood levee systems
    • Tung, Y. K., and, L. W. Mays, (1981a), Optimal risk-based design of flood levee systems, Water Resour. Res., 17 (4), 843-852.
    • (1981) Water Resour. Res. , vol.17 , Issue.4 , pp. 843-852
    • Tung, Y.K.1    Mays, L.W.2
  • 29
    • 0019389255 scopus 로고
    • Risk models for flood levee design
    • Tung, Y. K., and, L. W. Mays, (1981b), Risk models for flood levee design, Water Resour. Res., 17 (4), 833-841.
    • (1981) Water Resour. Res. , vol.17 , Issue.4 , pp. 833-841
    • Tung, Y.K.1    Mays, L.W.2
  • 30
    • 0028665856 scopus 로고
    • Probabilistic evaluations of economic merit of water resource projects
    • Tung, Y. K., and, J. C. Yang, (1994), Probabilistic evaluations of economic merit of water resource projects, Water Resour. Manage., 8 (3), 203-223.
    • (1994) Water Resour. Manage. , vol.8 , Issue.3 , pp. 203-223
    • Tung, Y.K.1    Yang, J.C.2
  • 32
    • 0009692066 scopus 로고
    • U.S. Army Corps of Engineers (USACE) IWR 92-R-1 and IWR 92-R-2, vols. I and II, Inst. for Water Resour., U.S. Army Corps of Eng., Alexandria, Fort Belvoir, Va
    • U.S. Army Corps of Engineers (USACE) (1992), Guidelines for risk and uncertainty analysis in water resource planning, IWR 92-R-1 and IWR 92-R-2, vols. I and II, Inst. for Water Resour., U.S. Army Corps of Eng., Alexandria, Fort Belvoir, Va.
    • (1992) Guidelines for Risk and Uncertainty Analysis in Water Resource Planning
  • 33
    • 0010681235 scopus 로고    scopus 로고
    • U.S. Army Corps of Engineers (USACE) EM 1110-2-1619, Washington, D. C.
    • U.S. Army Corps of Engineers (USACE) (1996), Risk-based analysis of flood damage reduction studies, EM 1110-2-1619, Washington, D. C.
    • (1996) Risk-based Analysis of Flood Damage Reduction Studies
  • 35
    • 0017500216 scopus 로고
    • An analysis of flood levee reliability
    • Wood, E. F., (1977), An analysis of flood levee reliability, Water Resour. Res., 13 (3), 665-671.
    • (1977) Water Resour. Res. , vol.13 , Issue.3 , pp. 665-671
    • Wood, E.F.1
  • 36
    • 65449182300 scopus 로고    scopus 로고
    • Decision rules for water resources management under uncertainty
    • Xu, Y. P., and, Y. K. Tung, (2009), Decision rules for water resources management under uncertainty, J. Water Resour. Plann. Manage., 135 (3), 149-159.
    • (2009) J. Water Resour. Plann. Manage. , vol.135 , Issue.3 , pp. 149-159
    • Xu, Y.P.1    Tung, Y.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.