-
1
-
-
2542598480
-
Unit commitment - A bibliographical survey
-
10.1109/TPWRS.2003.821611
-
N. Padhy Unit commitment - a bibliographical survey IEEE Trans. Power Syst. 19 2 2004 1196 1205 10.1109/TPWRS.2003.821611
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.2
, pp. 1196-1205
-
-
Padhy, N.1
-
2
-
-
84893479770
-
Recent progress in modeling unit commitment problems
-
L.F. Zuluaga, T. Terlaky, Springer Proceedings in Mathematics & Statistics Springer New York 10.1007/978-1-4614-8987-0-1
-
M. Anjos Recent progress in modeling unit commitment problems L.F. Zuluaga, T. Terlaky, Modeling and Optimization: Theory and Applications Springer Proceedings in Mathematics & Statistics vol. 62 2013 Springer New York 1 29 10.1007/978-1-4614-8987-0-1
-
(2013)
Modeling and Optimization: Theory and Applications
, vol.62
, pp. 1-29
-
-
Anjos, M.1
-
3
-
-
72649092948
-
Development of a comprehensive electricity generation simulation model using a mixed integer programming approach
-
accessed 02.05.14
-
E. Delarue, D. Bekaert, R. Belmans, and W. D'haeseleer Development of a comprehensive electricity generation simulation model using a mixed integer programming approach Int. J. Electr. Comput. Syst. Eng. 1 4 2007 13 18 URL waset.org/publications/7251 (accessed 02.05.14)
-
(2007)
Int. J. Electr. Comput. Syst. Eng.
, vol.1
, Issue.4
, pp. 13-18
-
-
Delarue, E.1
Bekaert, D.2
Belmans, R.3
D'Haeseleer, W.4
-
4
-
-
0035341667
-
A mixed integer linear programming model for transmission expansion planning with generation location selection
-
DOI 10.1016/S0142-0615(00)00042-9, PII S0142061500000429
-
H. Samarakoon, R. Shresthaa, and O. Fujiwarab A mixed integer linear programming model for transmission expansion planning with generation location selection Int. J. Electr. Power Energy Syst. 23 4 2001 285 293 10.1016/S0142-0615(00)00042-9 (Pubitemid 32273101)
-
(2001)
International Journal of Electrical Power and Energy Systems
, vol.23
, Issue.4
, pp. 285-293
-
-
Samarakoon, H.M.D.R.H.1
Shrestha, R.M.2
Fujiwara, O.3
-
5
-
-
80052136729
-
Medium-term unit commitment in a pool market
-
M. Delimar, 10.1109/EEM.2011.5953055
-
P. Andrianesis, G. Liberopoulos, P. Biskas, and A. Bakirtzis Medium-term unit commitment in a pool market M. Delimar, 8th International Conference on the European Energy Market (EEM) 2011 461 466 10.1109/EEM.2011.5953055
-
(2011)
8th International Conference on the European Energy Market (EEM)
, pp. 461-466
-
-
Andrianesis, P.1
Liberopoulos, G.2
Biskas, P.3
Bakirtzis, A.4
-
6
-
-
84860232036
-
A mixed-integer linear programming approach for multi-stage security-constrained transmission expansion planning
-
10.1109/TPWRS.2011.2178000
-
H. Zhang, V. Vittal, G. Heydt, and J. Quintero A mixed-integer linear programming approach for multi-stage security-constrained transmission expansion planning IEEE Trans. Power Syst. 27 2 2012 1125 1133 10.1109/TPWRS.2011.2178000
-
(2012)
IEEE Trans. Power Syst.
, vol.27
, Issue.2
, pp. 1125-1133
-
-
Zhang, H.1
Vittal, V.2
Heydt, G.3
Quintero, J.4
-
7
-
-
39749084088
-
GENCO's risk-based maintenance outage scheduling
-
DOI 10.1109/TPWRS.2007.913295
-
L. Wu, M. Shahidehpour, and T. Li Genco's risk-based maintenance outage scheduling IEEE Trans. Power Syst. 23 1 2008 127 136 (Pubitemid 351292097)
-
(2008)
IEEE Transactions on Power Systems
, vol.23
, Issue.1
, pp. 127-136
-
-
Wu, L.1
Shahidehpour, M.2
Li, T.3
-
8
-
-
77954834803
-
Security-constrained generation and transmission outage scheduling with uncertainties
-
L. Wu, M. Shahidehpour, and Y. Fu Security-constrained generation and transmission outage scheduling with uncertainties IEEE Trans. Power Syst. 25 3 2010 1674 1685
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.3
, pp. 1674-1685
-
-
Wu, L.1
Shahidehpour, M.2
Fu, Y.3
-
9
-
-
70350714241
-
Coordination of midterm outage scheduling with short-term security-constrained unit commitment
-
10.1109/TPWRS.2009.2030289
-
Y. Fu, Z. Li, M. Shahidehpour, T. Zheng, and E. Litvinov Coordination of midterm outage scheduling with short-term security-constrained unit commitment IEEE Trans. Power Syst. 24 4 2009 1818 1830 10.1109/TPWRS.2009.2030289
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.4
, pp. 1818-1830
-
-
Fu, Y.1
Li, Z.2
Shahidehpour, M.3
Zheng, T.4
Litvinov, E.5
-
10
-
-
18944379628
-
Generation maintenance scheduling in restructured power systems
-
DOI 10.1109/TPWRS.2005.846078
-
A. Conejo, R. Garcia-Bertrand, and M. Diaz-Salazar Generation maintenance scheduling in restructured power systems IEEE Trans. Power Syst. 20 2 2005 984 992 10.1109/TPWRS.2005.846078 (Pubitemid 40699730)
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.2
, pp. 984-992
-
-
Conejo, A.J.1
Garcia-Bertrand, R.2
Diaz-Salazar, M.3
-
11
-
-
84886692215
-
Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market
-
10.1109/SCIS.2013.6613250
-
K. Suresh, and N. Kumarappan Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market Computational Intelligence in Scheduling (SCIS), 2013 IEEE Symposium on 2013 36 43 10.1109/SCIS.2013.6613250
-
(2013)
Computational Intelligence in Scheduling (SCIS), 2013 IEEE Symposium on
, pp. 36-43
-
-
Suresh, K.1
Kumarappan, N.2
-
12
-
-
0022665422
-
Application of decomposition techniques to short-term operation planning of hydrothermal power system
-
H. Habibollahzadeh, and J. Bubenko Application of decomposition techniques to short-term operation planning of hydrothermal power system IEEE Trans. Power Syst. 1 1 1986 41 47 (Pubitemid 16613274)
-
(1986)
IEEE Transactions on Power Systems
, vol.PWRS-1
, Issue.1
, pp. 41-47
-
-
Habibollahzadeh, H.1
Bubenko Janis, A.2
-
13
-
-
34548027768
-
Hydrothermal scheduling using benders decomposition: Accelerating techniques
-
DOI 10.1109/TPWRS.2007.901751
-
W.S. Sifuentes, and A. Vargas Hydrothermal scheduling using benders decomposition: accelerating techniques IEEE Trans. Power Syst. 22 3 2007 1351 1359 (Pubitemid 47278395)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.3
, pp. 1351-1359
-
-
Sifuentes, W.S.1
Vargas, A.2
-
14
-
-
48349105185
-
Long term hydrothermal scheduling linear programming model for large scale power systems
-
10.1109/LESCPE.2007.4437360
-
R.W. Jimenez, and V. Paucar Long term hydrothermal scheduling linear programming model for large scale power systems 2007 Large Engineering Systems Conference on Power Engineering 2007 96 100 10.1109/LESCPE.2007.4437360
-
(2007)
2007 Large Engineering Systems Conference on Power Engineering
, pp. 96-100
-
-
Jimenez, R.W.1
Paucar, V.2
-
15
-
-
80053904672
-
A hybrid algorithm for mid-long term hydrothermal generation scheduling
-
10.1109/MEC.2011.6025932
-
S. Jun, H. Yunfeng, Z. Zhifu, and H. Xianchao A hybrid algorithm for mid-long term hydrothermal generation scheduling Mechatronic Science, Electric Engineering and Computer (MEC), 2011 International Conference on 2011 2217 2220 10.1109/MEC.2011.6025932
-
(2011)
Mechatronic Science, Electric Engineering and Computer (MEC), 2011 International Conference on
, pp. 2217-2220
-
-
Jun, S.1
Yunfeng, H.2
Zhifu, Z.3
Xianchao, H.4
-
17
-
-
65849274505
-
Optimization methods applied for solving the short-term hydrothermal coordination problem
-
M. El-Hawary, and I. Farhat Optimization methods applied for solving the short-term hydrothermal coordination problem Electr. Power Syst. Res. 79 1 2009 1308 1320
-
(2009)
Electr. Power Syst. Res.
, vol.79
, Issue.1
, pp. 1308-1320
-
-
El-Hawary, M.1
Farhat, I.2
-
19
-
-
84899484720
-
2} abatement strategies
-
10.1016/j.jclepro.2014.01.005 Special volume: {PSE} Asia for Cleaner Production
-
2} abatement strategies J. Clean. Prod. 71 0 2014 40 47 10.1016/j.jclepro.2014.01. 005 Special volume: {PSE} Asia for Cleaner Production
-
(2014)
J. Clean. Prod.
, vol.71
, Issue.0
, pp. 40-47
-
-
Lee, M.Y.1
Hashim, H.2
-
20
-
-
84861911028
-
Environmental and economic aspects of higher res penetration into Macedonian power system
-
10.1016/j.applthermaleng.2011.10.042
-
B. Ćosića, N. Markovskab, G. Krajačić, V. Taseskab, and N. Dui&cacute Environmental and economic aspects of higher res penetration into Macedonian power system Appl. Therm. Eng. 43 2012 158 162 10.1016/j.applthermaleng.2011.10.042
-
(2012)
Appl. Therm. Eng.
, vol.43
, pp. 158-162
-
-
Ćosića, B.1
Markovskab, N.2
Krajačić, G.3
Taseskab, V.4
Dui5
Cacute, N.6
-
21
-
-
84886431438
-
Power grid simulation model for long term operation planning
-
10.3303/CET1335184
-
J. Zábojník, and M. Dvořák Power grid simulation model for long term operation planning Chem. Eng. Trans. 35 2013 1105 1110 10.3303/CET1335184
-
(2013)
Chem. Eng. Trans.
, vol.35
, pp. 1105-1110
-
-
Zábojník, J.1
Dvořák, M.2
-
22
-
-
77951164803
-
Minimum up/down polytopes of the unit commitment problem with start-up costs
-
accessed 02.05.14
-
D. Rajan, S. Takriti, Minimum Up/Down Polytopes of the Unit Commitment Problem with Start-up Costs, IBM res. report RC23628. URL domino.research.ibm. com/library/cyberdig.nsf/1e4115aea78b6e7c85256b360066f0d4/ cdcb02a7c809d89e8525702300502ac0?OpenDocument (accessed 02.05.14).
-
IBM Res. Report RC23628
-
-
Rajan, D.1
Takriti, S.2
-
23
-
-
84867028133
-
-
Gurobi Optimization, Inc. accessed 02.05.14
-
Gurobi Optimization, Inc. Gurobi optimizer reference manual URL www.gurobi.com 2014 (accessed 02.05.14)
-
(2014)
Gurobi Optimizer Reference Manual
-
-
|