메뉴 건너뛰기




Volumn 70, Issue 2, 2014, Pages 1294-1305

Power grid simulation model for long term operation planning

Author keywords

Hydrothermal decomposition; Large scale simulation; Mixed integer linear programming; Operations planning; Transmission network model

Indexed keywords

DISTRIBUTED COMPUTER SYSTEMS; ELECTRIC POWER TRANSMISSION; INTEGER PROGRAMMING; OUTAGES; SCHEDULING ALGORITHMS;

EID: 84902038631     PISSN: 13594311     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.applthermaleng.2014.05.064     Document Type: Article
Times cited : (8)

References (24)
  • 1
    • 2542598480 scopus 로고    scopus 로고
    • Unit commitment - A bibliographical survey
    • 10.1109/TPWRS.2003.821611
    • N. Padhy Unit commitment - a bibliographical survey IEEE Trans. Power Syst. 19 2 2004 1196 1205 10.1109/TPWRS.2003.821611
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.2 , pp. 1196-1205
    • Padhy, N.1
  • 2
    • 84893479770 scopus 로고    scopus 로고
    • Recent progress in modeling unit commitment problems
    • L.F. Zuluaga, T. Terlaky, Springer Proceedings in Mathematics & Statistics Springer New York 10.1007/978-1-4614-8987-0-1
    • M. Anjos Recent progress in modeling unit commitment problems L.F. Zuluaga, T. Terlaky, Modeling and Optimization: Theory and Applications Springer Proceedings in Mathematics & Statistics vol. 62 2013 Springer New York 1 29 10.1007/978-1-4614-8987-0-1
    • (2013) Modeling and Optimization: Theory and Applications , vol.62 , pp. 1-29
    • Anjos, M.1
  • 3
    • 72649092948 scopus 로고    scopus 로고
    • Development of a comprehensive electricity generation simulation model using a mixed integer programming approach
    • accessed 02.05.14
    • E. Delarue, D. Bekaert, R. Belmans, and W. D'haeseleer Development of a comprehensive electricity generation simulation model using a mixed integer programming approach Int. J. Electr. Comput. Syst. Eng. 1 4 2007 13 18 URL waset.org/publications/7251 (accessed 02.05.14)
    • (2007) Int. J. Electr. Comput. Syst. Eng. , vol.1 , Issue.4 , pp. 13-18
    • Delarue, E.1    Bekaert, D.2    Belmans, R.3    D'Haeseleer, W.4
  • 4
    • 0035341667 scopus 로고    scopus 로고
    • A mixed integer linear programming model for transmission expansion planning with generation location selection
    • DOI 10.1016/S0142-0615(00)00042-9, PII S0142061500000429
    • H. Samarakoon, R. Shresthaa, and O. Fujiwarab A mixed integer linear programming model for transmission expansion planning with generation location selection Int. J. Electr. Power Energy Syst. 23 4 2001 285 293 10.1016/S0142-0615(00)00042-9 (Pubitemid 32273101)
    • (2001) International Journal of Electrical Power and Energy Systems , vol.23 , Issue.4 , pp. 285-293
    • Samarakoon, H.M.D.R.H.1    Shrestha, R.M.2    Fujiwara, O.3
  • 6
    • 84860232036 scopus 로고    scopus 로고
    • A mixed-integer linear programming approach for multi-stage security-constrained transmission expansion planning
    • 10.1109/TPWRS.2011.2178000
    • H. Zhang, V. Vittal, G. Heydt, and J. Quintero A mixed-integer linear programming approach for multi-stage security-constrained transmission expansion planning IEEE Trans. Power Syst. 27 2 2012 1125 1133 10.1109/TPWRS.2011.2178000
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.2 , pp. 1125-1133
    • Zhang, H.1    Vittal, V.2    Heydt, G.3    Quintero, J.4
  • 7
    • 39749084088 scopus 로고    scopus 로고
    • GENCO's risk-based maintenance outage scheduling
    • DOI 10.1109/TPWRS.2007.913295
    • L. Wu, M. Shahidehpour, and T. Li Genco's risk-based maintenance outage scheduling IEEE Trans. Power Syst. 23 1 2008 127 136 (Pubitemid 351292097)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.1 , pp. 127-136
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 8
    • 77954834803 scopus 로고    scopus 로고
    • Security-constrained generation and transmission outage scheduling with uncertainties
    • L. Wu, M. Shahidehpour, and Y. Fu Security-constrained generation and transmission outage scheduling with uncertainties IEEE Trans. Power Syst. 25 3 2010 1674 1685
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.3 , pp. 1674-1685
    • Wu, L.1    Shahidehpour, M.2    Fu, Y.3
  • 9
    • 70350714241 scopus 로고    scopus 로고
    • Coordination of midterm outage scheduling with short-term security-constrained unit commitment
    • 10.1109/TPWRS.2009.2030289
    • Y. Fu, Z. Li, M. Shahidehpour, T. Zheng, and E. Litvinov Coordination of midterm outage scheduling with short-term security-constrained unit commitment IEEE Trans. Power Syst. 24 4 2009 1818 1830 10.1109/TPWRS.2009.2030289
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.4 , pp. 1818-1830
    • Fu, Y.1    Li, Z.2    Shahidehpour, M.3    Zheng, T.4    Litvinov, E.5
  • 10
    • 18944379628 scopus 로고    scopus 로고
    • Generation maintenance scheduling in restructured power systems
    • DOI 10.1109/TPWRS.2005.846078
    • A. Conejo, R. Garcia-Bertrand, and M. Diaz-Salazar Generation maintenance scheduling in restructured power systems IEEE Trans. Power Syst. 20 2 2005 984 992 10.1109/TPWRS.2005.846078 (Pubitemid 40699730)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 984-992
    • Conejo, A.J.1    Garcia-Bertrand, R.2    Diaz-Salazar, M.3
  • 11
    • 84886692215 scopus 로고    scopus 로고
    • Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market
    • 10.1109/SCIS.2013.6613250
    • K. Suresh, and N. Kumarappan Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market Computational Intelligence in Scheduling (SCIS), 2013 IEEE Symposium on 2013 36 43 10.1109/SCIS.2013.6613250
    • (2013) Computational Intelligence in Scheduling (SCIS), 2013 IEEE Symposium on , pp. 36-43
    • Suresh, K.1    Kumarappan, N.2
  • 12
    • 0022665422 scopus 로고
    • Application of decomposition techniques to short-term operation planning of hydrothermal power system
    • H. Habibollahzadeh, and J. Bubenko Application of decomposition techniques to short-term operation planning of hydrothermal power system IEEE Trans. Power Syst. 1 1 1986 41 47 (Pubitemid 16613274)
    • (1986) IEEE Transactions on Power Systems , vol.PWRS-1 , Issue.1 , pp. 41-47
    • Habibollahzadeh, H.1    Bubenko Janis, A.2
  • 13
    • 34548027768 scopus 로고    scopus 로고
    • Hydrothermal scheduling using benders decomposition: Accelerating techniques
    • DOI 10.1109/TPWRS.2007.901751
    • W.S. Sifuentes, and A. Vargas Hydrothermal scheduling using benders decomposition: accelerating techniques IEEE Trans. Power Syst. 22 3 2007 1351 1359 (Pubitemid 47278395)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1351-1359
    • Sifuentes, W.S.1    Vargas, A.2
  • 14
    • 48349105185 scopus 로고    scopus 로고
    • Long term hydrothermal scheduling linear programming model for large scale power systems
    • 10.1109/LESCPE.2007.4437360
    • R.W. Jimenez, and V. Paucar Long term hydrothermal scheduling linear programming model for large scale power systems 2007 Large Engineering Systems Conference on Power Engineering 2007 96 100 10.1109/LESCPE.2007.4437360
    • (2007) 2007 Large Engineering Systems Conference on Power Engineering , pp. 96-100
    • Jimenez, R.W.1    Paucar, V.2
  • 16
    • 84870500232 scopus 로고    scopus 로고
    • Economic dispatch of hydro-thermal power system with large-scale wind power penetration
    • 10.1109/APPEEC.2012.6307099
    • H. Chen, J. Wang, and Y. Zhang Economic dispatch of hydro-thermal power system with large-scale wind power penetration Power and Energy Engineering Conference (APPEEC), 2012 Asia-Pacific 2012 1 4 10.1109/APPEEC.2012.6307099
    • (2012) Power and Energy Engineering Conference (APPEEC), 2012 Asia-Pacific , pp. 1-4
    • Chen, H.1    Wang, J.2    Zhang, Y.3
  • 17
    • 65849274505 scopus 로고    scopus 로고
    • Optimization methods applied for solving the short-term hydrothermal coordination problem
    • M. El-Hawary, and I. Farhat Optimization methods applied for solving the short-term hydrothermal coordination problem Electr. Power Syst. Res. 79 1 2009 1308 1320
    • (2009) Electr. Power Syst. Res. , vol.79 , Issue.1 , pp. 1308-1320
    • El-Hawary, M.1    Farhat, I.2
  • 19
    • 84899484720 scopus 로고    scopus 로고
    • 2} abatement strategies
    • 10.1016/j.jclepro.2014.01.005 Special volume: {PSE} Asia for Cleaner Production
    • 2} abatement strategies J. Clean. Prod. 71 0 2014 40 47 10.1016/j.jclepro.2014.01. 005 Special volume: {PSE} Asia for Cleaner Production
    • (2014) J. Clean. Prod. , vol.71 , Issue.0 , pp. 40-47
    • Lee, M.Y.1    Hashim, H.2
  • 20
    • 84861911028 scopus 로고    scopus 로고
    • Environmental and economic aspects of higher res penetration into Macedonian power system
    • 10.1016/j.applthermaleng.2011.10.042
    • B. Ćosića, N. Markovskab, G. Krajačić, V. Taseskab, and N. Dui&cacute Environmental and economic aspects of higher res penetration into Macedonian power system Appl. Therm. Eng. 43 2012 158 162 10.1016/j.applthermaleng.2011.10.042
    • (2012) Appl. Therm. Eng. , vol.43 , pp. 158-162
    • Ćosića, B.1    Markovskab, N.2    Krajačić, G.3    Taseskab, V.4    Dui5    Cacute, N.6
  • 21
    • 84886431438 scopus 로고    scopus 로고
    • Power grid simulation model for long term operation planning
    • 10.3303/CET1335184
    • J. Zábojník, and M. Dvořák Power grid simulation model for long term operation planning Chem. Eng. Trans. 35 2013 1105 1110 10.3303/CET1335184
    • (2013) Chem. Eng. Trans. , vol.35 , pp. 1105-1110
    • Zábojník, J.1    Dvořák, M.2
  • 22
    • 77951164803 scopus 로고    scopus 로고
    • Minimum up/down polytopes of the unit commitment problem with start-up costs
    • accessed 02.05.14
    • D. Rajan, S. Takriti, Minimum Up/Down Polytopes of the Unit Commitment Problem with Start-up Costs, IBM res. report RC23628. URL domino.research.ibm. com/library/cyberdig.nsf/1e4115aea78b6e7c85256b360066f0d4/ cdcb02a7c809d89e8525702300502ac0?OpenDocument (accessed 02.05.14).
    • IBM Res. Report RC23628
    • Rajan, D.1    Takriti, S.2
  • 23
    • 84867028133 scopus 로고    scopus 로고
    • Gurobi Optimization, Inc. accessed 02.05.14
    • Gurobi Optimization, Inc. Gurobi optimizer reference manual URL www.gurobi.com 2014 (accessed 02.05.14)
    • (2014) Gurobi Optimizer Reference Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.