메뉴 건너뛰기




Volumn 22, Issue 3, 2007, Pages 1351-1359

Hydrothermal scheduling using benders decomposition: Accelerating techniques

Author keywords

Benders decomposition; Hydrothermal scheduling; Optimal power flow; Unit commitment

Indexed keywords

ELECTRIC POWER TRANSMISSION NETWORKS; ITERATIVE METHODS; MATHEMATICAL MODELS; OPTIMIZATION; TRANSMISSION NETWORK CALCULATIONS;

EID: 34548027768     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2007.901751     Document Type: Article
Times cited : (86)

References (25)
  • 2
    • 0024054074 scopus 로고
    • An enhanced dynamic programming approach for unit commitment
    • Aug
    • J. H. Walter, G. H. S. Warner, and G. B. Sheblé, "An enhanced dynamic programming approach for unit commitment," IEEE Trans. Power Syst., vol. 3, no. 3, pp. 1201-1205, Aug. 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.3 , pp. 1201-1205
    • Walter, J.H.1    Warner, G.H.S.2    Sheblé, G.B.3
  • 3
    • 0026630768 scopus 로고
    • Short-term scheduling of thermal power systems
    • Baltimore, MD, May
    • G. Xiaohong, L. H. Yan, and J. A. Amalfi, "Short-term scheduling of thermal power systems," in Proc. 17th PICA Conf., Baltimore, MD, May 1991, pp. 120-126.
    • (1991) Proc. 17th PICA Conf , pp. 120-126
    • Xiaohong, G.1    Yan, L.H.2    Amalfi, J.A.3
  • 4
    • 0027649191 scopus 로고
    • Scheduling of Hydrothermal Power Systems
    • Aug
    • Y. Houzhong, P. B. Luh, X. Guan, and P. M. Rogan, "Scheduling of Hydrothermal Power Systems," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 1358-1365, Aug. 1993.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.3 , pp. 1358-1365
    • Houzhong, Y.1    Luh, P.B.2    Guan, X.3    Rogan, P.M.4
  • 5
    • 0034138641 scopus 로고    scopus 로고
    • Multiperiod optimal power flow using Benders decomposition
    • Feb
    • N. Alguacil and A. J. Conejo, "Multiperiod optimal power flow using Benders decomposition," IEEE Trans. Power Syst., vol. 15, no. 1, pp. 196-201, Feb. 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , Issue.1 , pp. 196-201
    • Alguacil, N.1    Conejo, A.J.2
  • 6
    • 34250363410 scopus 로고    scopus 로고
    • Unit commitment optimization considering the complete network modeling
    • E. Kuan, O. Año, and A. Vargas, "Unit commitment optimization considering the complete network modeling," in Proc. IEEE Porto Power Tech, 2001, vol. 3, p. 5.
    • (2001) Proc. IEEE Porto Power Tech , vol.3 , pp. 5
    • Kuan, E.1    Año, O.2    Vargas, A.3
  • 7
    • 34548042457 scopus 로고    scopus 로고
    • Predespacho de Potencia Reactiva en el Despacho Económico de Sistemas Hidrotérmicos Multinodales
    • Foz do Iguazú, Brazil, May, /FI-38.26
    • V. M. Doña, A. Hoese, and A. Vargas, "Predespacho de Potencia Reactiva en el Despacho Económico de Sistemas Hidrotérmicos Multinodales," IX ERLAC Foz do Iguazú, Brazil, May 2001, IX/FI-38.26.
    • IX ERLAC , vol.2001
    • Doña, V.M.1    Hoese, A.2    Vargas, A.3
  • 10
    • 0024001585 scopus 로고
    • Towards a more rigorous and practical unit commitment by Lagrangian relaxation
    • May
    • F. Zhuang and F. D. Galiana, "Towards a more rigorous and practical unit commitment by Lagrangian relaxation," IEEE Trans. Power Syst. vol. 3, no. 2, pp. 763-773, May 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.2 , pp. 763-773
    • Zhuang, F.1    Galiana, F.D.2
  • 11
    • 0026910527 scopus 로고
    • Daily generation scheduling optimization with transmission constraints: A new class of algorithms
    • Aug
    • J. Batut and A. Renaud, "Daily generation scheduling optimization with transmission constraints: A new class of algorithms," IEEE Trans. Power App. Syst., vol. PAS-7, no. 3, pp. 982-989, Aug. 1992.
    • (1992) IEEE Trans. Power App. Syst , vol.PAS-7 , Issue.3 , pp. 982-989
    • Batut, J.1    Renaud, A.2
  • 12
    • 0031270315 scopus 로고    scopus 로고
    • An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints
    • Nov
    • G. Xiaohong, N. Ernan, L. Renhou, and P. B. Luh, "An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints," IEEE Trans. Power Syst. vol. 12, no. 4, pp. 1775-1780, Nov. 1997.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.4 , pp. 1775-1780
    • Xiaohong, G.1    Ernan, N.2    Renhou, L.3    Luh, P.B.4
  • 13
    • 0029252684 scopus 로고
    • The generalized unit commitment problem
    • Feb
    • R. Baldick, "The generalized unit commitment problem," IEEE Trans. Power Syst., vol. 10, no. 1, pp. 465-475, Feb. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.1 , pp. 465-475
    • Baldick, R.1
  • 14
    • 0035506808 scopus 로고    scopus 로고
    • Hydrothermal scheduling by augmented Lagrangian: Consideration of transmission constraints and pumped-storage units
    • Nov
    • S. Al Agtash, "Hydrothermal scheduling by augmented Lagrangian: Consideration of transmission constraints and pumped-storage units," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 750-756, Nov. 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.4 , pp. 750-756
    • Al Agtash, S.1
  • 15
    • 0015419856 scopus 로고
    • Generalized Benders' Decomposition
    • A. M. Geoffrion, "Generalized Benders' Decomposition," J. Optim. Theory Appl., vol. 10, pp. 237-260, 1972.
    • (1972) J. Optim. Theory Appl , vol.10 , pp. 237-260
    • Geoffrion, A.M.1
  • 16
    • 8744301635 scopus 로고    scopus 로고
    • Optimal power flow: Solution techniques, requirements, and challenges
    • M. E. El Hawary, "Optimal power flow: Solution techniques, requirements, and challenges," IEEE Tutorial Course, 1996.
    • (1996) IEEE Tutorial Course
    • El Hawary, M.E.1
  • 18
    • 18944385771 scopus 로고    scopus 로고
    • Security-constrained Unit Commitment with AC constraints
    • May
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained Unit Commitment with AC constraints," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 1538-1550, May. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 1538-1550
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 19
    • 33646379100 scopus 로고    scopus 로고
    • AC Contingency dispatch based on security-constrained unit commitment
    • May
    • Y. Fu, M. Shahidehpour, and Z. Li, "AC Contingency dispatch based on security-constrained unit commitment," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 897-908, May 2006.
    • (2006) IEEE Trans. Power Syst , vol.21 , Issue.2 , pp. 897-908
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 20
    • 0032640594 scopus 로고    scopus 로고
    • Unit commitment with transmission security and voltage constraints
    • May
    • H. Ma and S. M. Shahidehpour, "Unit commitment with transmission security and voltage constraints," IEEE Trans. Power Syst., vol. 14, no. 2, pp. 757-764, May 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.2 , pp. 757-764
    • Ma, H.1    Shahidehpour, S.M.2
  • 21
    • 0032054538 scopus 로고    scopus 로고
    • Decomposition methods for water resources optimization models with fixed costs
    • Apr. 10
    • Watkins, Jr, D.W. McKinney, and C. Daene, "Decomposition methods for water resources optimization models with fixed costs," Adv. Water Res., vol. 21, no. 4, pp. 283-295, Apr. 10, 1998.
    • (1998) Adv. Water Res , vol.21 , Issue.4 , pp. 283-295
    • Watkins Jr, D.W.M.1    Daene, C.2
  • 22
    • 27144490723 scopus 로고    scopus 로고
    • A mixed integer programming solution for market clearing and reliability analysis
    • Jun. 12-16
    • S. Dan, R. Philbrick, and A. Ott, "A mixed integer programming solution for market clearing and reliability analysis," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 12-16, 2005, vol. 3, pp. 2724-2731.
    • (2005) Proc. IEEE Power Eng. Soc. General Meeting , vol.3 , pp. 2724-2731
    • Dan, S.1    Philbrick, R.2    Ott, A.3
  • 23
    • 34250337602 scopus 로고    scopus 로고
    • Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming
    • Sep. 10-13
    • J. Garcia-Gonzalez and G. A. Castro, "Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming," in Proc. IEEE Porto Power Tech, Sep. 10-13, 2001, vol. 3, p. 6.
    • (2001) Proc. IEEE Porto Power Tech , vol.3 , pp. 6
    • Garcia-Gonzalez, J.1    Castro, G.A.2
  • 24
    • 0026188604 scopus 로고
    • Convergence properties of generalized benders decomposition
    • Jul
    • N. V. Sahinidis and I. E. Grossmann, "Convergence properties of generalized benders decomposition," Comput. Chem. Eng., vol. 15, no. 7, pp. 481-491, Jul. 1991.
    • (1991) Comput. Chem. Eng , vol.15 , Issue.7 , pp. 481-491
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 25
    • 34548049655 scopus 로고    scopus 로고
    • Dash optimization Dash's Xpress-MP suite
    • Optimization Software Product for Modeling and Optimization, Online, Available
    • "Dash optimization Dash's Xpress-MP suite," Optimization Software Product for Modeling and Optimization. [Online]. Available: http://www.dashoptimization.com.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.