메뉴 건너뛰기




Volumn 17, Issue 8, 2011, Pages 1772-1779

Integration scheduling optimization for critical chain multi-project

Author keywords

Critical chain; Heuristic algorithms; Multi project; Resource scheduling method; Scheduling optimization

Indexed keywords

CONCEPT MODEL; CRITICAL CHAIN; HEURISTIC APPROACH; HEURISTIC SCHEDULING; MULTI-PROJECT; MULTI-PROJECT SCHEDULING; PER UNIT; RESOURCE CONFLICT; RESOURCE-SCHEDULING; SCHEDULING OPTIMIZATION;

EID: 80052806598     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (13)
  • 1
    • 0036643020 scopus 로고    scopus 로고
    • Project management and business development: Integrating strategy, structure, processes and projects
    • VAN DER MERWE A P. Project management and business development: integrating strategy, structure, processes and projects[J]. International Journal of Project Management, 2002, 20(5): 401-411.
    • (2002) International Journal of Project Management , vol.20 , Issue.5 , pp. 401-411
    • van der Merwe, A.P.1
  • 2
    • 0042622452 scopus 로고    scopus 로고
    • The resource allocation syndrome: The prime challenge of multi-project management
    • ENGWALLA M, JERBRANTB A. The resource allocation syndrome: the prime challenge of multi-project management[J]. International Journal of Project Management, 2003, 21: 403-409.
    • (2003) International Journal of Project Management , vol.21 , pp. 403-409
    • Engwalla, M.1    Jerbrantb, A.2
  • 3
    • 77649323222 scopus 로고    scopus 로고
    • Multi-project management based on critical chain method
    • Chinese source
    • YANG Xuesong, HU Hao. Multi-project management based on critical chain method[J]. Industrial Engineering and Management, 2005, 10(2): 48-52(in Chinese).
    • (2005) Industrial Engineering and Management , vol.10 , Issue.2 , pp. 48-52
    • Yang, X.1    Hu, H.2
  • 4
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington, Mass., USA: The North River Press Publishing Corporation
    • GOLDRATT E M. Critical chain[M]. Great Barrington, Mass., USA: The North River Press Publishing Corporation, 1997.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 5
    • 35348933296 scopus 로고    scopus 로고
    • Quantitative analysis of critical chain multiple project scheduling management
    • Chinese source
    • MA Guofeng, YOU Jianxin. Quantitative analysis of critical chain multiple project scheduling management[J]. Systems Engineering-Theory & Practice, 2007, 27(9): 54-60(in Chinese).
    • (2007) Systems Engineering-Theory & Practice , vol.27 , Issue.9 , pp. 54-60
    • Ma, G.1    You, J.2
  • 6
    • 80052816038 scopus 로고    scopus 로고
    • The analysis of scheduling optimization on critical chain method for multipleprojects
    • Chinese source
    • GUO Qingjun, LI Huimin, SAI Yunxiu. The analysis of scheduling optimization on critical chain method for multipleprojects[J]. Industrial Engineering and Management, 2008, 13(6): 41-45(in Chinese).
    • (2008) Industrial Engineering and Management , vol.13 , Issue.6 , pp. 41-45
    • Guo, Q.1    Li, H.2    Sai, Y.3
  • 8
    • 77957937659 scopus 로고    scopus 로고
    • A new CCPM(Critical Chain Project Management) scheduling algorithm based on resource conflict solution
    • Chinese source
    • LI Junting, WANG Runxiao, YANG Yuntao. A new CCPM(Critical Chain Project Management) scheduling algorithm based on resource conflict solution[J]. Journal of Northwestern Polytechnical University, 2010, 28(4): 547-552(in Chinese).
    • (2010) Journal of Northwestern Polytechnical University , vol.28 , Issue.4 , pp. 547-552
    • Li, J.1    Wang, R.2    Yang, Y.3
  • 10
    • 80052799842 scopus 로고    scopus 로고
    • A study on critical chain project network scheduling technology under double constraints
    • Chinese source
    • LI Junting, WANG Runxiao, YANG Yuntao. A study on critical chain project network scheduling technology under double constraints[J]. Industrial Engineering and Management, 2010, 15(3): 71-75(in Chinese).
    • (2010) Industrial Engineering and Management , vol.15 , Issue.3 , pp. 71-75
    • Li, J.1    Wang, R.2    Yang, Y.3
  • 11
    • 80052788956 scopus 로고    scopus 로고
    • Research on algorithms for solving resource-constrained project scheduling problems
    • Chinese source. Tianjin: Tianjin University
    • WANG Hong. Research on algorithms for solving resource-constrained project scheduling problems[D]. Tianjin: Tianjin University, 2005(in Chinese).
    • (2005)
    • Wang, H.1
  • 12
    • 80052784729 scopus 로고    scopus 로고
    • Research on heuristics optimizing methods for resource-constrained network scheduling
    • Chinese source. Xi'an: Northwestern Polytechnical University
    • BAI Sijun. Research on heuristics optimizing methods for resource-constrained network scheduling[D]. Xi'an: Northwestern Polytechnical University, 2007(in Chinese).
    • (2007)
    • Bai, S.1
  • 13
    • 80052804201 scopus 로고    scopus 로고
    • Research on critical chain multi-project based on priority
    • Chinese source
    • LIN Jingjing, ZHOU Guohua. Research on critical chain multi-project based on priority[J]. Science and Technology Management Research, 2009(8): 131-133(in Chinese).
    • (2009) Science and Technology Management Research , Issue.8 , pp. 131-133
    • Lin, J.1    Zhou, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.