메뉴 건너뛰기




Volumn 2014, Issue , 2014, Pages

A variable neighborhood MOEA/D for multiobjective test task scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

MARKOV PROCESSES; MULTITASKING;

EID: 84899475724     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2014/423621     Document Type: Article
Times cited : (21)

References (38)
  • 3
    • 34848819135 scopus 로고    scopus 로고
    • Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck this project was supported by the national natural science foundation of china (60274013; 60474002) and shanghai development found for science and technology (04dz11008)
    • DOI 10.1016/S1004-4132(07)60129-7, PII S1004413207601297
    • Zuo Y., Gu H. Y., Xi Y. G., Modified bottleneck-based heuristic for large-scale job-shop scheduling problem with a single bottleneck. Journal of Systems Engineering and Electronics 2007 18 3 556 565 10.1016/S1004-4132(07) 60129-7 (Pubitemid 47503845)
    • (2007) Journal of Systems Engineering and Electronics , vol.18 , Issue.3 , pp. 556-565
    • Yan, Z.1    Hanyu, G.2    Yugeng, X.3
  • 4
    • 79957742860 scopus 로고    scopus 로고
    • Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm
    • 2-s2.0-79957742860 10.1016/j.ijpe.2011.04.020
    • Al-Hinai N., Elmekkawy T. Y., Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm. International Journal of Production Economics 2011 132 2 279 291 2-s2.0-79957742860 10.1016/j.ijpe.2011.04.020
    • (2011) International Journal of Production Economics , vol.132 , Issue.2 , pp. 279-291
    • Al-Hinai, N.1    Elmekkawy, T.Y.2
  • 5
    • 84862798145 scopus 로고    scopus 로고
    • Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm
    • 2-s2.0-84859431085 10.1016/j.eswa.2012.01.211
    • Chen J. C., Wu C.-C., Chen C.-W., Chen K.-H., Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm. Expert Systems with Applications 2012 39 11 10016 10021 2-s2.0-84859431085 10.1016/j.eswa.2012.01.211
    • (2012) Expert Systems with Applications , vol.39 , Issue.11 , pp. 10016-10021
    • Chen, J.C.1    Wu, C.-C.2    Chen, C.-W.3    Chen, K.-H.4
  • 6
    • 69249206751 scopus 로고    scopus 로고
    • An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
    • 2-s2.0-69249206751 10.1016/j.ejor.2009.01.008
    • De Giovanni L., Pezzella F., An improved genetic algorithm for the distributed and flexible job-shop scheduling problem. European Journal of Operational Research 2010 200 2 395 408 2-s2.0-69249206751 10.1016/j.ejor.2009. 01.008
    • (2010) European Journal of Operational Research , vol.200 , Issue.2 , pp. 395-408
    • De Giovanni, L.1    Pezzella, F.2
  • 7
    • 84861871365 scopus 로고    scopus 로고
    • Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling
    • 10.1016/j.asoc.2012.03.025 2-s2.0-84859544842
    • Lei D., Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling. Applied Soft Computing Journal 2012 12 8 2237 2245 10.1016/j.asoc.2012.03.025 2-s2.0-84859544842
    • (2012) Applied Soft Computing Journal , vol.12 , Issue.8 , pp. 2237-2245
    • Lei, D.1
  • 8
    • 70350113814 scopus 로고    scopus 로고
    • A hybrid immune simulated annealing algorithm for the job shop scheduling problem
    • 2-s2.0-70350113814 10.1016/j.asoc.2009.06.008
    • Zhang R., Wu C., A hybrid immune simulated annealing algorithm for the job shop scheduling problem. Applied Soft Computing Journal 2010 10 1 79 89 2-s2.0-70350113814 10.1016/j.asoc.2009.06.008
    • (2010) Applied Soft Computing Journal , vol.10 , Issue.1 , pp. 79-89
    • Zhang, R.1    Wu, C.2
  • 9
    • 81855218582 scopus 로고    scopus 로고
    • A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    • 2-s2.0-81855218582 10.1016/j.eswa.2011.08.029
    • Damodaran P., Vélez-Gallego M. C., A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times. Expert Systems with Applications 2012 39 1 1451 1458 2-s2.0-81855218582 10.1016/j.eswa.2011.08.029
    • (2012) Expert Systems with Applications , vol.39 , Issue.1 , pp. 1451-1458
    • Damodaran, P.1    Vélez-Gallego, M.C.2
  • 10
    • 80053560834 scopus 로고    scopus 로고
    • Parallel machine scheduling problem to minimize the makespan with resource dependent processing times
    • 2-s2.0-80053560834 10.1016/j.asoc.2011.05.005
    • Li K., Shi Y., Yang S.-L., Cheng B.-Y., Parallel machine scheduling problem to minimize the makespan with resource dependent processing times. Applied Soft Computing Journal 2011 11 8 5551 5557 2-s2.0-80053560834 10.1016/j.asoc.2011.05.005
    • (2011) Applied Soft Computing Journal , vol.11 , Issue.8 , pp. 5551-5557
    • Li, K.1    Shi, Y.2    Yang, S.-L.3    Cheng, B.-Y.4
  • 11
    • 81555213556 scopus 로고    scopus 로고
    • A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
    • 2-s2.0-81555213556 10.1016/j.cor.2011.10.007
    • Zhang Q., Manier H., Manier M.-A., A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Computers and Operations Research 2012 39 7 1713 1723 2-s2.0-81555213556 10.1016/j.cor.2011.10.007
    • (2012) Computers and Operations Research , vol.39 , Issue.7 , pp. 1713-1723
    • Zhang, Q.1    Manier, H.2    Manier, M.-A.3
  • 12
    • 84856420903 scopus 로고    scopus 로고
    • A combination of shuffled frog leaping and fuzzy logic for flexible job-shop scheduling problems
    • 10.1016/j.procs.2011.08.015
    • Teekeng W., Thammano A., A combination of shuffled frog leaping and fuzzy logic for flexible job-shop scheduling problems. Procedia Computer Science 2011 6 69 75 10.1016/j.procs.2011.08.015
    • (2011) Procedia Computer Science , vol.6 , pp. 69-75
    • Teekeng, W.1    Thammano, A.2
  • 13
    • 67349174559 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
    • 2-s2.0-67349174559 10.1016/j.cie.2008.07.021
    • Zhang G., Shao X., Li P., Gao L., An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem. Computers and Industrial Engineering 2009 56 4 1309 1318 2-s2.0-67349174559 10.1016/j.cie.2008.07.021
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.4 , pp. 1309-1318
    • Zhang, G.1    Shao, X.2    Li, P.3    Gao, L.4
  • 14
    • 84857456346 scopus 로고    scopus 로고
    • A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem
    • 2-s2.0-84857456346 10.1007/s00170-011-3437-9
    • Rahmati S. H. A., Zandieh M., A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem. The International Journal of Advanced Manufacturing Technology 2012 58 9-12 1115 1129 2-s2.0-84857456346 10.1007/s00170-011-3437-9
    • (2012) The International Journal of Advanced Manufacturing Technology , vol.58 , Issue.9-12 , pp. 1115-1129
    • Rahmati, S.H.A.1    Zandieh, M.2
  • 15
    • 84888640770 scopus 로고    scopus 로고
    • Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problem
    • 10.1007/s00170-012-4701-3
    • Shao X. Y., Liu W. Q., Liu Q., Zhang C. Y., Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problem. The International Journal of Advanced Manufacturing Technology 2013 67 9-12 2885 2901 10.1007/s00170-012-4701-3
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.67 , Issue.9-12 , pp. 2885-2901
    • Shao, X.Y.1    Liu, W.Q.2    Liu, Q.3    Zhang, C.Y.4
  • 18
    • 84868569681 scopus 로고    scopus 로고
    • Parallel test task scheduling with constraints based on hybrid particle swarm optimization and taboo search
    • Lu H., Chen X., Liu J., Parallel test task scheduling with constraints based on hybrid particle swarm optimization and taboo search. Chinese Journal of Electronics 2012 21 4 615 618
    • (2012) Chinese Journal of Electronics , vol.21 , Issue.4 , pp. 615-618
    • Lu, H.1    Chen, X.2    Liu, J.3
  • 20
    • 84885663334 scopus 로고    scopus 로고
    • A chaotic non-dominated sorting genetic algorithm for the multi-objective automatic test task scheduling problem
    • 10.1016/j.asoc.2012.10.001
    • Lu H., Niu R. Y., Liu J., Zhu Z., A chaotic non-dominated sorting genetic algorithm for the multi-objective automatic test task scheduling problem. Applied Soft Computing 2013 13 5 2790 2802 10.1016/j.asoc.2012.10.001
    • (2013) Applied Soft Computing , vol.13 , Issue.5 , pp. 2790-2802
    • Lu, H.1    Niu, R.Y.2    Liu, J.3    Zhu, Z.4
  • 21
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • Deb K., Pratap A., Agarwal S., Meyarivan T., A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation 2002 6 2 182 197 2-s2.0-0036530772 10.1109/4235.996017 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 22
    • 84884743577 scopus 로고    scopus 로고
    • Solution of reactive power dispatch of power systems by an opposition-based gravitational search algorithm
    • 10.1016/j.ijepes.2013.08.010
    • Show B., Mukherjee V., Ghoshal S. P., Solution of reactive power dispatch of power systems by an opposition-based gravitational search algorithm. Electrical Power and Energy Systems 2014 55 29 40 10.1016/j.ijepes.2013.08.010
    • (2014) Electrical Power and Energy Systems , vol.55 , pp. 29-40
    • Show, B.1    Mukherjee, V.2    Ghoshal, S.P.3
  • 23
    • 34548304093 scopus 로고    scopus 로고
    • Environmental/economic power dispatch using a fuzzified multi-objective particle swarm optimization algorithm
    • DOI 10.1016/j.epsr.2006.11.012, PII S0378779606002859
    • Wang L., Singh C., Environmental/economic power dispatch using a fuzzified multi-objective particle swarm optimization algorithm. Electric Power Systems Research 2007 77 12 1654 1664 2-s2.0-34548304093 10.1016/j.epsr.2006.11. 012 (Pubitemid 47348219)
    • (2007) Electric Power Systems Research , vol.77 , Issue.12 , pp. 1654-1664
    • Wang, L.1    Singh, C.2
  • 25
    • 34548108555 scopus 로고    scopus 로고
    • MOEA/D: A multiobjective evolutionary algorithm based on decomposition
    • DOI 10.1109/TEVC.2007.892759
    • Zhang Q., Li H., MOEA/D: a multiobjective evolutionary algorithm based on decomposition. IEEE Transactions on Evolutionary Computation 2007 11 6 712 731 2-s2.0-34548108555 10.1109/TEVC.2007.892759 (Pubitemid 350187486)
    • (2007) IEEE Transactions on Evolutionary Computation , vol.11 , Issue.6 , pp. 712-731
    • Zhang, Q.1    Li, H.2
  • 26
    • 84875724394 scopus 로고    scopus 로고
    • MOEA/D+ uniform design: A new version of MOEA/D for optimization problems with many objectives
    • 2-s2.0-84855864337 10.1016/j.cor.2012.01.001
    • Tan Y.-Y., Jiao Y.-C., Li H., Wang X.-K., MOEA/D+ uniform design: a new version of MOEA/D for optimization problems with many objectives. Computers and Operations Research 2012 2-s2.0-84855864337 10.1016/j.cor.2012.01.001
    • (2012) Computers and Operations Research
    • Tan, Y.-Y.1    Jiao, Y.-C.2    Li, H.3    Wang, X.-K.4
  • 28
    • 84869459387 scopus 로고    scopus 로고
    • A study of two penalty-parameterless constraint handling techniques in the framework of MOEA/D
    • Jan M. A., Khanum R. A., A study of two penalty-parameterless constraint handling techniques in the framework of MOEA/D. Applied Soft Computing 2012 13 1 128 148
    • (2012) Applied Soft Computing , vol.13 , Issue.1 , pp. 128-148
    • Jan, M.A.1    Khanum, R.A.2
  • 29
    • 58149236790 scopus 로고    scopus 로고
    • Comparison between MOEA/D and NSGA-II on the multi-objective travelling salesman problem
    • 2-s2.0-58149236790 10.1007/978-3-540-88051-6-14
    • Peng W., Zhang Q., Li H., Comparison between MOEA/D and NSGA-II on the multi-objective travelling salesman problem. Studies in Computational Intelligence 2009 171 309 324 2-s2.0-58149236790 10.1007/978-3-540-88051-6-14
    • (2009) Studies in Computational Intelligence , vol.171 , pp. 309-324
    • Peng, W.1    Zhang, Q.2    Li, H.3
  • 31
    • 84863683209 scopus 로고    scopus 로고
    • Capacitated stochastic coloured Petri net-based approach for computing two-terminal reliability of multi-state network
    • Zhang T., Guo B., Tan Y., Capacitated stochastic coloured Petri net-based approach for computing two-terminal reliability of multi-state network. Journal of Systems Engineering and Electronics 2012 23 2 304 313
    • (2012) Journal of Systems Engineering and Electronics , vol.23 , Issue.2 , pp. 304-313
    • Zhang, T.1    Guo, B.2    Tan, Y.3
  • 32
    • 0003816844 scopus 로고
    • New York, NY, USA Springer
    • Bollobas B., Graph Theory 1979 New York, NY, USA Springer
    • (1979) Graph Theory
    • Bollobas, B.1
  • 34
    • 10444256568 scopus 로고    scopus 로고
    • Multi-objective evolutionary algorithm and its convergence
    • 2-s2.0-10444256568
    • Zhou Y.-R., Min H.-Q., Xu X.-Y., Li Y.-X., Multi-objective evolutionary algorithm and its convergence. Chinese Journal of Computers 2004 27 10 1415 1421 2-s2.0-10444256568
    • (2004) Chinese Journal of Computers , vol.27 , Issue.10 , pp. 1415-1421
    • Zhou, Y.-R.1    Min, H.-Q.2    Xu, X.-Y.3    Li, Y.-X.4
  • 36
    • 84865717993 scopus 로고    scopus 로고
    • Convergence of multi-objective evolutionary computation to its pareto optimal set
    • Zhang Q., Dong L., Jiang F., Zhu X. J., Convergence of multi-objective evolutionary computation to its pareto optimal set. Systems Engineering and Electronics 2000 22 8 17 21
    • (2000) Systems Engineering and Electronics , vol.22 , Issue.8 , pp. 17-21
    • Zhang, Q.1    Dong, L.2    Jiang, F.3    Zhu, X.J.4
  • 37
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • 2-s2.0-79951579853 10.1016/j.eswa.2010.12.043
    • Moradi E., Fatemi Ghomi S. M. T., Zandieh M., Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Systems with Applications 2011 38 6 7169 7178 2-s2.0-79951579853 10.1016/j.eswa.2010.12.043
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.