메뉴 건너뛰기




Volumn 39, Issue 7, 2012, Pages 1713-1723

A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times

Author keywords

Bounded processing times; Disjunctive graph; Flexible Job Shop Scheduling Problem with transportation; Flexible manufacturing system; Genetic algorithm; Robotic cell; Surface treatment facility; Tabu search

Indexed keywords

DISJUNCTIVE GRAPH; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; FLEXIBLE MANUFACTURING; PROCESSING TIME; ROBOTIC CELL;

EID: 81555213556     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.10.007     Document Type: Article
Times cited : (153)

References (46)
  • 2
    • 1042300749 scopus 로고    scopus 로고
    • A comprehensive survey and future trend of simulation study on FMS scheduling
    • F. Chan, and H. Chan A comprehensive survey and future trend of simulation study on FMS scheduling Journal of Intelligent Manufacturing 15 1 2004 87 102
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.1 , pp. 87-102
    • Chan, F.1    Chan, H.2
  • 4
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • I. Sabuncuoglu, and S. Karabuk Rescheduling frequency in an FMS with uncertain processing times and unreliable machines Journal of Manufacturing Systems 18 4 1999 268 283
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 5
    • 0029253721 scopus 로고    scopus 로고
    • FMS planning decisions, operating flexibilities, and system performance
    • K. Stecke, and N. Raman FMS planning decisions, operating flexibilities, and system performance IEEE Transactions on Engineering Management 42 1 2002 82 90
    • (2002) IEEE Transactions on Engineering Management , vol.42 , Issue.1 , pp. 82-90
    • Stecke, K.1    Raman, N.2
  • 7
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • Y. Crama, and J. Van de Klundert Cyclic scheduling of identical parts in a robotic cell Operations Research 45 6 1997 952 965 (Pubitemid 127684775)
    • (1997) Operations Research , vol.45 , Issue.6 , pp. 952-965
    • Crama, Y.1    Van De Klundert, J.2
  • 8
    • 0002868454 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Complexity and steady state analysis
    • PII S0377221796003335
    • N.G. Hall, H. Kamounb, and C. Sriskandarajah Scheduling in robotic cells: complexity and steady state analysis European Journal of Operational Research 109 1 1998 43 65 (Pubitemid 128393228)
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 43-65
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 10
    • 0032167348 scopus 로고    scopus 로고
    • Periodic scheduling of a transporting robot under incomplete input data: A fuzzy approach
    • PII S0165011496003879
    • E. Levner, L. Meyzin, and A. Ptuskin Periodic scheduling of a transporting robot under incomplete input data: a fuzzy approach Fuzzy Sets and Systems 98 1998 255 266 (Pubitemid 128654933)
    • (1998) Fuzzy Sets and Systems , vol.98 , Issue.3 , pp. 255-266
    • Levner, E.1    Meyzin, L.2    Ptuskin, A.3
  • 13
    • 0141556617 scopus 로고    scopus 로고
    • PhD Thesis. Fachbereich Mathematik/Informatik Universitat Osnabruck
    • Knust S. Shop-scheduling problem with transportation. PhD Thesis. Fachbereich Mathematik/Informatik Universitat Osnabruck; 1999.
    • (1999) Shop-scheduling Problem with Transportation
    • Knust, S.1
  • 14
    • 8344272087 scopus 로고    scopus 로고
    • Tabu search algorithms for job-shop problems with a single transport robot
    • J. Hurink, and S. Knust Tabu search algorithms for job-shop problems with a single transport robot European Journal of Operational Research 162 1 2005 99 111
    • (2005) European Journal of Operational Research , vol.162 , Issue.1 , pp. 99-111
    • Hurink, J.1    Knust, S.2
  • 15
    • 81555205265 scopus 로고    scopus 로고
    • A disjunctive graph for the job-shop with several robots
    • P. Lacomme, M. Larabi, and N. Tchernev A disjunctive graph for the job-shop with several robots MISTA conference 2007 285 292
    • (2007) MISTA Conference , pp. 285-292
    • Lacomme, P.1    Larabi, M.2    Tchernev, N.3
  • 16
    • 39449127609 scopus 로고    scopus 로고
    • A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
    • DOI 10.1080/00207540600818286, PII 771140704
    • L. Deroussi, M. Gourgand, and N. Tchernev A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles International Journal of Production Research 46 8 2008 2143 2164 (Pubitemid 351272734)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2143-2164
    • Deroussi, L.1    Gourgand, M.2    Tchernev, N.3
  • 17
    • 79251642703 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
    • H. Gong, and L. Tang Two-machine flowshop scheduling with intermediate transportation under job physical space consideration Computers & Operations Research 8 9 2011 1267 1274
    • (2011) Computers & Operations Research , vol.8 , Issue.9 , pp. 1267-1274
    • Gong, H.1    Tang, L.2
  • 21
    • 79959824390 scopus 로고    scopus 로고
    • Intelligent scenario selection in dynamic hoist scheduling problem: The real-life electroplating production line case analysis
    • K. Kujawski, and J. Świa̧tek Intelligent scenario selection in dynamic hoist scheduling problem: the real-life electroplating production line case analysis Proceedings of the world congress on engineering vol. 3 2010
    • (2010) Proceedings of the World Congress on Engineering , vol.3
    • Kujawski, K.1    Świa̧tek, J.2
  • 24
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • Ü. Bilge, and G. Ulusoy A time window approach to simultaneous scheduling of machines and material handling system in an FMS Operations Research 43 6 1995 1058 1070
    • (1995) Operations Research , vol.43 , Issue.6 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 25
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • G. Ulusoy, F. Sivrikaya-erifolu, and Ü. Bilge A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles Computers & Operations Research 24 4 1997 335 351
    • (1997) Computers & Operations Research , vol.24 , Issue.4 , pp. 335-351
    • Ulusoy, G.1    Sivrikaya-Erifolu, F.2    Bilge, U.3
  • 26
    • 33749651515 scopus 로고    scopus 로고
    • A genetic and set partitioning two-phase approach for the vehicle routing problem with time windows
    • DOI 10.1016/j.cor.2005.07.025, PII S0305054805002376
    • G. Alvarenga, G. Mateus, and G. De Tomi A genetic and set partitioning two-phase approach for the vehicle routing problem with time windows Computers & Operations Research 34 6 2007 1561 1584 (Pubitemid 44556982)
    • (2007) Computers and Operations Research , vol.34 , Issue.SPEC. ISS. 6 , pp. 1561-1584
    • Alvarenga, G.B.1    Mateus, G.R.2    De Tomi, G.3
  • 27
    • 0343953478 scopus 로고    scopus 로고
    • Self-organizing neural network approach for the single AGV routing problem
    • DOI 10.1016/S0377-2217(99)00032-6
    • M. Soylu, N. Özdemirel, and S. Kayaligil A self-organizing neural network approach for the single AGV routing problem European Journal of Operational Research 121 1 2000 124 137 (Pubitemid 30546349)
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 124-137
    • Soylu, M.1    Ozdemirel, N.E.2    Kayaligil, S.3
  • 28
    • 84867375240 scopus 로고    scopus 로고
    • A tabu search algorithm for scheduling a single robot in a job-shop environment
    • J. Hurink, and S. Knust A tabu search algorithm for scheduling a single robot in a job-shop environment Discrete Applied Mathematics 119 12 2002 181 203
    • (2002) Discrete Applied Mathematics , vol.119 , Issue.12 , pp. 181-203
    • Hurink, J.1    Knust, S.2
  • 29
    • 1342287294 scopus 로고    scopus 로고
    • A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
    • T. Abdelmaguid, A. Nassef, B. Kamal, and M. Hassan A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles International Journal of Production Research 42 2 2004 267 281
    • (2004) International Journal of Production Research , vol.42 , Issue.2 , pp. 267-281
    • Abdelmaguid, T.1    Nassef, A.2    Kamal, B.3    Hassan, M.4
  • 30
    • 33749665423 scopus 로고    scopus 로고
    • Scheduling and routing of automated guided vehicles: A hybrid approach
    • DOI 10.1016/j.cor.2005.07.004, PII S0305054805002108
    • A.I. Corréa, A. Langevin, and L.-M. Rousseau Scheduling and routing of automated guided vehicles: a hybrid approach Computers & Operations Research 34 6 2007 1688 1707 [part Special Issue: Odysseus 2003 second international workshop on freight transportation logistics. doi:10.1016/j.cor.2005.07.004 ] (Pubitemid 44556970)
    • (2007) Computers and Operations Research , vol.34 , Issue.SPEC. ISS. 6 , pp. 1688-1707
    • Correa, A.I.1    Langevin, A.2    Rousseau, L.-M.3
  • 32
    • 81555216200 scopus 로고    scopus 로고
    • Optimisation des systemes de production: Methodes stochastiques et approche multi-agents
    • Lacomme P. Optimisation des systemes de production: methodes stochastiques et approche multi-agents. FERRAND 2; 1998.
    • (1998) FERRAND 2
    • Lacomme, P.1
  • 33
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • L. Lei, and T. Wang Determining optimal cyclic hoist schedules in a single-hoist electroplating line IIE Transactions 26 2 1994 25 33
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.2
  • 34
    • 0034175276 scopus 로고    scopus 로고
    • Constraint-based model for the cyclic multi-hoists scheduling problem
    • DOI 10.1080/095372800232216
    • M. Manier, C. Varnier, and P. Baptiste Constraint-based model for the cyclic multi-hoists scheduling problem Production Planning & Control 11 3 2000 244 257 (Pubitemid 35394354)
    • (2000) Production Planning and Control , vol.11 , Issue.3 , pp. 244-257
    • Manier, M.-A.1    Varnier, C.2    Baptiste, P.3
  • 35
    • 42149153783 scopus 로고    scopus 로고
    • An evolutionary approach for the design and scheduling of electroplating facilities
    • M. Manier, and S. Lamrous An evolutionary approach for the design and scheduling of electroplating facilities Journal of Mathematical Modelling and Algorithms 7 2 2008 197 215
    • (2008) Journal of Mathematical Modelling and Algorithms , vol.7 , Issue.2 , pp. 197-215
    • Manier, M.1    Lamrous, S.2
  • 36
    • 0037404554 scopus 로고    scopus 로고
    • Single hoist cyclic scheduling with multiple tanks: A material handling solution
    • DOI 10.1016/S0305-0548(02)00043-6, PII S0305054802000436
    • Z. Zhou, and L. Li Single hoist cyclic scheduling with multiple tanks: a material handling solution Computers & Operations Research 30 6 2003 811 819 (Pubitemid 36175292)
    • (2003) Computers and Operations Research , vol.30 , Issue.6 , pp. 811-819
    • Zhou, Z.1    Li, L.2
  • 37
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • F. Glover Tabu search: a tutorial Interfaces 20 4 1990 74 94
    • (1990) Interfaces , vol.20 , Issue.4 , pp. 74-94
    • Glover, F.1
  • 39
    • 0032688343 scopus 로고    scopus 로고
    • Application of the simulated annealing algorithm to the combinatorial optimisation problem with permutation property: An investigation of generation mechanism
    • P. Tian, J. Ma, and D. Zhang Application of the simulated annealing algorithm to the combinatorial optimisation problem with permutation property: an investigation of generation mechanism European Journal of Operational Research 118 1 1999 81 94
    • (1999) European Journal of Operational Research , vol.118 , Issue.1 , pp. 81-94
    • Tian, P.1    Ma, J.2    Zhang, D.3
  • 40
    • 0026988817 scopus 로고
    • Genetic algorithms
    • J. Holland Genetic algorithms Scientific American 267 1 1992 66 72 (Pubitemid 23236500)
    • (1992) Scientific American , vol.267 , Issue.1 , pp. 66-72
    • Holland, J.H.1
  • 42
    • 33646014727 scopus 로고    scopus 로고
    • On the mean convergence time of multi-parent genetic algorithms without selection
    • C. Ting On the mean convergence time of multi-parent genetic algorithms without selection Advances in Artificial Life 2005 403 412
    • (2005) Advances in Artificial Life , pp. 403-412
    • Ting, C.1
  • 43
    • 84866762804 scopus 로고    scopus 로고
    • A disjunctive graph and shifting bottleneck heuristics for multi hoists scheduling problem
    • Zhang Q, Manier H, Manier MA. A disjunctive graph and shifting bottleneck heuristics for multi hoists scheduling problem. In: 18th IFAC World Congress Milano (Italy); 2011. p. 69638.
    • (2011) 18th IFAC World Congress Milano (Italy) , pp. 69638
    • Zhang, Q.1    Manier, H.2    Manier, M.A.3
  • 45
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • I. Kacem, S. Hammadi, and P. Borne Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic Mathematics and Computers in Simulation 60 35 2002 245 276
    • (2002) Mathematics and Computers in Simulation , vol.60 , Issue.35 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 46
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling program
    • L. Phillips, and P. Unger Mathematical programming solution of a hoist scheduling program AIIE Transactions 8 2 1976 219 225
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 219-225
    • Phillips, L.1    Unger, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.