|
Volumn , Issue , 2007, Pages 4839-4844
|
Optimizing the multi-UUT parallel test task scheduling based on multi-objective GASA
a a a a |
Author keywords
Automatic test system; Genetic simulated annealing algorithm (GASA); Makespan; Parallel efficiency; Parallel test; Speedup ratio; Task scheduling
|
Indexed keywords
ANNEALING;
AUTOMATIC TESTING;
BOOLEAN FUNCTIONS;
COMPUTER NETWORKS;
DIESEL ENGINES;
GENETIC ALGORITHMS;
MATHEMATICAL MODELS;
MULTIOBJECTIVE OPTIMIZATION;
MULTITASKING;
OPTIMIZATION;
PROGRAMMING THEORY;
SCHEDULING;
SCHEDULING ALGORITHMS;
TESTING;
AUTOMATIC TEST SYSTEM;
GENETIC SIMULATED ANNEALING ALGORITHM (GASA);
MAKESPAN;
PARALLEL EFFICIENCY;
PARALLEL TEST;
SPEEDUP RATIO;
TASK SCHEDULING;
SIMULATED ANNEALING;
|
EID: 51349139205
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/ICEMI.2007.4351273 Document Type: Conference Paper |
Times cited : (18)
|
References (6)
|