메뉴 건너뛰기




Volumn 240, Issue 2, 2016, Pages 641-659

The implication of time-based payment contract in the decentralized assembly system

Author keywords

Assembly system; Buffer time; Game theory; Time based payment contract

Indexed keywords


EID: 84897359903     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-014-1579-5     Document Type: Article
Times cited : (16)

References (27)
  • 1
    • 0032673721 scopus 로고    scopus 로고
    • Centralization of stocks: Retailers versus manufacturer
    • Anupindi, R., & Bassok, Y. (1999). Centralization of stocks: Retailers versus manufacturer. Management Science, 45(2), 178–191.
    • (1999) Management Science , vol.45 , Issue.2 , pp. 178-191
    • Anupindi, R.1    Bassok, Y.2
  • 2
    • 84870557105 scopus 로고    scopus 로고
    • Contracting with demand uncertainty under supply chain competition
    • Ai, X. Z., Chen, J., & Ma, J. H. (2012). Contracting with demand uncertainty under supply chain competition. Annals of Operations Research, 201(1), 17–38.
    • (2012) Annals of Operations Research , vol.201 , Issue.1 , pp. 17-38
    • Ai, X.Z.1    Chen, J.2    Ma, J.H.3
  • 3
    • 42749090824 scopus 로고    scopus 로고
    • Minimizing customer order lead-time in a two-stage assembly supply chain
    • Blocher, J. D., & Chhajed, D. (2008). Minimizing customer order lead-time in a two-stage assembly supply chain. Annals of Operations Research, 161(1), 25–52.
    • (2008) Annals of Operations Research , vol.161 , Issue.1 , pp. 25-52
    • Blocher, J.D.1    Chhajed, D.2
  • 4
    • 84971274588 scopus 로고    scopus 로고
    • Coordination and Incentive Contracts in Project Management under Asymmetric Information.working paper. UCLA Anderson school
    • Los angeles, Los angeles
    • Bayiz, M., & Corbett, C.J. (2005). Coordination and Incentive Contracts in Project Management under Asymmetric Information.working paper. UCLA Anderson school. University of California, Los angeles, Los angeles.
    • (2005) University of California
    • Bayiz, M.1    Corbett, C.J.2
  • 6
    • 13844276827 scopus 로고    scopus 로고
    • Supply chain coordination with revenue sharing contracts
    • Cachon, G., & Lariviere, M. (2005). Supply chain coordination with revenue sharing contracts. Management Science, 51(1), 30–44.
    • (2005) Management Science , vol.51 , Issue.1 , pp. 30-44
    • Cachon, G.1    Lariviere, M.2
  • 8
    • 5644241211 scopus 로고    scopus 로고
    • Revenue sharing and wholesale-price contracts in assembly systems with random demand
    • Gerchak, Y., & Wang, Y. (2004). Revenue sharing and wholesale-price contracts in assembly systems with random demand. Production and Operations Management, 13, 23–33.
    • (2004) Production and Operations Management , vol.13 , pp. 23-33
    • Gerchak, Y.1    Wang, Y.2
  • 10
    • 0030836901 scopus 로고    scopus 로고
    • A model of incentive contracts for just-in-time delivery
    • Grout, J. R. (1996). A model of incentive contracts for just-in-time delivery. European Journal of Operational Research, 96, 139–147.
    • (1996) European Journal of Operational Research , vol.96 , pp. 139-147
    • Grout, J.R.1
  • 11
    • 0032280498 scopus 로고    scopus 로고
    • Influencing a supplier using delivery windows: Its effect on the variance of flow time and on-time delivery
    • Grout, J. R. (1998). Influencing a supplier using delivery windows: Its effect on the variance of flow time and on-time delivery. Decision Science, 29(3), 747–764.
    • (1998) Decision Science , vol.29 , Issue.3 , pp. 747-764
    • Grout, J.R.1
  • 12
    • 33750008370 scopus 로고    scopus 로고
    • Coordination in decentralized assembly systems with uncertain component yields
    • Gurnani, H., & Gerchak, Y. (2007). Coordination in decentralized assembly systems with uncertain component yields. European Journal of Operational Research, 176(3), 1559–1576.
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1559-1576
    • Gurnani, H.1    Gerchak, Y.2
  • 14
    • 56549101461 scopus 로고    scopus 로고
    • On coordinating an assembly system under random yield and random demand
    • Guler, M. G., & Bilgic, T. (2009). On coordinating an assembly system under random yield and random demand. European Journal of Operational Research, 196(1), 342–350.
    • (2009) European Journal of Operational Research , vol.196 , Issue.1 , pp. 342-350
    • Guler, M.G.1    Bilgic, T.2
  • 15
    • 0031109379 scopus 로고    scopus 로고
    • Quick response in manufacturer-retailer channels
    • Iyer, A. V., & Bergen, M. E. (1997). Quick response in manufacturer-retailer channels. Management Science, 43(4), 559–570.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 559-570
    • Iyer, A.V.1    Bergen, M.E.2
  • 16
    • 4344612887 scopus 로고    scopus 로고
    • Order fill rate, leadtime variability, and advance demand information in an assemble to order system
    • Liu, Y. D., Song, J. S., & Yao, D. D. (2003). Order fill rate, leadtime variability, and advance demand information in an assemble to order system. Operations Research, 51(2), 292–308.
    • (2003) Operations Research , vol.51 , Issue.2 , pp. 292-308
    • Liu, Y.D.1    Song, J.S.2    Yao, D.D.3
  • 18
    • 0033455106 scopus 로고    scopus 로고
    • Optimal pacing in an assembly-based multi-stage production system
    • Liu, Jj, & Chen, H. (1999). Optimal pacing in an assembly-based multi-stage production system. Annals of Operations Research, 87, 87–101.
    • (1999) Annals of Operations Research , vol.87 , pp. 87-101
    • Liu, J.1    Chen, H.2
  • 19
    • 70449639538 scopus 로고    scopus 로고
    • Game-theoretic analyses of decentralized assembly supply chains: Non-cooperative equilibria versus coordination with cost-sharing contracts
    • Leng, M. M., & Parlar, M. (2010). Game-theoretic analyses of decentralized assembly supply chains: Non-cooperative equilibria versus coordination with cost-sharing contracts. European Journal of Operational Research, 204, 96–104.
    • (2010) European Journal of Operational Research , vol.204 , pp. 96-104
    • Leng, M.M.1    Parlar, M.2
  • 20
    • 84971219022 scopus 로고    scopus 로고
    • Optimal inventory levels in systems with common components. Working paper, W.E.Simon Graduate School of Business Administration, University of Rochester
    • Rudi, N. (1998). Optimal inventory levels in systems with common components. Working paper, W.E.Simon Graduate School of Business Administration, University of Rochester, N.Y.
    • (1998) N.Y
    • Rudi, N.1
  • 21
    • 77950476024 scopus 로고    scopus 로고
    • Supply chain operations: Assemble-to-order systems
    • Graves S, Kok RD, (eds), 11, North Holland, Amsterdam: The Netherlands
    • Song, J. S., & Zipkin, P. (2003). Supply chain operations: Assemble-to-order systems. In S. Graves & R. D. Kok (Eds.), Hand books in operations research and management science (Vol. 11). Amsterdam: North Holland. The Netherlands.
    • (2003) Hand books in operations research and management science
    • Song, J.S.1    Zipkin, P.2
  • 22
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble to order with random leadtimes
    • Song, J. S., & Yao, D. D. (2002). Performance analysis and optimization of assemble to order with random leadtimes. Operations Research, 50(5), 889–903.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 889-903
    • Song, J.S.1    Yao, D.D.2
  • 23
    • 0033207842 scopus 로고    scopus 로고
    • The quantity flexibility contract and supplier–customer incentives
    • Tsay, A. (1999). The quantity flexibility contract and supplier–customer incentives. Management Science, 45(10), 1339–1358.
    • (1999) Management Science , vol.45 , Issue.10 , pp. 1339-1358
    • Tsay, A.1
  • 24
    • 0037431665 scopus 로고    scopus 로고
    • The detailed coordination problem in a two-level assembly system with stochastic leadtimes
    • Tang, O., & Grubbstrom, R. W. (2003). The detailed coordination problem in a two-level assembly system with stochastic leadtimes. International Journal of Production Economics, 81, 415–429.
    • (2003) International Journal of Production Economics , vol.81 , pp. 415-429
    • Tang, O.1    Grubbstrom, R.W.2
  • 26
    • 70449521201 scopus 로고    scopus 로고
    • Optimal decisions for assemble-to-order systems with uncertain assembly capacity
    • Xiao, Y. B., Chen, J., & Lee, C. Y. (2010). Optimal decisions for assemble-to-order systems with uncertain assembly capacity. International Journal of Production Economics, 123, 155–165.
    • (2010) International Journal of Production Economics , vol.123 , pp. 155-165
    • Xiao, Y.B.1    Chen, J.2    Lee, C.Y.3
  • 27
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano, C. (1987). Stochastic leadtimes in two-level assembly systems. IIE Transactions, 19, 371–378.
    • (1987) IIE Transactions , vol.19 , pp. 371-378
    • Yano, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.