메뉴 건너뛰기




Volumn 29, Issue 4, 2014, Pages 235-247

Optimal clustering of railroad track maintenance jobs

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL PROGRAMMING MODELS; MODEL AND ALGORITHMS; MUTUAL EXCLUSIONS; OPTIMAL CLUSTERING; PLANNING HORIZONS; SIDE CONSTRAINTS; TRACK MAINTENANCE; VEHICLE ROUTING PROBLEMS;

EID: 84896708294     PISSN: 10939687     EISSN: 14678667     Source Type: Journal    
DOI: 10.1111/mice.12036     Document Type: Article
Times cited : (60)

References (29)
  • 1
    • 77955643912 scopus 로고
    • Application of expert systems and network optimization techniques in rail relay scheduling
    • Acharya, D., Sussman, J. & Martland, C. (1990), Application of expert systems and network optimization techniques in rail relay scheduling, Journal of Transportation Research Forum, 31(1), 1-16.
    • (1990) Journal of Transportation Research Forum , vol.31 , Issue.1 , pp. 1-16
    • Acharya, D.1    Sussman, J.2    Martland, C.3
  • 4
    • 4344671948 scopus 로고    scopus 로고
    • Genetic algorithm-simulation methodology for pavement maintenance scheduling
    • Cheu, R. L., Wang, Y. & Fwa, T. F. (2004), Genetic algorithm-simulation methodology for pavement maintenance scheduling, Computer-Aided Civil and Infrastructure Engineering, 19(6), 446-55.
    • (2004) Computer-Aided Civil and Infrastructure Engineering , vol.19 , Issue.6 , pp. 446-455
    • Cheu, R.L.1    Wang, Y.2    Fwa, T.F.3
  • 6
    • 0001953950 scopus 로고
    • The truck dispatching problem
    • Dantzig, G. B. & Ramser, J. H. (1959), The truck dispatching problem. Management Science, 6(1), 80-91.
    • (1959) Management Science , vol.6 , Issue.1 , pp. 80-91
    • Dantzig, G.B.1    Ramser, J.H.2
  • 7
    • 0024640804 scopus 로고
    • A probabilistic heuristic for a computationally difficult set covering problem
    • Feo, T. A. & Resende, M. G. C. (1989), A probabilistic heuristic for a computationally difficult set covering problem, Operations Research Letters, 8, 67-71.
    • (1989) Operations Research Letters , vol.8 , pp. 67-71
    • Feo, T.A.1    Resende, M.G.C.2
  • 8
    • 84878782582 scopus 로고    scopus 로고
    • A Markov-based road maintenance optimization model considering user costs
    • Gao, H. & Zhang, X. (2013), A Markov-based road maintenance optimization model considering user costs. Computer-Aided Civil and Infrastructure Engineering, 28(6), 451-64.
    • (2013) Computer-Aided Civil and Infrastructure Engineering , vol.28 , Issue.6 , pp. 451-464
    • Gao, H.1    Zhang, X.2
  • 9
    • 84858159855 scopus 로고    scopus 로고
    • Network-level road pavement maintenance and rehabilitation scheduling for optimal performance improvement and budget utilization
    • Gao, L., Xie, C., Zhang, Z. & Waller, S. T. (2012), Network-level road pavement maintenance and rehabilitation scheduling for optimal performance improvement and budget utilization. Computer-Aided Civil and Infrastructure Engineering, 27(4), 276-87.
    • (2012) Computer-Aided Civil and Infrastructure Engineering , vol.27 , Issue.4 , pp. 276-287
    • Gao, L.1    Xie, C.2    Zhang, Z.3    Waller, S.T.4
  • 10
    • 0000994782 scopus 로고
    • A comparison of techniques for solving the fleet size and mix vehicle routing problem
    • Gheysens, F., Golden, B. & Assad, A. (1984), A comparison of techniques for solving the fleet size and mix vehicle routing problem, Operations Research Spektrum, 6(4), 207-16.
    • (1984) Operations Research Spektrum , vol.6 , Issue.4 , pp. 207-216
    • Gheysens, F.1    Golden, B.2    Assad, A.3
  • 12
    • 77955620029 scopus 로고    scopus 로고
    • Formulation and solution approaches to the rail maintenance production gang scheduling problem
    • Gorman, M. F. & Kanet, J. J. (2010), Formulation and solution approaches to the rail maintenance production gang scheduling problem, Journal of Transportation Engineering, 136(8), 701-08.
    • (2010) Journal of Transportation Engineering , vol.136 , Issue.8 , pp. 701-708
    • Gorman, M.F.1    Kanet, J.J.2
  • 13
    • 0032187645 scopus 로고    scopus 로고
    • Scheduling of railway track maintenance activities and crews
    • Higgins, A. (1998), Scheduling of railway track maintenance activities and crews, Journal of Operational Research Society, 49(10), 1026-33.
    • (1998) Journal of Operational Research Society , vol.49 , Issue.10 , pp. 1026-1033
    • Higgins, A.1
  • 14
    • 1542377406 scopus 로고    scopus 로고
    • Object-oriented model for freeway work zone capacity and queue delay estimation
    • Jiang, X. & Adeli, H. (2004), Object-oriented model for freeway work zone capacity and queue delay estimation, Computer-Aided Civil and Infrastructure Engineering, 19(2), 144-56.
    • (2004) Computer-Aided Civil and Infrastructure Engineering , vol.19 , Issue.2 , pp. 144-156
    • Jiang, X.1    Adeli, H.2
  • 18
    • 0032679511 scopus 로고    scopus 로고
    • The fleet size and mix vehicle routing problem with time windows
    • Liu, F.-H. & Shen S.-Y. (1999), The fleet size and mix vehicle routing problem with time windows, Journal of the Operational Research Society, 50, 721-32.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 721-732
    • Liu, F.-H.1    Shen, S.-Y.2
  • 20
    • 78649768580 scopus 로고    scopus 로고
    • Solving the Curfew Planning Problem
    • Nemani, A. K., Bog, S. & Ahuja, R. K. (2010), Solving the Curfew Planning Problem, Transportation Science, 44(4), 506-23.
    • (2010) Transportation Science , vol.44 , Issue.4 , pp. 506-523
    • Nemani, A.K.1    Bog, S.2    Ahuja, R.K.3
  • 21
    • 69149102428 scopus 로고    scopus 로고
    • Optimal long-term infrastructure maintenance planning accounting for traffic dynamics
    • Ng, M., Lin, D. Y. & Waller, S. T. (2009), Optimal long-term infrastructure maintenance planning accounting for traffic dynamics, Computer-Aided Civil and Infrastructure Engineering, 24, 459-69.
    • (2009) Computer-Aided Civil and Infrastructure Engineering , vol.24 , pp. 459-469
    • Ng, M.1    Lin, D.Y.2    Waller, S.T.3
  • 23
    • 84867622966 scopus 로고    scopus 로고
    • Track maintenance production team scheduling in railroad networks
    • Peng, F. & Ouyang, Y. (2012), Track maintenance production team scheduling in railroad networks, Transportation Research Part B., 46(10), 1474-88.
    • (2012) Transportation Research Part B. , vol.46 , Issue.10 , pp. 1474-1488
    • Peng, F.1    Ouyang, Y.2
  • 24
    • 84896731235 scopus 로고    scopus 로고
    • Periodical rail inspection scheduling in large-scale railroad networks. Working Paper, University of Illinois at Urbana-Champaign.
    • Peng, F., Ouyang, Y. & Somani, K. (2012), Periodical rail inspection scheduling in large-scale railroad networks. Working Paper, University of Illinois at Urbana-Champaign.
    • (2012)
    • Peng, F.1    Ouyang, Y.2    Somani, K.3
  • 25
    • 84856707836 scopus 로고    scopus 로고
    • Trend curve optimal control model for optimizing pavement maintenance strategies consisting of various treatments
    • Rashid, M. M. & Tsunokawa, T. (2012), Trend curve optimal control model for optimizing pavement maintenance strategies consisting of various treatments. Computer-Aided Civil and Infrastructure Engineering, 27(3), 155-69.
    • (2012) Computer-Aided Civil and Infrastructure Engineering , vol.27 , Issue.3 , pp. 155-169
    • Rashid, M.M.1    Tsunokawa, T.2
  • 26
    • 0001235540 scopus 로고
    • An analysis of several heuristics for the travelling salesman problem
    • Rosenkrantz, D., Sterns, R. & Lewis, P. (1977), An analysis of several heuristics for the travelling salesman problem, SIAM Journal on Computing, 6, 563-81.
    • (1977) SIAM Journal on Computing , vol.6 , pp. 563-581
    • Rosenkrantz, D.1    Sterns, R.2    Lewis, P.3
  • 29
    • 84863532454 scopus 로고    scopus 로고
    • Determining an optimal maintenance period for infrastructure systems
    • Zhang, X. & Gao, H. (2012), Determining an optimal maintenance period for infrastructure systems, Computer-Aided Civil and Infrastructure Engineering, 27(7), 543-54.
    • (2012) Computer-Aided Civil and Infrastructure Engineering , vol.27 , Issue.7 , pp. 543-554
    • Zhang, X.1    Gao, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.