메뉴 건너뛰기




Volumn 136, Issue 8, 2010, Pages 701-708

Formulation and solution approaches to the rail maintenance production gang scheduling problem

Author keywords

Crews; Gangs

Indexed keywords

CONSTRAINT PROGRAMMING; COST TRADE-OFF; CREWS; GANG SCHEDULING; GANGS; JOB SCHEDULING; MAINTENANCE PROJECTS; MIXED-INTEGER PROGRAMS; MODEL FORMULATION; NOVEL APPLICATIONS; RAIL INDUSTRY; RAIL MAINTENANCE; RAIL NETWORKS; RENEWAL PROJECTS; SOLUTION APPROACH; SOLUTION METHODOLOGY; SOLUTION QUALITY; SOLUTION TIME; TIME-SPACE NETWORKS; TRACK INFRASTRUCTURE; TRAIN DELAY;

EID: 77955620029     PISSN: 0733947X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-947X(2010)136:8(701)     Document Type: Article
Times cited : (29)

References (18)
  • 1
    • 77955643912 scopus 로고
    • Application of expert systems and network optimization techniques in rail relay scheduling
    • Acharya D, Sussman J, Martland C. Application of expert systems and network optimization techniques in rail relay scheduling. Journal of Transportation Research Forum 1990, 31(1):1-16.
    • (1990) Journal of Transportation Research Forum , vol.31 , Issue.1 , pp. 1-16
    • Acharya, D.1    Sussman, J.2    Martland, C.3
  • 2
    • 77955594603 scopus 로고    scopus 로고
    • The importance of adequate rail investment
    • Association of American Railroads (AARs), (August 13, 2008).
    • The importance of adequate rail investment. 2007a, Association of American Railroads (AARs), (August 13, 2008).
    • (2007)
  • 4
    • 77955605173 scopus 로고    scopus 로고
    • Spatial scheduling and resource selection: Modeling, algorithm, and application to production gang scheduling for railway maintenance operations
    • Working paper, Univ. of Texas at Austin.
    • Balakrishnan A, Li G, Roth B. Spatial scheduling and resource selection: Modeling, algorithm, and application to production gang scheduling for railway maintenance operations. 2006, Working paper, Univ. of Texas at Austin.
    • (2006)
    • Balakrishnan, A.1    Li, G.2    Roth, B.3
  • 6
    • 0033338820 scopus 로고    scopus 로고
    • Constraint satisfaction problems: Algorithms and applications
    • EJORDT, 0377-2217, 10.1016/S0377-2217(98)00364-6.
    • Brailsford SC, Potts CN, Smith BM. Constraint satisfaction problems: Algorithms and applications. Eur. J. Oper. Res. 1999, 119:557-581. EJORDT, 0377-2217, 10.1016/S0377-2217(98)00364-6.
    • (1999) Eur. J. Oper. Res. , vol.119 , pp. 557-581
    • Brailsford, S.C.1    Potts, C.N.2    Smith, B.M.3
  • 7
    • 16244364524 scopus 로고    scopus 로고
    • Vehicle routing problem with time windows. Part I: Route construction and local search algorithms. Part II: Metaheuristics
    • TRSCBJ, 0041-1655, 10.1287/trsc.1030.0056.
    • Bräysy O, Gendreau M. Vehicle routing problem with time windows. Part I: Route construction and local search algorithms. Part II: Metaheuristics. Transp. Sci. 2005, 39(1):104-118. TRSCBJ, 0041-1655, 10.1287/trsc.1030.0056.
    • (2005) Transp. Sci. , vol.39 , Issue.1 , pp. 104-118
    • Bräysy, O.1    Gendreau, M.2
  • 8
    • 10044296161 scopus 로고    scopus 로고
    • Maximizing use of a track possession
    • RTSTAR, 0033-9016,(11).
    • Burns D, Clem G. Maximizing use of a track possession. Railw. Track Struct. 2004, 92:31-33. RTSTAR, 0033-9016, (11).
    • (2004) Railw. Track Struct. , vol.92 , pp. 31-33
    • Burns, D.1    Clem, G.2
  • 9
    • 77955639660 scopus 로고    scopus 로고
    • Analyzing the blitz approach to M/W
    • RTSTAR, 0033-9016.
    • Burns D, Franke M. Analyzing the blitz approach to M/W. Railw. Track Struct. 2005, 93(12):24-26. RTSTAR, 0033-9016.
    • (2005) Railw. Track Struct. , vol.93 , Issue.12 , pp. 24-26
    • Burns, D.1    Franke, M.2
  • 10
    • 77957089136 scopus 로고
    • Time constrained routing and scheduling
    • M. O. Ball, T. L. Magnati, C. L. Monma, G. L. Nemhauser eds., North-Holland, Amsterdam, The Netherlands.
    • Desrosiers J, Dumas Y, Solomon M, Soumis F. Time constrained routing and scheduling. Handbooks in operations research and management science: Network routing 1995, 8:35-139. M. O. Ball, T. L. Magnati, C. L. Monma, G. L. Nemhauser, eds., North-Holland, Amsterdam, The Netherlands, .
    • (1995) Handbooks in operations research and management science: Network routing , vol.8 , pp. 35-139
    • Desrosiers, J.1    Dumas, Y.2    Solomon, M.3    Soumis, F.4
  • 12
    • 0041728549 scopus 로고    scopus 로고
    • An application of genetic and tabu searches to the freight railroad operating plan problem
    • ZZZZZZ, 0254-5330, 10.1023/A:1018906301828.
    • Gorman MF. An application of genetic and tabu searches to the freight railroad operating plan problem. Ann. Operat. Res. 1998, 78:51-69. ZZZZZZ, 0254-5330, 10.1023/A:1018906301828.
    • (1998) Ann. Operat. Res. , vol.78 , pp. 51-69
    • Gorman, M.F.1
  • 13
    • 33746052427 scopus 로고    scopus 로고
    • Cost-effectiveness of railway infrastructure renewal maintenance
    • JTPEDI, 0733-947X, 10.1061/(ASCE)0733-947X(2006)132:8(601).
    • Grimes A, Barkan C. Cost-effectiveness of railway infrastructure renewal maintenance. J. Transp. Eng. 2006, 132(8):601-607. JTPEDI, 0733-947X, 10.1061/(ASCE)0733-947X(2006)132:8(601).
    • (2006) J. Transp. Eng. , vol.132 , Issue.8 , pp. 601-607
    • Grimes, A.1    Barkan, C.2
  • 14
    • 0032187645 scopus 로고    scopus 로고
    • Scheduling of railway track maintenance activities and crews
    • 0160-5682.
    • Higgins A. Scheduling of railway track maintenance activities and crews. Journal of the Operational Research Society 1998, 49(10):1026-1033. 0160-5682.
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.10 , pp. 1026-1033
    • Higgins, A.1
  • 15
    • 85055822422 scopus 로고    scopus 로고
    • Constraint programming for scheduling
    • J. Leung, ed., Chapman and Hall, New York.
    • Kanet J, Ahire S, Gorman M. Constraint programming for scheduling. Handbook of scheduling 2004, J. Leung, ed., Chapman and Hall, New York.
    • (2004) Handbook of scheduling
    • Kanet, J.1    Ahire, S.2    Gorman, M.3
  • 16
    • 75949110636 scopus 로고    scopus 로고
    • Find more like this project control system development for a design/build project
    • COENDE, 0378-3839.
    • Li W, Carter D. Find more like this project control system development for a design/build project. Coastal Eng. 2002, 44(3):39-48. COENDE, 0378-3839.
    • (2002) Coastal Eng. , vol.44 , Issue.3 , pp. 39-48
    • Li, W.1    Carter, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.