메뉴 건너뛰기




Volumn 46, Issue 10, 2012, Pages 1474-1488

Track maintenance production team scheduling in railroad networks

Author keywords

Multiple neighborhood search; Railroad track maintenance; Scheduling; Side constraints; Time space network model

Indexed keywords

DECISION MAKING; OPTIMIZATION; RAILROAD TRANSPORTATION; RAILROADS; SCHEDULING;

EID: 84867622966     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2012.07.004     Document Type: Article
Times cited : (49)

References (22)
  • 1
    • 0002218917 scopus 로고
    • A computer-assisted system for the routing and scheduling of street sweepers
    • Bodin L.D., Kursh S.J. A computer-assisted system for the routing and scheduling of street sweepers. Operations Research 1978, 26(4):525-537.
    • (1978) Operations Research , vol.26 , Issue.4 , pp. 525-537
    • Bodin, L.D.1    Kursh, S.J.2
  • 4
    • 27744466329 scopus 로고    scopus 로고
    • Analyzing the blitz approach to m/w
    • Burns D., Franke M. Analyzing the blitz approach to m/w. Railway Track and Structures 2005, 101(10):33-38.
    • (2005) Railway Track and Structures , vol.101 , Issue.10 , pp. 33-38
    • Burns, D.1    Franke, M.2
  • 7
    • 0000624218 scopus 로고
    • Arc routing problem, Part II: the rural postman problem
    • Eiselt H.A., Gendreau M., Laporte G. Arc routing problem, Part II: the rural postman problem. Operations Research 1995, 43(3):399-414.
    • (1995) Operations Research , vol.43 , Issue.3 , pp. 399-414
    • Eiselt, H.A.1    Gendreau, M.2    Laporte, G.3
  • 8
    • 77955620029 scopus 로고    scopus 로고
    • Formulation and solution approaches to the rail maintenance production gang scheduling problem
    • Gorman M.F., Kanet J.J. Formulation and solution approaches to the rail maintenance production gang scheduling problem. Journal of Transportation Engineering 2010, 136(8):701-708.
    • (2010) Journal of Transportation Engineering , vol.136 , Issue.8 , pp. 701-708
    • Gorman, M.F.1    Kanet, J.J.2
  • 9
    • 33746052427 scopus 로고    scopus 로고
    • Cost-effectiveness of railway infrastructure renewal maintenance
    • Grimes G.A., Barkan C.P.L. Cost-effectiveness of railway infrastructure renewal maintenance. Journal of Transportation Engineering 2006, 132(8):601-608.
    • (2006) Journal of Transportation Engineering , vol.132 , Issue.8 , pp. 601-608
    • Grimes, G.A.1    Barkan, C.P.L.2
  • 10
    • 0032187645 scopus 로고    scopus 로고
    • Scheduling of railway track maintenance activities and crews
    • Higgins A. Scheduling of railway track maintenance activities and crews. Journal of Operational Research Society 1998, 49(10):1026-1033.
    • (1998) Journal of Operational Research Society , vol.49 , Issue.10 , pp. 1026-1033
    • Higgins, A.1
  • 13
    • 0026874435 scopus 로고
    • The vehicle routing problem: an overview of exact and approximate algorithms
    • Laporte G. The vehicle routing problem: an overview of exact and approximate algorithms. European Journal of Operational Research 1992, 59(3):345-358.
    • (1992) European Journal of Operational Research , vol.59 , Issue.3 , pp. 345-358
    • Laporte, G.1
  • 14
    • 84870252099 scopus 로고    scopus 로고
    • Effectively solving production gang scheduling problem for railway track maintenance projects
    • San Diego.
    • Li, G., Balakrishnan, A., Roth, B., 2009. Effectively solving production gang scheduling problem for railway track maintenance projects. Presented in INFORMS Annual Meeting 2009, San Diego.
    • (2009) Presented in INFORMS Annual Meeting 2009
    • Li, G.1    Balakrishnan, A.2    Roth, B.3
  • 16
    • 0015958417 scopus 로고
    • A fundamental problem in vehicle routing
    • Orloff C. A fundamental problem in vehicle routing. Networks 1974, 4(1):35-64.
    • (1974) Networks , vol.4 , Issue.1 , pp. 35-64
    • Orloff, C.1
  • 19
    • 33746218619 scopus 로고    scopus 로고
    • A survey of models and algorithms for winter road maintenance. Part IV: vehicle routing and fleet sizing for plowing and snow disposal
    • Perrier N., Langevin A., Campbell J.F. A survey of models and algorithms for winter road maintenance. Part IV: vehicle routing and fleet sizing for plowing and snow disposal. Computers & Operations Research 2007, 34(1):258-294.
    • (2007) Computers & Operations Research , vol.34 , Issue.1 , pp. 258-294
    • Perrier, N.1    Langevin, A.2    Campbell, J.F.3
  • 20
    • 0023313252 scopus 로고
    • Algorithms for the vehicle routing and scheduling problems with time window constraints
    • Solomon M.M. Algorithms for the vehicle routing and scheduling problems with time window constraints. Operations Research 1987, 35(2):254-265.
    • (1987) Operations Research , vol.35 , Issue.2 , pp. 254-265
    • Solomon, M.M.1
  • 21
    • 0041791136 scopus 로고    scopus 로고
    • SIAM, Philadelphia, PA, P. Toth, D. Vigo (Eds.)
    • The Vehicle Routing Problem 2001, SIAM, Philadelphia, PA. P. Toth, D. Vigo (Eds.).
    • (2001) The Vehicle Routing Problem


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.