-
2
-
-
84896456081
-
-
T. Simonite MIT Tech. Rev http://www.technologyreview.com/news/510191/ software-predicts-tomorrows-news-by-analyzing-todays-and-yesterdays/ June 30 2013
-
(2013)
MIT Tech. Rev
-
-
Simonite, T.1
-
3
-
-
0038823672
-
Automating hierarchical document classification for construction management information systems
-
C.H. Caldas, and L. Soibelman Automating hierarchical document classification for construction management information systems Autom. Constr. 12 4 2003 395 406
-
(2003)
Autom. Constr.
, vol.12
, Issue.4
, pp. 395-406
-
-
Caldas, C.H.1
Soibelman, L.2
-
4
-
-
0036160464
-
Data preparation process for construction knowledge generation through knowledge discovery in databases
-
DOI 10.1061/(ASCE)0887-3801(2002)16:1(39)
-
L. Soibelman, and H. Kim Data preparation process for construction knowledge generation through knowledge discovery in databases J. Comput. Civil Eng. 16 1 2002 39 48 (Pubitemid 34125182)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.1
, pp. 39-48
-
-
Soibelman, L.1
Kim, H.2
-
5
-
-
39449095825
-
Management and analysis of unstructured construction data types
-
DOI 10.1016/j.aei.2007.08.011, PII S147403460700050X
-
L. Soibelman, J. Wu, C. Caldas, I. Brilakis, and K.-Y. Lin Management and analysis of unstructured construction data types Adv. Eng. Inform. 22 1 2008 15 27 (Pubitemid 351273678)
-
(2008)
Advanced Engineering Informatics
, vol.22
, Issue.1
, pp. 15-27
-
-
Soibelman, L.1
Wu, J.2
Caldas, C.3
Brilakis, I.4
Lin, K.-Y.5
-
7
-
-
84863714416
-
Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables
-
H. Son, C. Kim, and C. Kim Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables Autom. Constr. 27 2012 60 66
-
(2012)
Autom. Constr.
, vol.27
, pp. 60-66
-
-
Son, H.1
Kim, C.2
Kim, C.3
-
8
-
-
56349122591
-
Estimating cost discrepancies in highway contracts: Multistep econometric approach
-
C. Gkritska, and S.S. Labi Estimating cost discrepancies in highway contracts: multistep econometric approach J. Constr. Eng. 134 12 2008 953 962
-
(2008)
J. Constr. Eng.
, vol.134
, Issue.12
, pp. 953-962
-
-
Gkritska, C.1
Labi, S.S.2
-
9
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
DOI 10.1061/(ASCE)0733-9364(2003)129:2(198)
-
S.M. Trost, and G.D. Oberlender Predicting accuracy of early cost estimates using factor analysis and multivariate regression J. Constr. Eng. 129 2 2003 198 204 (Pubitemid 40265489)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
10
-
-
27744523298
-
Evaluating cost overruns of asphalt paving project using statistical process control methods
-
DOI 10.1061/(ASCE)0733-9364(2005)131:11(1173)
-
K.M. Nassar, W.M. Nassar, and M.Y. Hegab Evaluating cost overruns of asphalt paving project using statistical process control methods J. Constr. Eng. 131 11 2005 1173 1178 (Pubitemid 41596024)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.11
, pp. 1173-1178
-
-
Nassar, K.M.1
Nassar, W.M.2
Hegab, M.Y.3
-
11
-
-
84862152230
-
Early cost estimating of road tunnel construction using neural networks
-
K. Petroutsatou, E. Georgopoulos, S. Lambropoulos, and J.P. Pantouvakis Early cost estimating of road tunnel construction using neural networks J. Constr. Eng. 138 6 2011 679 687
-
(2011)
J. Constr. Eng.
, vol.138
, Issue.6
, pp. 679-687
-
-
Petroutsatou, K.1
Georgopoulos, E.2
Lambropoulos, S.3
Pantouvakis, J.P.4
-
15
-
-
76749092270
-
The WEKA data mining software: An update
-
M. Hall, E. Frank, G. Holmes, B. Pfahringer, P. Reutemann, and I.H. Witten The WEKA data mining software: an update ACM SIGKDD Explor. Newsl. 11 1 2009 10 18
-
(2009)
ACM SIGKDD Explor. Newsl.
, vol.11
, Issue.1
, pp. 10-18
-
-
Hall, M.1
Frank, E.2
Holmes, G.3
Pfahringer, B.4
Reutemann, P.5
Witten, I.H.6
-
17
-
-
85013691898
-
-
Academic Press Waltham, MA
-
G. Miner, J. Elder, T. Hill, D. Delen, and A. Fast Practical Text Mining and Statistical Analysis for Non-Structured Text Data Applications 2012 Academic Press Waltham, MA
-
(2012)
Practical Text Mining and Statistical Analysis for Non-Structured Text Data Applications
-
-
Miner, G.1
Elder, J.2
Hill, T.3
Delen, D.4
Fast, A.5
-
18
-
-
0029403698
-
1995, Induction of ripple-down rules applied to modeling large databases
-
B.R. Gaines, and P. Compton 1995, Induction of ripple-down rules applied to modeling large databases J. Intell. Inf. Syst. 5 3 1995 211 228
-
(1995)
J. Intell. Inf. Syst.
, vol.5
, Issue.3
, pp. 211-228
-
-
Gaines, B.R.1
Compton, P.2
-
21
-
-
34848824629
-
Applications of support vector machines in chemistry
-
O. Ivanciuc Applications of support vector machines in chemistry Rev. Comput. Chem. 2007 23 2007 291
-
(2007)
Rev. Comput. Chem.
, vol.2007
, Issue.23
, pp. 291
-
-
Ivanciuc, O.1
-
23
-
-
33748611921
-
Ensemble based systems in decision making
-
R. Polikar Ensemble based systems in decision making IEEE Circuits Syst. Mag. 6 3 2006 21 45
-
(2006)
IEEE Circuits Syst. Mag.
, vol.6
, Issue.3
, pp. 21-45
-
-
Polikar, R.1
-
24
-
-
84855933541
-
A comparative study on feature reduction approaches in Hindi and Bengali named entity recognition
-
S.K. Saha, P. Mitra, and S. Sarkar A comparative study on feature reduction approaches in Hindi and Bengali named entity recognition Knowl. Based Syst. 27 2012 322 332
-
(2012)
Knowl. Based Syst.
, vol.27
, pp. 322-332
-
-
Saha, S.K.1
Mitra, P.2
Sarkar, S.3
-
25
-
-
70349342801
-
Construction project cost escalation factors
-
J.S. Shane, K.R. Molenaar, S. Anderson, and C. Schexnayder Construction project cost escalation factors J. Manag. Eng. 25 4 2009 221 229
-
(2009)
J. Manag. Eng.
, vol.25
, Issue.4
, pp. 221-229
-
-
Shane, J.S.1
Molenaar, K.R.2
Anderson, S.3
Schexnayder, C.4
|