-
1
-
-
0010131508
-
Forecasting economic magnitudes with neural network models
-
1083-0898, , 10.1007/BF02295547
-
Alonso-Rodriquez, A. (1999). Forecasting economic magnitudes with neural network models.. Int. Adv. Econ. Res. 1083-0898, 5 (4), 496-511. 10.1007/BF02295547
-
(1999)
Int. Adv. Econ. Res.
, vol.5
, Issue.4
, pp. 496-511
-
-
Alonso-Rodriquez, A.1
-
2
-
-
0033100590
-
Preliminary cost estimation of highway construction using neural networks
-
0013-8010
-
Al-Tabtabai, H., Alex, P. A., and Tantash, M. (1999). Preliminary cost estimation of highway construction using neural networks.. Cost Eng. J. 0013-8010, 41 (3), 19-24.
-
(1999)
Cost Eng. J.
, vol.41
, Issue.3
, pp. 19-24
-
-
Al-Tabtabai, H.1
Alex, P.A.2
Tantash, M.3
-
4
-
-
0003545802
-
-
Duxbury Press, Pacific Grove, CA
-
Berk, K., and Carey, P. (2000). Data analysis with Microsoft Excel, Duxbury Press, Pacific Grove, CA.
-
(2000)
Data Analysis with Microsoft Excel
-
-
Berk, K.1
Carey, P.2
-
5
-
-
0003577150
-
-
Wiley, New York
-
Berry, M. J. A., and Linoff, G. (1997). Data mining techniques: For marketing, sales and customer support, Wiley, New York.
-
(1997)
Data Mining Techniques: For Marketing, Sales and Customer Support
-
-
Berry, M.J.A.1
Linoff, G.2
-
6
-
-
0031700588
-
Neural networks for cost estimation
-
0274-9696
-
Bode, J. (1998). Neural networks for cost estimation.. Cost Eng. 0274-9696, 40 (1), 25-30.
-
(1998)
Cost Eng.
, vol.40
, Issue.1
, pp. 25-30
-
-
Bode, J.1
-
8
-
-
0002231440
-
Cost estimation of timber bridges using neural networks
-
0274-9696
-
Creese, R. C., and Li, L. (1995). Cost estimation of timber bridges using neural networks.. Cost Eng., 37 (5), 17-22. 0274-9696
-
(1995)
Cost Eng.
, vol.37
, Issue.5
, pp. 17-22
-
-
Creese, R.C.1
Li, L.2
-
9
-
-
0036744325
-
Data modelling and the application of a neural network approach to the prediction of total construction cost
-
0144-6193, , 10.1080/01446190210151050
-
Emsley, M. W., Lowe, D. J., Roy, Duff A., Harding, A., and Hickson, A. (2002). Data modelling and the application of a neural network approach to the prediction of total construction cost.. Constr. Manage. Econ. 0144-6193, 20 (6), 465-472. 10.1080/01446190210151050
-
(2002)
Constr. Manage. Econ.
, vol.20
, Issue.6
, pp. 465-472
-
-
Emsley, M.W.1
Lowe, D.J.2
Roy, D.A.3
Harding, A.4
Hickson, A.5
-
10
-
-
0028416331
-
Neural networks in civil engineering. I: Principles and understanding
-
0887-3801, , 10.1061/(ASCE)0887-3801(1994)8:2(131)
-
Flood, I., and Kartam, N. (1994). Neural networks in civil engineering. I: Principles and understanding.. J. Comput. Civ. Eng. 0887-3801, 8 (2), 131-162. 10.1061/(ASCE)0887-3801(1994)8:2(131)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.2
, pp. 131-162
-
-
Flood, I.1
Kartam, N.2
-
11
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
0733-9364, , 10.1061/(ASCE)0733-9364(1998)124:3(210)
-
Hegazy, T., and Ayed, A. (1998). Neural network model for parametric cost estimation of highway projects.. J. Constr. Eng. Manage. 0733-9364, 124 (3), 210-218. 10.1061/(ASCE)0733-9364(1998)124:3(210)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
12
-
-
0028320021
-
Developing practical neural network applications using back-propagation
-
10.1111/j.1467-8667.1994.tb00369.x
-
Hegazy, T., Fazio, P., and Moselhi, O. (1994). Developing practical neural network applications using back-propagation.. Microcomput. Civ. Eng., 9 (2), 145-159. 10.1111/j.1467-8667.1994.tb00369.x
-
(1994)
Microcomput. Civ. Eng.
, vol.9
, Issue.2
, pp. 145-159
-
-
Hegazy, T.1
Fazio, P.2
Moselhi, O.3
-
13
-
-
0028330587
-
Analogy-based solution to mark-up estimation problem
-
0887-3801, , 10.1061/(ASCE)0887-3801(1994)8:1(72)
-
Hegazy, T., and Moselhi, O. (1994). Analogy-based solution to mark-up estimation problem.. J. Comput. Civ. Eng. 0887-3801, 8 (1), 72-87. 10.1061/(ASCE)0887-3801(1994)8:1(72)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.1
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
14
-
-
0001368592
-
Applicability of the geological strength index (GSI) in the classification of very weak and sheered rock masses
-
1435-9529, 10.1007/s100640050031
-
Hoek, E., Marinos, P., and Benissi, M. (1998). Applicability of the geological strength index (GSI) in the classification of very weak and sheered rock masses.. Bull. Eng. Geol. Environ. 1435-9529, 57, 151-160. 10.1007/s100640050031
-
(1998)
Bull. Eng. Geol. Environ.
, vol.57
, pp. 151-160
-
-
Hoek, E.1
Marinos, P.2
Benissi, M.3
-
15
-
-
18144382336
-
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
-
0887-3801, , 10.1061/(ASCE)0887-3801(2005)19:2(208)
-
Kim, G. H., Seo, D. S., and Kang, K. I. (2005). Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates.. J. Comput. Civ. Eng. 0887-3801, 19 (2), 208-211. 10.1061/(ASCE)0887-3801(2005)19: 2(208)
-
(2005)
J. Comput. Civ. Eng.
, vol.19
, Issue.2
, pp. 208-211
-
-
Kim, G.H.1
Seo, D.S.2
Kang, K.I.3
-
16
-
-
84862132739
-
Cost, time and quality in Egnatia motorway
-
Institute of Management and Development of Technical Works (IDATE), Athens, Greece
-
Maravas, A., and Konstantinidis, D. (2003). Cost, time and quality in Egnatia motorway.. Proc., One-Day Symp. in Athens, Institute of Management and Development of Technical Works (IDATE), Athens, Greece.
-
(2003)
Proc., One-Day Symp. in Athens
-
-
Maravas, A.1
Konstantinidis, D.2
-
17
-
-
84862134037
-
An artificial neural network for the pre-estimation of construction costs for electrical and mechanical installations on road tunnels
-
Division of Construction Management and Engineering, Dept. of Civil Engineering, Middle East Technical Univ., Ankara, Turkey
-
Maravas, A., Pantouvakis, J. P., and Kaltsas, D. (2009). An artificial neural network for the pre-estimation of construction costs for electrical and mechanical installations on road tunnels.. Proc., 5th Conf. on Construction in the 21st Century (CITC-V), Collaboration and Integration in Engineering, Management and Technology, Division of Construction Management and Engineering, Dept. of Civil Engineering, Middle East Technical Univ., Ankara, Turkey, 33-40.
-
(2009)
Proc., 5th Conf. on Construction in the 21st Century (CITC-V), Collaboration and Integration in Engineering, Management and Technology
, pp. 33-40
-
-
Maravas, A.1
Pantouvakis, J.P.2
Kaltsas, D.3
-
18
-
-
0034753123
-
Estimating the geotechnical properties of heterogeneous rock masses such as flysch
-
1435-9529, 10.1007/s100640000090
-
Marinos, P., and Hoek, E. (2001). Estimating the geotechnical properties of heterogeneous rock masses such as flysch.. Bull. Eng. Geol. Environ. 1435-9529, 60, 85-92. 10.1007/s100640000090
-
(2001)
Bull. Eng. Geol. Environ.
, vol.60
, pp. 85-92
-
-
Marinos, P.1
Hoek, E.2
-
19
-
-
21244433538
-
-
Bull. Eng. Geol. Environ., , 10.1007/s10064-004-0270-5
-
Marinos, P., Marinos, V., and Hoek, E. (2005). The geological strength index: Applications and limitations.. Bull. Eng. Geol. Environ., 64 (1), 55-65. 10.1007/s10064-004-0270-5
-
(2005)
The Geological Strength Index: Applications and Limitations
, vol.64
, Issue.1
, pp. 55-65
-
-
Marinos, P.1
Marinos, V.2
Hoek, E.3
-
20
-
-
0031644126
-
Neural networks for cost estimating of structural steel buildings
-
American Association of Cost Engineers (AACE) International, Morgantown, WV
-
Moselhi, O., and Siqueira, I. (1998). Neural networks for cost estimating of structural steel buildings.. Proc., AACE International Transactions, IT/IM.06, American Association of Cost Engineers (AACE) International, Morgantown, WV.
-
(1998)
Proc., AACE International Transactions, IT/IM.06
-
-
Moselhi, O.1
Siqueira, I.2
-
21
-
-
77956910571
-
Road tunnel early cost estimates using multiple regression analysis
-
1745-7645, , 10.1007/BF02941259
-
Petroutsatou, K., Lambropoulos, S., and Pantouvakis, J. P. (2006). Road tunnel early cost estimates using multiple regression analysis.. Oper. Res. Int. J. 1745-7645, 6 (3), 311-322. 10.1007/BF02941259
-
(2006)
Oper. Res. Int. J.
, vol.6
, Issue.3
, pp. 311-322
-
-
Petroutsatou, K.1
Lambropoulos, S.2
Pantouvakis, J.P.3
-
22
-
-
77955675028
-
Forecasting final budget and duration of highway construction projects
-
0969-9988, , 10.1108/09699980911002566
-
Pewdum, W., Rujirayanyong, T., and Sooksatra, V. (2009). Forecasting final budget and duration of highway construction projects.. Eng. Constr. Archit. Manage. 0969-9988, 16 (6), 544-557. 10.1108/09699980911002566
-
(2009)
Eng. Constr. Archit. Manage.
, vol.16
, Issue.6
, pp. 544-557
-
-
Pewdum, W.1
Rujirayanyong, T.2
Sooksatra, V.3
-
23
-
-
0000646059
-
Learning internal representation by error propagation
-
MIT Press, Cambridge, MA
-
Rumelhart, D., Hinton, G., and Williams, R. (1986). Learning internal representation by error propagation.. Parallel distributed processing: Explorations in the microstructure of cognition, Vol. 1, MIT Press, Cambridge, MA.
-
(1986)
Parallel Distributed Processing: Explorations in the Microstructure of Cognition
, vol.1
-
-
Rumelhart, D.1
Hinton, G.2
Williams, R.3
-
24
-
-
0001686519
-
Displacement measurements associated with the design of underground openings
-
A.A. Balkema, Rotterdam, Netherlands
-
Sakurai, S. (1983). Displacement measurements associated with the design of underground openings.. Proc., Int. Symp. Field Measurements in Geomechanics, Vol. 2, A.A. Balkema, Rotterdam, Netherlands, 1163-1178.
-
(1983)
Proc., Int. Symp. Field Measurements in Geomechanics
, vol.2
, pp. 1163-1178
-
-
Sakurai, S.1
-
25
-
-
0036352330
-
Neural networks for cost estimation
-
American Association of Cost Engineers (AACE) International, Morgantown, WV
-
Setyawati, B. R., Sahirman, S., and Creese, R. C. (2002). Neural networks for cost estimation.. Proc., 2002 AACE International Transactions, EST.13, American Association of Cost Engineers (AACE) International, Morgantown, WV.
-
(2002)
Proc., 2002 AACE International Transactions, EST.13
-
-
Setyawati, B.R.1
Sahirman, S.2
Creese, R.C.3
-
26
-
-
0031899466
-
Tunnel construction costs for tube transportation systems
-
0733-9364, , 10.1061/(ASCE)0733-9364(1998)124:1(48)
-
Sinfield, J. V., and Einstein, H. H. (1998). Tunnel construction costs for tube transportation systems.. J. Constr. Eng. Manage. 0733-9364, 124 (1), 48-57. 10.1061/(ASCE)0733-9364(1998)124:1(48)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 48-57
-
-
Sinfield, J.V.1
Einstein, H.H.2
-
28
-
-
84862154501
-
Neural network based decision support for estimating cost of highway bridges-A Hong Kong study
-
Royal Institution of Chartered Surveyors (RICS), London
-
Ughu, O. O., and Kumaraswamy, M. M. (2004). Neural network based decision support for estimating cost of highway bridges-A Hong Kong study.. Proc., Int. Construction Research Conf. of the Royal Institution of Chartered Surveyors, Royal Institution of Chartered Surveyors (RICS), London.
-
(2004)
Proc., Int. Construction Research Conf. of the Royal Institution of Chartered Surveyors
-
-
Ughu, O.O.1
Kumaraswamy, M.M.2
-
29
-
-
0034634798
-
Process cost modelling using neural networks
-
0020-7543, , 10.1080/00207540050176021
-
Wang, Q., Stockton, D. J., and Baguley, P. (2000). Process cost modelling using neural networks.. Int. J. Prod. Res. 0020-7543, 38 (16), 3811-3821. 10.1080/00207540050176021
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.16
, pp. 3811-3821
-
-
Wang, Q.1
Stockton, D.J.2
Baguley, P.3
-
30
-
-
0036540409
-
Predicting completed project cost using bidding data
-
0144-6193, , 10.1080/01446190110112838
-
Williams, T. P. (2002). Predicting completed project cost using bidding data.. Constr. Manage. Econ. 0144-6193, 20 (3), 225-235. 10.1080/ 01446190110112838
-
(2002)
Constr. Manage. Econ.
, vol.20
, Issue.3
, pp. 225-235
-
-
Williams, T.P.1
-
31
-
-
13844297452
-
Bidding ratios to predict highway project costs
-
0969-9988, , 10.1108/09699980510576880
-
Williams, T. P. (2005). Bidding ratios to predict highway project costs.. Eng. Constr. Archit. Manage. 0969-9988, 12 (1), 38-51. 10.1108/ 09699980510576880
-
(2005)
Eng. Constr. Archit. Manage.
, vol.12
, Issue.1
, pp. 38-51
-
-
Williams, T.P.1
|