메뉴 건너뛰기




Volumn 138, Issue 6, 2012, Pages 679-687

Early cost estimating of road tunnel construction using neural networks

Author keywords

Construction costs; Estimation; Neural networks; Tunnel construction

Indexed keywords

BASIC PARAMETERS; CONSTRUCTION COSTS; COST ESTIMATE; COST ESTIMATION SYSTEM; COST ESTIMATIONS; DESIGN DECISIONS; GENERAL REGRESSION NEURAL NETWORK; MULTI-LAYER FEED-FORWARD NETWORKS; NORTHERN GREECE; REAL WORLD DATA; ROAD TUNNEL; TOTAL LENGTH; TUNNEL CONSTRUCTION;

EID: 84862152230     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000479     Document Type: Article
Times cited : (92)

References (31)
  • 1
    • 0010131508 scopus 로고    scopus 로고
    • Forecasting economic magnitudes with neural network models
    • 1083-0898, , 10.1007/BF02295547
    • Alonso-Rodriquez, A. (1999). Forecasting economic magnitudes with neural network models.. Int. Adv. Econ. Res. 1083-0898, 5 (4), 496-511. 10.1007/BF02295547
    • (1999) Int. Adv. Econ. Res. , vol.5 , Issue.4 , pp. 496-511
    • Alonso-Rodriquez, A.1
  • 2
    • 0033100590 scopus 로고    scopus 로고
    • Preliminary cost estimation of highway construction using neural networks
    • 0013-8010
    • Al-Tabtabai, H., Alex, P. A., and Tantash, M. (1999). Preliminary cost estimation of highway construction using neural networks.. Cost Eng. J. 0013-8010, 41 (3), 19-24.
    • (1999) Cost Eng. J. , vol.41 , Issue.3 , pp. 19-24
    • Al-Tabtabai, H.1    Alex, P.A.2    Tantash, M.3
  • 6
    • 0031700588 scopus 로고    scopus 로고
    • Neural networks for cost estimation
    • 0274-9696
    • Bode, J. (1998). Neural networks for cost estimation.. Cost Eng. 0274-9696, 40 (1), 25-30.
    • (1998) Cost Eng. , vol.40 , Issue.1 , pp. 25-30
    • Bode, J.1
  • 8
    • 0002231440 scopus 로고
    • Cost estimation of timber bridges using neural networks
    • 0274-9696
    • Creese, R. C., and Li, L. (1995). Cost estimation of timber bridges using neural networks.. Cost Eng., 37 (5), 17-22. 0274-9696
    • (1995) Cost Eng. , vol.37 , Issue.5 , pp. 17-22
    • Creese, R.C.1    Li, L.2
  • 9
    • 0036744325 scopus 로고    scopus 로고
    • Data modelling and the application of a neural network approach to the prediction of total construction cost
    • 0144-6193, , 10.1080/01446190210151050
    • Emsley, M. W., Lowe, D. J., Roy, Duff A., Harding, A., and Hickson, A. (2002). Data modelling and the application of a neural network approach to the prediction of total construction cost.. Constr. Manage. Econ. 0144-6193, 20 (6), 465-472. 10.1080/01446190210151050
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.W.1    Lowe, D.J.2    Roy, D.A.3    Harding, A.4    Hickson, A.5
  • 10
    • 0028416331 scopus 로고
    • Neural networks in civil engineering. I: Principles and understanding
    • 0887-3801, , 10.1061/(ASCE)0887-3801(1994)8:2(131)
    • Flood, I., and Kartam, N. (1994). Neural networks in civil engineering. I: Principles and understanding.. J. Comput. Civ. Eng. 0887-3801, 8 (2), 131-162. 10.1061/(ASCE)0887-3801(1994)8:2(131)
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.2 , pp. 131-162
    • Flood, I.1    Kartam, N.2
  • 11
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1998)124:3(210)
    • Hegazy, T., and Ayed, A. (1998). Neural network model for parametric cost estimation of highway projects.. J. Constr. Eng. Manage. 0733-9364, 124 (3), 210-218. 10.1061/(ASCE)0733-9364(1998)124:3(210)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 12
    • 0028320021 scopus 로고
    • Developing practical neural network applications using back-propagation
    • 10.1111/j.1467-8667.1994.tb00369.x
    • Hegazy, T., Fazio, P., and Moselhi, O. (1994). Developing practical neural network applications using back-propagation.. Microcomput. Civ. Eng., 9 (2), 145-159. 10.1111/j.1467-8667.1994.tb00369.x
    • (1994) Microcomput. Civ. Eng. , vol.9 , Issue.2 , pp. 145-159
    • Hegazy, T.1    Fazio, P.2    Moselhi, O.3
  • 13
    • 0028330587 scopus 로고
    • Analogy-based solution to mark-up estimation problem
    • 0887-3801, , 10.1061/(ASCE)0887-3801(1994)8:1(72)
    • Hegazy, T., and Moselhi, O. (1994). Analogy-based solution to mark-up estimation problem.. J. Comput. Civ. Eng. 0887-3801, 8 (1), 72-87. 10.1061/(ASCE)0887-3801(1994)8:1(72)
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.1 , pp. 72-87
    • Hegazy, T.1    Moselhi, O.2
  • 14
    • 0001368592 scopus 로고    scopus 로고
    • Applicability of the geological strength index (GSI) in the classification of very weak and sheered rock masses
    • 1435-9529, 10.1007/s100640050031
    • Hoek, E., Marinos, P., and Benissi, M. (1998). Applicability of the geological strength index (GSI) in the classification of very weak and sheered rock masses.. Bull. Eng. Geol. Environ. 1435-9529, 57, 151-160. 10.1007/s100640050031
    • (1998) Bull. Eng. Geol. Environ. , vol.57 , pp. 151-160
    • Hoek, E.1    Marinos, P.2    Benissi, M.3
  • 15
    • 18144382336 scopus 로고    scopus 로고
    • Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
    • 0887-3801, , 10.1061/(ASCE)0887-3801(2005)19:2(208)
    • Kim, G. H., Seo, D. S., and Kang, K. I. (2005). Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates.. J. Comput. Civ. Eng. 0887-3801, 19 (2), 208-211. 10.1061/(ASCE)0887-3801(2005)19: 2(208)
    • (2005) J. Comput. Civ. Eng. , vol.19 , Issue.2 , pp. 208-211
    • Kim, G.H.1    Seo, D.S.2    Kang, K.I.3
  • 16
    • 84862132739 scopus 로고    scopus 로고
    • Cost, time and quality in Egnatia motorway
    • Institute of Management and Development of Technical Works (IDATE), Athens, Greece
    • Maravas, A., and Konstantinidis, D. (2003). Cost, time and quality in Egnatia motorway.. Proc., One-Day Symp. in Athens, Institute of Management and Development of Technical Works (IDATE), Athens, Greece.
    • (2003) Proc., One-Day Symp. in Athens
    • Maravas, A.1    Konstantinidis, D.2
  • 17
    • 84862134037 scopus 로고    scopus 로고
    • An artificial neural network for the pre-estimation of construction costs for electrical and mechanical installations on road tunnels
    • Division of Construction Management and Engineering, Dept. of Civil Engineering, Middle East Technical Univ., Ankara, Turkey
    • Maravas, A., Pantouvakis, J. P., and Kaltsas, D. (2009). An artificial neural network for the pre-estimation of construction costs for electrical and mechanical installations on road tunnels.. Proc., 5th Conf. on Construction in the 21st Century (CITC-V), Collaboration and Integration in Engineering, Management and Technology, Division of Construction Management and Engineering, Dept. of Civil Engineering, Middle East Technical Univ., Ankara, Turkey, 33-40.
    • (2009) Proc., 5th Conf. on Construction in the 21st Century (CITC-V), Collaboration and Integration in Engineering, Management and Technology , pp. 33-40
    • Maravas, A.1    Pantouvakis, J.P.2    Kaltsas, D.3
  • 18
    • 0034753123 scopus 로고    scopus 로고
    • Estimating the geotechnical properties of heterogeneous rock masses such as flysch
    • 1435-9529, 10.1007/s100640000090
    • Marinos, P., and Hoek, E. (2001). Estimating the geotechnical properties of heterogeneous rock masses such as flysch.. Bull. Eng. Geol. Environ. 1435-9529, 60, 85-92. 10.1007/s100640000090
    • (2001) Bull. Eng. Geol. Environ. , vol.60 , pp. 85-92
    • Marinos, P.1    Hoek, E.2
  • 20
    • 0031644126 scopus 로고    scopus 로고
    • Neural networks for cost estimating of structural steel buildings
    • American Association of Cost Engineers (AACE) International, Morgantown, WV
    • Moselhi, O., and Siqueira, I. (1998). Neural networks for cost estimating of structural steel buildings.. Proc., AACE International Transactions, IT/IM.06, American Association of Cost Engineers (AACE) International, Morgantown, WV.
    • (1998) Proc., AACE International Transactions, IT/IM.06
    • Moselhi, O.1    Siqueira, I.2
  • 21
    • 77956910571 scopus 로고    scopus 로고
    • Road tunnel early cost estimates using multiple regression analysis
    • 1745-7645, , 10.1007/BF02941259
    • Petroutsatou, K., Lambropoulos, S., and Pantouvakis, J. P. (2006). Road tunnel early cost estimates using multiple regression analysis.. Oper. Res. Int. J. 1745-7645, 6 (3), 311-322. 10.1007/BF02941259
    • (2006) Oper. Res. Int. J. , vol.6 , Issue.3 , pp. 311-322
    • Petroutsatou, K.1    Lambropoulos, S.2    Pantouvakis, J.P.3
  • 22
    • 77955675028 scopus 로고    scopus 로고
    • Forecasting final budget and duration of highway construction projects
    • 0969-9988, , 10.1108/09699980911002566
    • Pewdum, W., Rujirayanyong, T., and Sooksatra, V. (2009). Forecasting final budget and duration of highway construction projects.. Eng. Constr. Archit. Manage. 0969-9988, 16 (6), 544-557. 10.1108/09699980911002566
    • (2009) Eng. Constr. Archit. Manage. , vol.16 , Issue.6 , pp. 544-557
    • Pewdum, W.1    Rujirayanyong, T.2    Sooksatra, V.3
  • 24
    • 0001686519 scopus 로고
    • Displacement measurements associated with the design of underground openings
    • A.A. Balkema, Rotterdam, Netherlands
    • Sakurai, S. (1983). Displacement measurements associated with the design of underground openings.. Proc., Int. Symp. Field Measurements in Geomechanics, Vol. 2, A.A. Balkema, Rotterdam, Netherlands, 1163-1178.
    • (1983) Proc., Int. Symp. Field Measurements in Geomechanics , vol.2 , pp. 1163-1178
    • Sakurai, S.1
  • 26
    • 0031899466 scopus 로고    scopus 로고
    • Tunnel construction costs for tube transportation systems
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1998)124:1(48)
    • Sinfield, J. V., and Einstein, H. H. (1998). Tunnel construction costs for tube transportation systems.. J. Constr. Eng. Manage. 0733-9364, 124 (1), 48-57. 10.1061/(ASCE)0733-9364(1998)124:1(48)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 48-57
    • Sinfield, J.V.1    Einstein, H.H.2
  • 28
  • 29
    • 0034634798 scopus 로고    scopus 로고
    • Process cost modelling using neural networks
    • 0020-7543, , 10.1080/00207540050176021
    • Wang, Q., Stockton, D. J., and Baguley, P. (2000). Process cost modelling using neural networks.. Int. J. Prod. Res. 0020-7543, 38 (16), 3811-3821. 10.1080/00207540050176021
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.16 , pp. 3811-3821
    • Wang, Q.1    Stockton, D.J.2    Baguley, P.3
  • 30
    • 0036540409 scopus 로고    scopus 로고
    • Predicting completed project cost using bidding data
    • 0144-6193, , 10.1080/01446190110112838
    • Williams, T. P. (2002). Predicting completed project cost using bidding data.. Constr. Manage. Econ. 0144-6193, 20 (3), 225-235. 10.1080/ 01446190110112838
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.3 , pp. 225-235
    • Williams, T.P.1
  • 31
    • 13844297452 scopus 로고    scopus 로고
    • Bidding ratios to predict highway project costs
    • 0969-9988, , 10.1108/09699980510576880
    • Williams, T. P. (2005). Bidding ratios to predict highway project costs.. Eng. Constr. Archit. Manage. 0969-9988, 12 (1), 38-51. 10.1108/ 09699980510576880
    • (2005) Eng. Constr. Archit. Manage. , vol.12 , Issue.1 , pp. 38-51
    • Williams, T.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.