Volumn 126, Issue , 2014, Pages 116-125

On the application of near accident data to risk analysis of major accidents

Author keywords

Hierarchical Bayesian analysis; Major accident; Multinomial distribution; Offshore blowout; Precursor data; Probabilistic risk analysis

Indexed keywords

BLOWOUTS; PROBABILITY DISTRIBUTIONS;

EID: 84894279786     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2014.01.015     Document Type: Article
Times cited : (125)

References (51)
  • 1
    • 0029483016 scopus 로고
    • The performance of precursor-based estimators for rare event frequencies
    • V.M. Bier, and W. Yi The performance of precursor-based estimators for rare event frequencies Reliab Eng Syst Saf 50 1995 241 251
    • (1995) Reliab Eng Syst Saf , vol.50 , pp. 241-251
    • Bier, V.M.1    Yi, W.2
  • 2
    • 33846265021 scopus 로고    scopus 로고
    • Estimating rate of occurrence of rare events with empirical bayes: A railway application
    • DOI 10.1016/j.ress.2006.02.007, PII S0951832006000676, Recent Adances in Theory and Applications of Stochastic Point Process Models in Reliability Engineering
    • J. Quigley, T. Bedford, and L. Walls Estimating rate of occurrence of rare events with empirical Bayes: a railway application Reliab Eng Syst Saf 92 2007 619 627 (Pubitemid 46108534)
    • (2007) Reliability Engineering and System Safety , vol.92 , Issue.5 , pp. 619-627
    • Quigley, J.1    Bedford, T.2    Walls, L.3
  • 3
    • 0031171062 scopus 로고    scopus 로고
    • Estimation from zero-failure data
    • DOI 10.1111/j.1539-6924.1997.tb00876.x
    • R.T. Bailey Estimation from zero-failure data Risk Anal 17 1997 375 380 (Pubitemid 27311274)
    • (1997) Risk Analysis , vol.17 , Issue.3 , pp. 375-380
    • Bailey, R.T.1
  • 4
    • 79959617431 scopus 로고    scopus 로고
    • Estimating the probability of rare events: Addressing zero failure data
    • J. Quigley, and M. Revie Estimating the probability of rare events: addressing zero failure data Risk Anal 31 2011 1120 1132
    • (2011) Risk Anal , vol.31 , pp. 1120-1132
    • Quigley, J.1    Revie, M.2
  • 5
    • 0031171434 scopus 로고    scopus 로고
    • Applications of some risk assessment techniques: Formal expert judgement and accident sequence precursors
    • DOI 10.1016/S0925-7535(97)00027-1, PII S0925753597000271
    • L.H.J. Goossens, and R.M. Cooke Applications of some risk assessment techniques: formal expert judgement and accident sequence precursors Saf Sci 26 1997 35 47 (Pubitemid 27286236)
    • (1997) Safety Science , vol.26 , Issue.1-2 , pp. 35-47
    • Goossens, L.H.J.1    Cooke, R.M.2
  • 6
    • 0032295954 scopus 로고    scopus 로고
    • An application of copulas to accident precursor analysis
    • W. Yi, and V.M. Bier An application of copulas to accident precursor analysis Manag Sci 44 1998 257 270
    • (1998) Manag Sci , vol.44 , pp. 257-270
    • Yi, W.1    Bier, V.M.2
  • 7
    • 76049098281 scopus 로고    scopus 로고
    • The limits of forecasting methods in anticipating rare events
    • P. Goodwin, and G. Wright The limits of forecasting methods in anticipating rare events Technol Forecast Soc Change 77 2010 355 368
    • (2010) Technol Forecast Soc Change , vol.77 , pp. 355-368
    • Goodwin, P.1    Wright, G.2
  • 8
    • 0032909908 scopus 로고    scopus 로고
    • A survey of approaches for assessing and managing the risk of extremes
    • DOI 10.1023/A:1006958311241
    • V.M. Bier, Y.Y. Haimes, J.H. Lambert, N.C. Matalas, and R. Zimmerman A survey of approaches for assessing and managing the risk of extremes Risk Anal 19 1 1999 83 94 (Pubitemid 29236987)
    • (1999) Risk Analysis , vol.19 , Issue.1 , pp. 83-94
    • Bier, V.M.1    Haimes, Y.Y.2    Lambert, J.H.3    Matalas, N.C.4    Zimmerman, R.5
  • 9
    • 0030206433 scopus 로고    scopus 로고
    • The US NRC's accident sequence precursor program: An overview and development of a Bayesian approach to estimate core damage frequency using precursor information
    • DOI 10.1016/0951-8320(96)00064-6, PII S0951832096000646
    • J.W. Johnson, and D.M. Rasmuson The US NRC's accident sequence precursor program: an overview and development of a Bayesian approach to estimate core damage frequency using precursor information Reliab Eng Syst Saf 53 1996 205 216 (Pubitemid 126359237)
    • (1996) Reliability Engineering and System Safety , vol.53 , Issue.2 , pp. 205-216
    • Johnson, J.W.1    Rasmuson, D.M.2
  • 10
    • 0031131613 scopus 로고    scopus 로고
    • Impact of accident precursors on risk estimates from accident databases
    • DOI 10.1016/S0950-4230(96)00047-2, PII S0950423096000472
    • C. Kirchsteiger Impact of accident precursors on risk estimates from accident databases Loss Prev Process Ind 10 1997 159 167 (Pubitemid 28115797)
    • (1997) Journal of Loss Prevention in the Process Industries , vol.10 , Issue.3 , pp. 159-167
    • Kirchsteiger, C.1
  • 11
    • 0037976903 scopus 로고    scopus 로고
    • Near-miss incident management in the chemical process industry
    • DOI 10.1111/1539-6924.00326
    • J.R. Phimister, U. Oktem, P.R. Kleindorfer, and H. Kunreuther Near-miss incident management in the chemical process industry Risk Anal 23 2003 445 459 (Pubitemid 36693478)
    • (2003) Risk Analysis , vol.23 , Issue.3 , pp. 445-459
    • Phimister, J.R.1    Oktem, U.2    Kleindorfer, P.R.3    Kunreuther, H.4
  • 12
    • 61849175438 scopus 로고    scopus 로고
    • How near-misses influence decision making under risk: A missed opportunity for learning
    • R.L. Dillon, and C.H. Tinsley How near-misses influence decision making under risk: a missed opportunity for learning Manag Sci 54 8 2008 1425 1440
    • (2008) Manag Sci , vol.54 , Issue.8 , pp. 1425-1440
    • Dillon, R.L.1    Tinsley, C.H.2
  • 13
    • 84872415471 scopus 로고    scopus 로고
    • Bayesian data analysis of severe fatal accident risk in the oil chain
    • P. Eckle, and P. Burgherr Bayesian data analysis of severe fatal accident risk in the oil chain Risk Analysis 33 1 2013 146 160
    • (2013) Risk Analysis , vol.33 , Issue.1 , pp. 146-160
    • Eckle, P.1    Burgherr, P.2
  • 14
    • 84857205657 scopus 로고    scopus 로고
    • Combining precursor incidents investigations and QRA in oil and gas industry
    • J.E. Skogdalen, and J.E. Vinnem Combining precursor incidents investigations and QRA in oil and gas industry Reliab Eng Syst Saf 101 2012 48 58
    • (2012) Reliab Eng Syst Saf , vol.101 , pp. 48-58
    • Skogdalen, J.E.1    Vinnem, J.E.2
  • 15
    • 0025237927 scopus 로고
    • Analysis of accident precursors and near misses. Implications for risk assessment and risk management
    • DOI 10.1016/0951-8320(90)90033-J
    • V.M. Bier, and A. Mosleh The analysis of accident precursors and near misses: implications for risk assessment and risk management Reliab Eng Syst Saf 27 1990 91 101 (Pubitemid 20636167)
    • (1990) Reliability Engineering and System Safety , vol.27 , Issue.1 , pp. 91-101
    • Bier Vicki, M.1    Mosleh Ali2
  • 16
    • 0025263085 scopus 로고
    • The Accident Sequence Precursor methodology for the European Post-Seveso era
    • R.M. Cooke, and L.H.J. Goossens The Accident Sequence Precursor methodology for the European Post-Seveso era Reliab Eng Syst Saf 27 1990 117 130
    • (1990) Reliab Eng Syst Saf , vol.27 , pp. 117-130
    • Cooke, R.M.1    Goossens, L.H.J.2
  • 17
    • 0028729395 scopus 로고
    • On the concept of perfect aggregation in Bayesian estimation
    • V.M. Bier On the concept of perfect aggregation in Bayesian estimation Reliab Eng Syst Saf 46 1994 271 281
    • (1994) Reliab Eng Syst Saf , vol.46 , pp. 271-281
    • Bier, V.M.1
  • 18
    • 79958180631 scopus 로고    scopus 로고
    • Developing safety indicators for preventing offshore oil and gas deepwater drilling blowouts
    • J.E. Skogdalen, I.B. Utne, and J.E. Vinnem Developing safety indicators for preventing offshore oil and gas deepwater drilling blowouts Saf Sci 49 2011 1187 1199
    • (2011) Saf Sci , vol.49 , pp. 1187-1199
    • Skogdalen, J.E.1    Utne, I.B.2    Vinnem, J.E.3
  • 19
    • 84894279861 scopus 로고    scopus 로고
    • BSEE (Bureau of Safety and Environmental Enforcement, U.S) [accessed 01.25.13]
    • BSEE (Bureau of Safety and Environmental Enforcement, U.S). Incident Statistics and Summaries 1996-2012 ytd. Available at: a http://www.bsee.gov/ Inspection-and-Enforcement/Accidents-and-Incidents/Listing-and-Status-of- Accident-Investigations.aspxa [accessed 01.25.13].
    • Incident Statistics and Summaries 1996-2012 Ytd
  • 21
    • 84894254312 scopus 로고
    • WOAD (Worldwide Offshore Accident Databank) Norway
    • WOAD (Worldwide Offshore Accident Databank). Statistical report. DNV Technica, Norway; 1994.
    • (1994) Statistical Report. DNV Technica
  • 25
    • 0019597159 scopus 로고
    • Data analysis in risk assessment
    • G. Apostolakis Data analysis in risk assessment Nucl Eng Des 71 1982 375 381
    • (1982) Nucl Eng des , vol.71 , pp. 375-381
    • Apostolakis, G.1
  • 26
    • 0032184538 scopus 로고    scopus 로고
    • Bayesian parameter estimation in probabilistic risk assessment
    • PII S0951832097001592
    • N.O. Siu, and D.L. Kelly Bayesian parameter estimation in probabilistic risk assessment Reliab Eng Syst Saf 62 1998 89 116 (Pubitemid 128374591)
    • (1998) Reliability Engineering and System Safety , vol.62 , Issue.1-2 , pp. 89-116
    • Siu, N.O.1    Kelly, D.L.2
  • 28
    • 0020496785 scopus 로고
    • On a 'two-stage' Bayesian procedure for determining failure rates
    • (PAS-102)
    • S. Kaplan On a 'two-stage' Bayesian procedure for determining failure rates IEEE Trans Power Appar Syst 1983 195 262 (PAS-102)
    • (1983) IEEE Trans Power Appar Syst , pp. 195-262
    • Kaplan, S.1
  • 29
    • 35448980232 scopus 로고    scopus 로고
    • Decision making during nuclear power plant incidents - A new approach to the evaluation of precursor events
    • DOI 10.1111/j.1539-6924.2007.00941.x
    • C.L. Smith, and E. Borgonovo Decision making during nuclear power plant incidents - a new approach to the evaluation of precursor events Risk Anal 27 2007 1027 1042 (Pubitemid 47631887)
    • (2007) Risk Analysis , vol.27 , Issue.4 , pp. 1027-1042
    • Smith, C.L.1    Borgonovo, E.2
  • 30
    • 77950949510 scopus 로고    scopus 로고
    • Cross-classified hierarchical Bayesian models for risk-based analysis of complex systems under sparse data
    • Z. Yan, and Y.Y. Haimes Cross-classified hierarchical Bayesian models for risk-based analysis of complex systems under sparse data Reliab Eng Syst Saf 95 2010 764 776
    • (2010) Reliab Eng Syst Saf , vol.95 , pp. 764-776
    • Yan, Z.1    Haimes, Y.Y.2
  • 31
    • 33748761173 scopus 로고    scopus 로고
    • Plant-specific dynamic failure assessment using Bayesian theory
    • DOI 10.1016/j.ces.2006.07.007, PII S0009250906004209
    • A. Meel, and W.D. Seider Plant-specific dynamic failure assessment using Bayesian theory Chem Eng Sci 61 2006 7036 7056 (Pubitemid 44415748)
    • (2006) Chemical Engineering Science , vol.61 , Issue.21 , pp. 7036-7056
    • Meel, A.1    Seider, W.D.2
  • 32
    • 84860700471 scopus 로고    scopus 로고
    • Dynamic risk analysis using bow-tie approach
    • N. Khakzad, F. Khan, and P. Amyotte Dynamic risk analysis using bow-tie approach Reliab Eng Syst Saf 104 2012 36 44
    • (2012) Reliab Eng Syst Saf , vol.104 , pp. 36-44
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 33
    • 84871439873 scopus 로고    scopus 로고
    • Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network
    • N. Khakzad, F. Khan, and P. Amyotte Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network Process Saf Environ Prot 91 2013 46 53
    • (2013) Process Saf Environ Prot , vol.91 , pp. 46-53
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 34
    • 77955849605 scopus 로고    scopus 로고
    • Analysis of root causes of major hazard precursors (hydrocarbon leaks) in the Norwegian offshore petroleum industry
    • J.E. Vinnem, J.A. Hestad, J.T. Kvaløy, and J.E. Skogdalen Analysis of root causes of major hazard precursors (hydrocarbon leaks) in the Norwegian offshore petroleum industry Reliab Eng Syst Saf 95 2010 1142 1153
    • (2010) Reliab Eng Syst Saf , vol.95 , pp. 1142-1153
    • Vinnem, J.E.1    Hestad, J.A.2    Kvaløy, J.T.3    Skogdalen, J.E.4
  • 35
    • 84855878176 scopus 로고    scopus 로고
    • Quantitative risk analysis of oil and gas drilling using Deepwater Horizon as case study
    • J.E. Skogdalen, and J.E. Vinnem Quantitative risk analysis of oil and gas drilling using Deepwater Horizon as case study Reliab Eng Syst Saf 100 2012 58 66
    • (2012) Reliab Eng Syst Saf , vol.100 , pp. 58-66
    • Skogdalen, J.E.1    Vinnem, J.E.2
  • 36
    • 84874548097 scopus 로고    scopus 로고
    • Quantitative risk analysis of offshore drilling operation: A Bayesian approach
    • N. Khakzad, F. Khan, and P. Amyotte Quantitative risk analysis of offshore drilling operation: a Bayesian approach Saf Sci 57 2013 108 117
    • (2013) Saf Sci , vol.57 , pp. 108-117
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 37
    • 0032656018 scopus 로고    scopus 로고
    • Correlations and copulas for decision and risk analysis
    • R.T. Clemen, and T. Reilly Correlations and copulas for decision and risk analysis Manag Sci 45 2 1999 208 224
    • (1999) Manag Sci , vol.45 , Issue.2 , pp. 208-224
    • Clemen, R.T.1    Reilly, T.2
  • 38
    • 0006407254 scopus 로고    scopus 로고
    • WinBUGS - A Bayesian modelling framework: Concepts, structure, and extensibility
    • D.J. Lunn, A. Thomas, N. Best, and D. Spiegelhalter WinBUGS - a Bayesian modelling framework: concepts, structure, and extensibility Statist Comput 10 2000 325 337
    • (2000) Statist Comput , vol.10 , pp. 325-337
    • Lunn, D.J.1    Thomas, A.2    Best, N.3    Spiegelhalter, D.4
  • 39
    • 70449411807 scopus 로고    scopus 로고
    • The BUGS project: Evaluation, critique and future directions (with discussion)
    • D.J. Lunn, D. Spiegelhalter, A. Thomas, and N. Best The BUGS project: evaluation, critique and future directions (with discussion) Stat Med 28 2009 3049 3082
    • (2009) Stat Med , vol.28 , pp. 3049-3082
    • Lunn, D.J.1    Spiegelhalter, D.2    Thomas, A.3    Best, N.4
  • 40
    • 84894257977 scopus 로고    scopus 로고
    • OpenBUGS [accessed 10.10.12]
    • OpenBUGS. Available at: 〈http//www.OpenBUGS.infoa [accessed 10.10.12].
  • 43
    • 54049122569 scopus 로고    scopus 로고
    • Bayesian inference in probabilistic risk assessment - The current state of the art
    • D.L. Kelly, and C.L. Smith Bayesian inference in probabilistic risk assessment - the current state of the art Reliab Eng Syst Saf 94 2009 628 643
    • (2009) Reliab Eng Syst Saf , vol.94 , pp. 628-643
    • Kelly, D.L.1    Smith, C.L.2
  • 44
    • 77149150907 scopus 로고    scopus 로고
    • Practical approach to dependence modeling using copulas
    • A Dutfoy, and R. Lebrun Practical approach to dependence modeling using copulas Proc Inst Mech Eng O: J Risk Reliab 223 2009 347 361
    • (2009) Proc Inst Mech Eng O: J Risk Reliab , vol.223 , pp. 347-361
    • Dutfoy, A.1    Lebrun, R.2
  • 45
    • 84859591277 scopus 로고    scopus 로고
    • A copulas-based approach to modeling dependence in decision trees
    • T. Wang, and J.S. Dyer A copulas-based approach to modeling dependence in decision trees Oper Res 60 1 2012 225 242
    • (2012) Oper Res , vol.60 , Issue.1 , pp. 225-242
    • Wang, T.1    Dyer, J.S.2
  • 46
    • 0037405514 scopus 로고    scopus 로고
    • A bivariate beta distribution
    • DOI 10.1016/S0167-7152(03)00048-8, PII S0167715203000488
    • I. Olkin, and R. Liu A bivariate beta distribution Stat Probab Lett 62 2003 407 412 (Pubitemid 36439419)
    • (2003) Statistics and Probability Letters , vol.62 , Issue.4 , pp. 407-412
    • Olkin, I.1    Liu, R.2
  • 48
    • 0043266562 scopus 로고    scopus 로고
    • Stochastic modeling for the analysis of blowout risk in exploration drilling
    • L.B. Andersen Stochastic modeling for the analysis of blowout risk in exploration drilling Reliab Eng Syst Saf 61 1998 53 63
    • (1998) Reliab Eng Syst Saf , vol.61 , pp. 53-63
    • Andersen, L.B.1
  • 50
    • 1942508461 scopus 로고
    • Estimating the exponential failure rate from data with no failure event
    • Los Angeles, CA
    • Welker EL, Lipow M. Estimating the exponential failure rate from data with no failure event. In: Proceedings of the annual reliability and maintainability symposium. Los Angeles, CA. vol. 7, issue no. 2; 1974. p. 420-427.
    • (1974) Proceedings of the Annual Reliability and Maintainability Symposium , vol.7 , Issue.2 , pp. 420-427
    • Welker, E.L.1    Lipow, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.