메뉴 건너뛰기




Volumn 32, Issue 3, 2014, Pages 492-507

A performance evaluation framework of development projects: An empirical study of Constituency Development Fund (CDF) construction projects in Kenya

Author keywords

Constituency Development Fund; Development projects; Kenya; Key performance indicators; Performance evaluation framework

Indexed keywords

BENCHMARKING; DEVELOPING COUNTRIES; FACTOR ANALYSIS;

EID: 84894250771     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2013.07.005     Document Type: Article
Times cited : (86)

References (63)
  • 2
    • 84860437372 scopus 로고    scopus 로고
    • (Unpublished Masters Dissertations), Universiti Teknologi, Malaysia, Skudai
    • Abidin A. The Profile of Construction Disputes 2007, (Unpublished Masters Dissertations), Universiti Teknologi, Malaysia, Skudai.
    • (2007) The Profile of Construction Disputes
    • Abidin, A.1
  • 4
    • 76849099276 scopus 로고    scopus 로고
    • The performance measurement of construction projects managed by ISO-certified contractors in Malaysia
    • Ali A.S., Rahmat I. The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. Journal of Retail and Leisure Property 2010, 9:25-35.
    • (2010) Journal of Retail and Leisure Property , vol.9 , pp. 25-35
    • Ali, A.S.1    Rahmat, I.2
  • 5
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria. International Journal of Project Management 1999, 17:337-342.
    • (1999) International Journal of Project Management , vol.17 , pp. 337-342
    • Atkinson, R.1
  • 6
    • 74849112033 scopus 로고    scopus 로고
    • Project performance development framework: an approach for developing performance criteria & measures for information systems (IS) projects
    • Barclay C., Osei-Bryson K.M. Project performance development framework: an approach for developing performance criteria & measures for information systems (IS) projects. International Journal of Production Economics 2010, 124:272-292.
    • (2010) International Journal of Production Economics , vol.124 , pp. 272-292
    • Barclay, C.1    Osei-Bryson, K.M.2
  • 12
    • 78650829513 scopus 로고    scopus 로고
    • A case study approach for developing a project performance evaluation system
    • Cao Q., Hoffman J.J. A case study approach for developing a project performance evaluation system. International Journal of Project Management 2011, 29:155-164.
    • (2011) International Journal of Project Management , vol.29 , pp. 155-164
    • Cao, Q.1    Hoffman, J.J.2
  • 13
  • 15
    • 76549129795 scopus 로고    scopus 로고
    • Sustainable performance criteria for construction method selection in concrete buildings
    • Chen Y., Okudan G.E., Riley D.R. Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction 2010, 19(2):235-244.
    • (2010) Automation in Construction , vol.19 , Issue.2 , pp. 235-244
    • Chen, Y.1    Okudan, G.E.2    Riley, D.R.3
  • 16
    • 84868211653 scopus 로고    scopus 로고
    • The OECD/DAC criteria for international development evaluations: an assessment and ideas for improvement
    • Chianca T. The OECD/DAC criteria for international development evaluations: an assessment and ideas for improvement. Journal of Multi-Disciplinary Evaluation 2008, 5(9):41-51.
    • (2008) Journal of Multi-Disciplinary Evaluation , vol.5 , Issue.9 , pp. 41-51
    • Chianca, T.1
  • 17
    • 84894233615 scopus 로고    scopus 로고
    • Constituency Development Fund Act, Accessed 23/11/2011 and 14/07/2012
    • Constituency Development Fund Act Accessed 23/11/2011 and 14/07/2012. http://www.cdf.go.ke/images/docs/revised%20cdf%20act%20_annotatedversion.pdf.
  • 20
    • 78650810970 scopus 로고    scopus 로고
    • Effects of cooperative procurement procedures on construction project performance: a conceptual framework
    • Eriksson P.E., Westerberg M. Effects of cooperative procurement procedures on construction project performance: a conceptual framework. International Journal of Project Management 2011, 29(2):197-208.
    • (2011) International Journal of Project Management , vol.29 , Issue.2 , pp. 197-208
    • Eriksson, P.E.1    Westerberg, M.2
  • 22
    • 56349086441 scopus 로고    scopus 로고
    • A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings
    • Gangolells M., Casals M., Gassó S., Forcada N., Roca X., Fuertes A. A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings. Building and Environment 2009, 44(2009):558-571.
    • (2009) Building and Environment , vol.44 , Issue.2009 , pp. 558-571
    • Gangolells, M.1    Casals, M.2    Gassó, S.3    Forcada, N.4    Roca, X.5    Fuertes, A.6
  • 23
    • 0033876271 scopus 로고    scopus 로고
    • Revisiting the golden triangle of cost, time, and quality: the role of NPV in project control, success, and failure
    • Gardiner K.S. Revisiting the golden triangle of cost, time, and quality: the role of NPV in project control, success, and failure. International Journal of Project Management 2000, 18(4):251-256.
    • (2000) International Journal of Project Management , vol.18 , Issue.4 , pp. 251-256
    • Gardiner, K.S.1
  • 28
    • 85015417110 scopus 로고    scopus 로고
    • The link between financial performance and the voluntary departure of personnel through a measurement scale
    • Jahmane A., Van Hoorebeke D., Louart P. The link between financial performance and the voluntary departure of personnel through a measurement scale. Business and Management Review 2011, 1(6):48-61.
    • (2011) Business and Management Review , vol.1 , Issue.6 , pp. 48-61
    • Jahmane, A.1    Van Hoorebeke, D.2    Louart, P.3
  • 30
    • 34047114879 scopus 로고    scopus 로고
    • Relationship-based-determinants of building project performance in China
    • Jin X.H., Doloi H., Gao S.Y. Relationship-based-determinants of building project performance in China. Construction Management and Economics 2007, 25:297-304.
    • (2007) Construction Management and Economics , vol.25 , pp. 297-304
    • Jin, X.H.1    Doloi, H.2    Gao, S.Y.3
  • 31
    • 67349174243 scopus 로고    scopus 로고
    • Cost escalation and schedule delays in road construction projects in Zambia
    • Kaliba C., Muya M., Mumba K. Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management 2009, 27(5):522-531.
    • (2009) International Journal of Project Management , vol.27 , Issue.5 , pp. 522-531
    • Kaliba, C.1    Muya, M.2    Mumba, K.3
  • 32
    • 70450263655 scopus 로고    scopus 로고
    • Analysis of cost and schedule performance of international development projects
    • Kamrul A., Indra G. Analysis of cost and schedule performance of international development projects. International Journal of Project Management 2010, 28(1):68-78.
    • (2010) International Journal of Project Management , vol.28 , Issue.1 , pp. 68-78
    • Kamrul, A.1    Indra, G.2
  • 34
    • 84894226835 scopus 로고    scopus 로고
    • A success measurement model for construction projects
    • IACSIT Press, Singapore, (Accessed 10/08/2012)
    • Khosravi S., Afshari H. A success measurement model for construction projects. International Conference on Financial Management and Economics IPEDR 2011, vol. 11. IACSIT Press, Singapore, (www.ipedr.com/vol.11/36-wooo14.pdf. Accessed 10/08/2012).
    • (2011) International Conference on Financial Management and Economics IPEDR , vol.11
    • Khosravi, S.1    Afshari, H.2
  • 36
    • 16444365584 scopus 로고    scopus 로고
    • Delays and cost increases in construction of private residential projects in Kuwait
    • Koushki P.A., Al-Rashid K., Kartam N. Delays and cost increases in construction of private residential projects in Kuwait. Construction Management and Economics 2005, 23(3):285-294.
    • (2005) Construction Management and Economics , vol.23 , Issue.3 , pp. 285-294
    • Koushki, P.A.1    Al-Rashid, K.2    Kartam, N.3
  • 45
    • 84894246176 scopus 로고    scopus 로고
    • A performance evaluation framework of construction projects: insights from literature
    • (accepted for publication)
    • Ngacho C., Das D. A performance evaluation framework of construction projects: insights from literature. International Journal of Project Organisation and Management 2013, (accepted for publication).
    • (2013) International Journal of Project Organisation and Management
    • Ngacho, C.1    Das, D.2
  • 46
    • 84894245484 scopus 로고    scopus 로고
    • Quality performance: the case of construction projects in the electricity industry in Kenya
    • Ogano N.O., Pretorius L. Quality performance: the case of construction projects in the electricity industry in Kenya. South African Journal of Industrial Engineering 2010, 21(1).
    • (2010) South African Journal of Industrial Engineering , vol.21 , Issue.1
    • Ogano, N.O.1    Pretorius, L.2
  • 47
    • 84894238273 scopus 로고    scopus 로고
    • Systematic prevention of construction failure
    • Ortega I. Systematic prevention of construction failure. Quality Management and Technology 2000, 2000(9):1-13.
    • (2000) Quality Management and Technology , vol.2000 , Issue.9 , pp. 1-13
    • Ortega, I.1
  • 48
    • 70350484242 scopus 로고    scopus 로고
    • Rework in projects: learning from errors
    • (December 2007 ISSN 1816-9554)
    • Palaneeswaran E., Ramanathan M., Tam C. Rework in projects: learning from errors. Surveying and Built Environment 2007, 18(2):47-58. (December 2007 ISSN 1816-9554).
    • (2007) Surveying and Built Environment , vol.18 , Issue.2 , pp. 47-58
    • Palaneeswaran, E.1    Ramanathan, M.2    Tam, C.3
  • 49
    • 84894231690 scopus 로고    scopus 로고
    • Critical success factors of project management for Brunei construction projects: Improving project performance
    • Unpublished PhD thesis, (eprints.qut.edu/au/38883; Accessed April 28, 2011)
    • Salleh D. Critical success factors of project management for Brunei construction projects: Improving project performance. Faculty of Built Environment and Engineering, Queensland University of Technology 2009, Unpublished PhD thesis, (eprints.qut.edu/au/38883; Accessed April 28, 2011).
    • (2009) Faculty of Built Environment and Engineering, Queensland University of Technology
    • Salleh, D.1
  • 50
    • 80053053262 scopus 로고    scopus 로고
    • The development of constructs of program context and program success: a qualitative study
    • Shao J., Müller R. The development of constructs of program context and program success: a qualitative study. International Journal of Project Management 2011, 29(8):947-959.
    • (2011) International Journal of Project Management , vol.29 , Issue.8 , pp. 947-959
    • Shao, J.1    Müller, R.2
  • 51
    • 70649086974 scopus 로고    scopus 로고
    • Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice
    • Shen L., Tam V., Tam L., Ji Y. Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice. Journal of Cleaner Production 2010, 18(3):254-259.
    • (2010) Journal of Cleaner Production , vol.18 , Issue.3 , pp. 254-259
    • Shen, L.1    Tam, V.2    Tam, L.3    Ji, Y.4
  • 52
    • 0036001524 scopus 로고    scopus 로고
    • Refining the search for project success factors: a multivariate typological approach
    • Shenhar A.J., Asher T., Dov D., Stanislav L., Thomas L. Refining the search for project success factors: a multivariate typological approach. R & D Management 2002, 32(2):111-126.
    • (2002) R & D Management , vol.32 , Issue.2 , pp. 111-126
    • Shenhar, A.J.1    Asher, T.2    Dov, D.3    Stanislav, L.4    Thomas, L.5
  • 54
    • 79952433989 scopus 로고    scopus 로고
    • Analysis of irregularities in public procurement in India
    • Tabish S.Z.S., Jha K.N. Analysis of irregularities in public procurement in India. Construction Management and Economics 2011, 29(3):261-274.
    • (2011) Construction Management and Economics , vol.29 , Issue.3 , pp. 261-274
    • Tabish, S.Z.S.1    Jha, K.N.2
  • 55
    • 78651478580 scopus 로고    scopus 로고
    • Sustainable construction practice and contractors' competitiveness: a preliminary study
    • Tan Y., Shen L., Yao H. Sustainable construction practice and contractors' competitiveness: a preliminary study. Habitat international 2011, 35(2):225-230.
    • (2011) Habitat international , vol.35 , Issue.2 , pp. 225-230
    • Tan, Y.1    Shen, L.2    Yao, H.3
  • 56
    • 84887115502 scopus 로고    scopus 로고
    • Successful project leadership: Understanding the personality traits and organizational factors
    • Construction in Developing Economies: New Issues and Challenges, Santiago, Chile
    • Toor S.R., Ogunlana S.O Successful project leadership: Understanding the personality traits and organizational factors. Proceedings of CIB-W107, International Symposium 2006, 225-230. Construction in Developing Economies: New Issues and Challenges, Santiago, Chile.
    • (2006) Proceedings of CIB-W107, International Symposium , pp. 225-230
    • Toor, S.R.1    Ogunlana, S.O.2
  • 57
    • 47549094645 scopus 로고    scopus 로고
    • A model for supply chains environmental performance analysis and decision making
    • Tsoulfas G.T., Pappis C.P. A model for supply chains environmental performance analysis and decision making. Journal of Cleaner Production 2008, 16(15):1647-1657.
    • (2008) Journal of Cleaner Production , vol.16 , Issue.15 , pp. 1647-1657
    • Tsoulfas, G.T.1    Pappis, C.P.2
  • 58
    • 33846634212 scopus 로고    scopus 로고
    • Measuring e-learning systems success in an organisational context: scale development and validation
    • Wang Y., Wang H., Shee D.Y. Measuring e-learning systems success in an organisational context: scale development and validation. Computers in Human Behaviour 2007, 23:1792-1808.
    • (2007) Computers in Human Behaviour , vol.23 , pp. 1792-1808
    • Wang, Y.1    Wang, H.2    Shee, D.Y.3
  • 61
    • 70450273451 scopus 로고    scopus 로고
    • Construction quality in China during transition: a review of literature and empirical examination
    • Yung P., Yip B. Construction quality in China during transition: a review of literature and empirical examination. International Journal of Project Management 2010, 28(1):79-91.
    • (2010) International Journal of Project Management , vol.28 , Issue.1 , pp. 79-91
    • Yung, P.1    Yip, B.2
  • 62
    • 78650362715 scopus 로고    scopus 로고
    • Fostering a strong construction safety culture
    • Zuo P.X.W. Fostering a strong construction safety culture. Leadership and Management in Engineering 2011, 11(1):11-22. 10.1061/(asce)lm.1943-5630.0000093.
    • (2011) Leadership and Management in Engineering , vol.11 , Issue.1 , pp. 11-22
    • Zuo, P.X.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.