메뉴 건너뛰기




Volumn 140, Issue 3, 2014, Pages 365-374

Improved dynamic programming for hydropower reservoir operation

Author keywords

Complementarity; Concavity; Dynamic programming; Hydropower; Monotonicity

Indexed keywords


EID: 84894106514     PISSN: 07339496     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)WR.1943-5452.0000343     Document Type: Article
Times cited : (113)

References (31)
  • 1
    • 84963043949 scopus 로고
    • The dual in nonlinear programming and its economic interpretation
    • Balinski, M. L., and Baumol, W. J. (1968). "The dual in nonlinear programming and its economic interpretation." Rev. Econ. Stud., 35(3), 237-256.
    • (1968) Rev. Econ. Stud. , vol.35 , Issue.3 , pp. 237-256
    • Balinski, M.L.1    Baumol, W.J.2
  • 2
    • 36048989073 scopus 로고    scopus 로고
    • Daily optimized model for long-term operation of the Three Gorges-Gezhouba cascade power stations
    • Cao, G. J., Cai, Z. G., Liu, Z. W., and Wang, G. Q. (2007). "Daily optimized model for long-term operation of the Three Gorges-Gezhouba cascade power stations." Sci. China E, 50(S1), 98-110.
    • (2007) Sci. China E , vol.50 , Issue.S1 , pp. 98-110
    • Cao, G.J.1    Cai, Z.G.2    Liu, Z.W.3    Wang, G.Q.4
  • 3
    • 77956510727 scopus 로고    scopus 로고
    • Tree-based reinforcement learning for optimal water reservoir operation
    • Castelletti, A., Galelli, S., Restelli, M., and Soncini-Sessa, R. (2010). "Tree-based reinforcement learning for optimal water reservoir operation." Water Resour. Res., 46(9), W09507.
    • (2010) Water Resour. Res. , vol.46 , Issue.9
    • Castelletti, A.1    Galelli, S.2    Restelli, M.3    Soncini-Sessa, R.4
  • 4
    • 70349464682 scopus 로고    scopus 로고
    • Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch
    • Cheng, C. T., Liao, S. L., Tang, Z. T., and Zhao, M. Y. (2009). "Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch." Energy Convers. Manage., 50(12), 3007-3014.
    • (2009) Energy Convers. Manage. , vol.50 , Issue.12 , pp. 3007-3014
    • Cheng, C.T.1    Liao, S.L.2    Tang, Z.T.3    Zhao, M.Y.4
  • 5
    • 84860813586 scopus 로고    scopus 로고
    • Short-term scheduling for large-scale cascaded hydropower systems with multivibration zones of high head
    • 10.1061/(ASCE)WR.1943-5452.0000174
    • Cheng, C. T., Shen, J. J., and Wu, X. Y. (2012). "Short-term scheduling for large-scale cascaded hydropower systems with multivibration zones of high head." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000174, 257-267.
    • (2012) J. Water. Resour. Plann. Manage. , pp. 257-267
    • Cheng, C.T.1    Shen, J.J.2    Wu, X.Y.3
  • 6
    • 0024767097 scopus 로고
    • Hydropower optimization via sequential quadratic-programming
    • 10.1061/(ASCE)0733-9496(1989)115:6(715)
    • Diaz, G. E., and Fontane, D. G. (1989). "Hydropower optimization via sequential quadratic-programming." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)0733-9496(1989)115:6(715), 715-734.
    • (1989) J. Water. Resour. Plann. Manage. , pp. 715-734
    • Diaz, G.E.1    Fontane, D.G.2
  • 7
    • 1642538301 scopus 로고    scopus 로고
    • Optimal hedging and carryover storage value
    • 10.1061/(ASCE)0733-9496(2004)130:1(83)
    • Draper, A. J., and Lund, J. R. (2004). "Optimal hedging and carryover storage value." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)0733-9496(2004)130:1(83), 83-87.
    • (2004) J. Water. Resour. Plann. Manage. , pp. 83-87
    • Draper, A.J.1    Lund, J.R.2
  • 8
    • 79955854110 scopus 로고    scopus 로고
    • Optimal multipurposemultireservoir operation model with variable productivity of hydropower plants
    • 10.1061/(ASCE) WR.1943-5452.0000117
    • Goor, Q., Kelman, R., and Tilmant, A. (2011). "Optimal multipurposemultireservoir operation model with variable productivity of hydropower plants." J. Water. Resour. Plann. Manage., 10.1061/(ASCE) WR.1943-5452.0000117, 258-267.
    • (2011) J. Water. Resour. Plann. Manage. , pp. 258-267
    • Goor, Q.1    Kelman, R.2    Tilmant, A.3
  • 9
    • 0021892558 scopus 로고
    • Algorithms for optimizing hydropower system operation
    • Grygier, J. C., and Stedinger, J. R. (1985). "Algorithms for optimizing hydropower system operation." Water Resour. Res., 21(1), 1-10.
    • (1985) Water Resour. Res. , vol.21 , Issue.1 , pp. 1-10
    • Grygier, J.C.1    Stedinger, J.R.2
  • 10
    • 80855155821 scopus 로고    scopus 로고
    • Economic consequences of optimized water management for a prolonged, severe drought in California
    • Harou, J. J., et al. (2010). "Economic consequences of optimized water management for a prolonged, severe drought in California." Water Resour. Res., 46(5), W05522.
    • (2010) Water Resour. Res. , vol.46 , Issue.5
    • Harou, J.J.1
  • 11
    • 1842686887 scopus 로고    scopus 로고
    • Optimal operation of multireservoir systems: Stateof-the-art review
    • 10.1061/(ASCE) 0733-9496(2004)130:2(93)
    • Labadie, J.W. (2004). "Optimal operation of multireservoir systems: Stateof-the-art review." J. Water. Resour. Plann. Manage., 10.1061/(ASCE) 0733-9496(2004)130:2(93), 93-111.
    • (2004) J. Water. Resour. Plann. Manage. , pp. 93-111
    • Labadie, J.W.1
  • 12
    • 37549024571 scopus 로고    scopus 로고
    • Stochastic optimization of multireservoir systems via reinforcement learning
    • Lee, J. H., and Labadie, J. W. (2007). "Stochastic optimization of multireservoir systems via reinforcement learning." Water Resour. Res., 43(11), W11408.
    • (2007) Water Resour. Res. , vol.43 , Issue.11
    • Lee, J.H.1    Labadie, J.W.2
  • 13
    • 80051698341 scopus 로고    scopus 로고
    • Deriving multiple near-optimal solutions to deterministic reservoir operation problems
    • Liu, P., Cai, X. M., and Guo, S. L. (2011). "Deriving multiple near-optimal solutions to deterministic reservoir operation problems." Water Resour. Res., 47(8), W08506.
    • (2011) Water Resour. Res. , vol.47 , Issue.8
    • Liu, P.1    Cai, X.M.2    Guo, S.L.3
  • 14
    • 84861812747 scopus 로고    scopus 로고
    • Finding multiple optimal solutions to optimal load distribution problem in hydropower plant
    • Liu, P., Nguyen, T. D., Cai, X. M., and Jiang, X. H. (2012). "Finding multiple optimal solutions to optimal load distribution problem in hydropower plant." Energies, 5(5), 1413-1432.
    • (2012) Energies , vol.5 , Issue.5 , pp. 1413-1432
    • Liu, P.1    Nguyen, T.D.2    Cai, X.M.3    Jiang, X.H.4
  • 16
    • 33747279036 scopus 로고    scopus 로고
    • Drought storage allocation rules for surface reservoir systems
    • 10.1061/(ASCE)0733-9496(2006)132:5(395)
    • Lund, J. R. (2006). "Drought storage allocation rules for surface reservoir systems." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)0733-9496(2006)132:5(395), 395-397.
    • (2006) J. Water. Resour. Plann. Manage. , pp. 395-397
    • Lund, J.R.1
  • 17
    • 72149121828 scopus 로고    scopus 로고
    • Modeling California's high-elevation hydropower systems in energy units
    • Madani, K., and Lund, J. R. (2009). "Modeling California's high-elevation hydropower systems in energy units." Water Resour. Res., 45(9), W09413.
    • (2009) Water Resour. Res. , vol.45 , Issue.9
    • Madani, K.1    Lund, J.R.2
  • 19
    • 0020190760 scopus 로고
    • Non-linear optimization by successive linear-programming
    • Palacios-Gomez, F., Lasdon, L., and Engquist, M. (1982). "Non-linear optimization by successive linear-programming." Manage. Sci., 28(10), 1106-1120.
    • (1982) Manage. Sci. , vol.28 , Issue.10 , pp. 1106-1120
    • Palacios-Gomez, F.1    Lasdon, L.2    Engquist, M.3
  • 20
    • 78049445069 scopus 로고    scopus 로고
    • Assessment of the economic impact of environmental constraints on short-term hydropower plant operation
    • Perez-Diaz, J. I., and Wilhelmi, J. R. (2010). "Assessment of the economic impact of environmental constraints on short-term hydropower plant operation." Energy Policy, 38(12), 7960-7970.
    • (2010) Energy Policy , vol.38 , Issue.12 , pp. 7960-7970
    • Perez-Diaz, J.I.1    Wilhelmi, J.R.2
  • 21
    • 77955472001 scopus 로고    scopus 로고
    • Optimal short-term operation schedule of a hydropower plant in a competitive electricity market
    • Perez-Diaz, J. I., Wilhelmi, J. R., and Arevalo, L. A. (2010). "Optimal short-term operation schedule of a hydropower plant in a competitive electricity market." Energy Convers. Manage., 51(12), 2955-2966.
    • (2010) Energy Convers. Manage. , vol.51 , Issue.12 , pp. 2955-2966
    • Perez-Diaz, J.I.1    Wilhelmi, J.R.2    Arevalo, L.A.3
  • 22
    • 34547203018 scopus 로고    scopus 로고
    • A stochastic approach to analyze trade-offs and risks associated with large-scale water resources systems
    • Tilmant, A., and Kelman, R. (2007). "A stochastic approach to analyze trade-offs and risks associated with large-scale water resources systems." Water Resour. Res., 43(6), W06425.
    • (2007) Water Resour. Res. , vol.43 , Issue.6
    • Tilmant, A.1    Kelman, R.2
  • 23
    • 0000348040 scopus 로고
    • Minimizing a submodular function on a lattice
    • Topkis, D. M. (1978). "Minimizing a submodular function on a lattice." Oper. Res., 26(2), 305-321.
    • (1978) Oper. Res. , vol.26 , Issue.2 , pp. 305-321
    • Topkis, D.M.1
  • 24
    • 0001405159 scopus 로고
    • Production planning with convex costs-A parametric study
    • Veinott, A. F. (1964). "Production planning with convex costs-A parametric study." Manage. Sci., 10(3), 441-460.
    • (1964) Manage. Sci. , vol.10 , Issue.3 , pp. 441-460
    • Veinott, A.F.1
  • 25
    • 61449182563 scopus 로고    scopus 로고
    • Short-term generation scheduling model of Fujian hydro system
    • Wang, J. W. (2009). "Short-term generation scheduling model of Fujian hydro system." Energy Convers. Manage., 50(4), 1085-1094.
    • (2009) Energy Convers. Manage. , vol.50 , Issue.4 , pp. 1085-1094
    • Wang, J.W.1
  • 26
    • 0027788414 scopus 로고
    • Reservoir-system simulation and optimization models
    • 10.1061/(ASCE)0733-9496(1993)119:4(455)
    • Wurbs, R. A. (1993). "Reservoir-system simulation and optimization models." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)0733-9496(1993)119:4(455), 455-472.
    • (1993) J. Water. Resour. Plann. Manage. , pp. 455-472
    • Wurbs, R.A.1
  • 27
    • 0020335699 scopus 로고
    • Dynamic-programming applications in waterresources
    • Yakowitz, S. (1982). "Dynamic-programming applications in waterresources." Water Resour. Res., 18(4), 673-696.
    • (1982) Water Resour. Res. , vol.18 , Issue.4 , pp. 673-696
    • Yakowitz, S.1
  • 28
    • 0033061181 scopus 로고    scopus 로고
    • A constructive dual DP for a reservoir model with correlation
    • Yang, M., and Read, E. G. (1999). "A constructive dual DP for a reservoir model with correlation." Water Resour. Res., 35(7), 2247-2257.
    • (1999) Water Resour. Res. , vol.35 , Issue.7 , pp. 2247-2257
    • Yang, M.1    Read, E.G.2
  • 30
    • 80051702733 scopus 로고    scopus 로고
    • Optimality conditions for a two-stage reservoir operation problem
    • Zhao, J. S., Cai, X. M., andWang, Z. J. (2011). "Optimality conditions for a two-stage reservoir operation problem." Water Resour. Res., 47(8), W08503.
    • (2011) Water Resour. Res. , vol.47 , Issue.8
    • Zhao, J.S.1    Cai, X.M.2    Wang, Z.J.3
  • 31
    • 84876740811 scopus 로고    scopus 로고
    • Improved dynamic programming for reservoir operation optimization with a concave objective function
    • 10.1061/(ASCE)WR.1943-5452.0000205
    • Zhao, T. T. G., Cai, X. M., Lei, X., and Wang, H. (2012). "Improved dynamic programming for reservoir operation optimization with a concave objective function." J. Water. Resour. Plann. Manage., 10.1061/(ASCE)WR.1943-5452.0000205, 590-596.
    • (2012) J. Water. Resour. Plann. Manage. , pp. 590-596
    • Zhao, T.T.G.1    Cai, X.M.2    Lei, X.3    Wang, H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.