-
2
-
-
33646750129
-
Management and construction of the Three Gorges Project
-
6
-
Dai H C, Cao G J, Su H Z. Management and construction of the Three Gorges Project. J Constr Eng Manag ASCE, 2006, 132(6): 615-619
-
(2006)
J Constr Eng Manag ASCE
, vol.132
, pp. 615-619
-
-
Dai, H.C.1
Cao, G.J.2
Su, H.Z.3
-
3
-
-
36048996826
-
Application of fuzzy dynamic planning in the short-term optimized operation of the TGP Cascade Power Station
-
8
-
Zou J, Zhang Y C. Application of fuzzy dynamic planning in the short-term optimized operation of the TGP Cascade Power Station. Water Res Hydropow Eng (in Chinese), 2004, 35(8): 89-93
-
(2004)
Water Res Hydropow Eng (In Chinese)
, vol.35
, pp. 89-93
-
-
Zou, J.1
Zhang, Y.C.2
-
4
-
-
36049020843
-
Application of random dynamic planning in the long-term optimized operation of the TGP Cascade Power Station
-
8
-
Wang J W, Yuan X H, Zhang Y C. Application of random dynamic planning in the long-term optimized operation of the TGP Cascade Power Station. Electr Power Autom Equip (in Chinese), 2002, 22(8): 54-57
-
(2002)
Electr Power Autom Equip (In Chinese)
, vol.22
, pp. 54-57
-
-
Wang, J.W.1
Yuan, X.H.2
Zhang, Y.C.3
-
6
-
-
0036325502
-
Machine learning in real-time control of water systems
-
Lobbrecht A H, Solomatine D P. Machine learning in real-time control of water systems. Urban Water, 2002, 4: 283-289
-
(2002)
Urban Water
, vol.4
, pp. 283-289
-
-
Lobbrecht, A.H.1
Solomatine, D.P.2
-
7
-
-
38049037351
-
Research on the function of long-and medium-term operation of reservoirs based on genetic algorithm
-
10
-
Wang D Q, Li C J, Zhang M. Research on the function of long-and medium-term operation of reservoirs based on genetic algorithm. Water Power (in Chinese), 2006, 32(10): 92-94
-
(2006)
Water Power (In Chinese)
, vol.32
, pp. 92-94
-
-
Wang, D.Q.1
Li, C.J.2
Zhang, M.3
-
8
-
-
5744226445
-
Research on optimized operation of hydropower stations based on parallel combined simulated annealing algorithm
-
4
-
Zhang S H, Huang Q, Sun T R. Research on optimized operation of hydropower stations based on parallel combined simulated annealing algorithm. J Hydroelectr Eng (in Chinese), 2004, 23(4): 16-20
-
(2004)
J Hydroelectr Eng (In Chinese)
, vol.23
, pp. 16-20
-
-
Zhang, S.H.1
Huang, Q.2
Sun, T.R.3
-
10
-
-
36048945901
-
-
Yangtze River Water Resources Committee, China Three Gorges Project Corporation, State Council Three Gorges Project Construction Committee 2006-09-02
-
Yangtze River Water Resources Committee, China Three Gorges Project Corporation, State Council Three Gorges Project Construction Committee. Specifications for the Cascade Regulation of the Three Gorges-Gezhouba Hydro-complex (in Chinese). 2006-09-02
-
Specifications for the Cascade Regulation of the Three Gorges-Gezhouba Hydro-complex (in Chinese)
-
-
-
12
-
-
0036519517
-
Optimized operation scheme for deposition reduction and enhancement flood control capacity of Three Gorges Project reservoir
-
Zhou J J, Lin B N, Zhang R. Optimized operation scheme for deposition reduction and enhancement flood control capacity of Three Gorges Project reservoir. J Hydr Eng (in Chinese), 2003, 3: 12-19
-
(2003)
J Hydr Eng (In Chinese)
, vol.3
, pp. 12-19
-
-
Zhou, J.J.1
Lin, B.N.2
Zhang, R.3
|