-
1
-
-
77949554829
-
Nonlinear optimization method for short-term hydro scheduling considering head-dependency
-
1430-144X.
-
Catalão J.P. S. Mariano S.J. P. S. Mendes V.M. F. Ferreira L.A. F. M. Nonlinear optimization method for short-term hydro scheduling considering head-dependency. Eur. Trans. Electr. Power 2008, 20(2):172-183. 1430-144X.
-
(2008)
Eur. Trans. Electr. Power
, vol.20
, Issue.2
, pp. 172-183
-
-
Catalão, J.P.S.1
Mariano, S.J.P.S.2
Mendes, V.M.F.3
Ferreira, L.A.F.M.4
-
2
-
-
60149084350
-
Scheduling of head-sensitive cascaded hydro systems: a nonlinear approach
-
ITPSEG, 0885-8950, 10.1109/TPWRS.2008.2005708.
-
Catalão J.P. S. Mariano S.J. P. S. Mendes V.M. F. Ferreira L.A. F. M. Scheduling of head-sensitive cascaded hydro systems: nonlinear approach. IEEE Trans. Power Syst. 2009, 24(1):337-346. ITPSEG, 0885-8950, 10.1109/TPWRS.2008.2005708.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.1
, pp. 337-346
-
-
Catalão, J.P.S.1
Mariano, S.J.P.S.2
Mendes, V.M.F.3
Ferreira, L.A.F.M.4
-
3
-
-
70349464682
-
Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch
-
ECMADL, 0196-8904, 10.1016/j.enconman.2009.07.020.
-
Cheng C.T. Liao S.L. Tang Z.T. Zhao M.Y. Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch. Energy Convers. Manage. 2009, 50(12):3007-3014. ECMADL, 0196-8904, 10.1016/j.enconman.2009.07.020.
-
(2009)
Energy Convers. Manage.
, vol.50
, Issue.12
, pp. 3007-3014
-
-
Cheng, C.T.1
Liao, S.L.2
Tang, Z.T.3
Zhao, M.Y.4
-
4
-
-
77952769286
-
Key Technologies to optimize operation system for large-scale hydropower stations in provincial power systems
-
(in Chinese).
-
Cheng C.T. Liao S.L. Wu X.Y. Zhang S.Q. Key Technologies to optimize operation system for large-scale hydropower stations in provincial power systems. J. Hydraul. Eng. 2010, 41(4):477-482. (in Chinese).
-
(2010)
J. Hydraul. Eng.
, vol.41
, Issue.4
, pp. 477-482
-
-
Cheng, C.T.1
Liao, S.L.2
Wu, X.Y.3
Zhang, S.Q.4
-
5
-
-
0026910052
-
Hydro-thermal power flow scheduling accounting for head variations
-
ITPSEG, 0885-8950, 10.1109/59.207338.
-
El-Hawary M.E. Ravindranath K.M. Hydro-thermal power flow scheduling accounting for head variations. IEEE Trans. Power Syst. 1992, 7(3):1232-1238. ITPSEG, 0885-8950, 10.1109/59.207338.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, Issue.3
, pp. 1232-1238
-
-
El-Hawary, M.E.1
Ravindranath, K.M.2
-
6
-
-
20544451752
-
Unit commitment of single hydroelectric plant
-
EPSRDN, 0378-7796, 10.1016/j.epsr.2005.01.008.
-
Finardi E.C. da Silva E.L. Unit commitment of single hydroelectric plant. Electr. Power Syst. Res. 2005, 75(2-3):116-123. EPSRDN, 0378-7796, 10.1016/j.epsr.2005.01.008.
-
(2005)
Electr. Power Syst. Res.
, vol.75
, Issue.2-3
, pp. 116-123
-
-
Finardi, E.C.1
da Silva, E.L.2
-
7
-
-
33646376903
-
Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming
-
ITPSEG, 0885-8950, 10.1109/TPWRS.2006.873121.
-
Finardi E.C. da Silva E.L. Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming. IEEE Trans. Power Syst. 2006, 21(2):835-844. ITPSEG, 0885-8950, 10.1109/TPWRS.2006.873121.
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.2
, pp. 835-844
-
-
Finardi, E.C.1
da Silva, E.L.2
-
8
-
-
0030799099
-
Control models for hydroelectric energy optimization
-
WRERAQ, 0043-1397, 10.1029/97WR01714.
-
Georgakakos A.P. Yao H. Yu Y. Control models for hydroelectric energy optimization. Water Resour. Res. 1997, 33(10):2367-2379. WRERAQ, 0043-1397, 10.1029/97WR01714,.
-
(1997)
Water Resour. Res.
, vol.33
, Issue.10
, pp. 2367-2379
-
-
Georgakakos, A.P.1
Yao, H.2
Yu, Y.3
-
9
-
-
0031030543
-
Control model for hydroelectric energy-value optimization
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1997)123:1(30).
-
Georgakakos A.P. Yao H. Yu Y. Control model for hydroelectric energy-value optimization. J. Water Resour. Plann. Manage. 1997, 123(1):30-38. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1997)123:1(30).
-
(1997)
J. Water Resour. Plann. Manage.
, vol.123
, Issue.1
, pp. 30-38
-
-
Georgakakos, A.P.1
Yao, H.2
Yu, Y.3
-
10
-
-
0033080313
-
Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
-
ITPSEG, 0885-8950, 10.1109/59.744500.
-
Guan X. Svoboda A. Li C.-A. Scheduling hydro power systems with restricted operating zones and discharge ramping constraints. IEEE Trans. Power Syst. 1999, 14(1):126-131. ITPSEG, 0885-8950, 10.1109/59.744500.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.1
, pp. 126-131
-
-
Guan, X.1
Svoboda, A.2
Li, C.-A.3
-
11
-
-
0016473041
-
A new algorithm for the solution of multi-state dynamic programming problems
-
MHPGA4, 1436-4646, 10.1007/BF01580431.
-
Howson H.R. Sancho N.G. F. new algorithm for the solution of multi-state dynamic programming problems. Math. Program. 1975, 8(1):104-116. MHPGA4, 1436-4646, 10.1007/BF01580431.
-
(1975)
Math. Program.
, vol.8
, Issue.1
, pp. 104-116
-
-
Howson, H.R.1
Sancho, N.G.F.2
-
12
-
-
0026157745
-
Optimal short term hydro scheduling including security constraints
-
ITPSEG, 0885-8950, 10.1109/59.76700.
-
Johannesen A. Gjelsvik A. Fosso O.B. Flatabo N. Optimal short term hydro scheduling including security constraints. IEEE Trans. Power Syst. 1991, 6(2):576-583. ITPSEG, 0885-8950, 10.1109/59.76700.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, Issue.2
, pp. 576-583
-
-
Johannesen, A.1
Gjelsvik, A.2
Fosso, O.B.3
Flatabo, N.4
-
13
-
-
1842686887
-
Optimal operation of multireservoir systems: State-of-the-art review
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:2(93).
-
Labadie J.W. Optimal operation of multireservoir systems: State-of-the-art review. J. Water Resour. Plann. Manage. 2004, 130(2):93-111. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:2(93).
-
(2004)
J. Water Resour. Plann. Manage.
, vol.130
, Issue.2
, pp. 93-111
-
-
Labadie, J.W.1
-
14
-
-
0022268695
-
Short-term hydroelectric scheduling using the progressive optimality algorithm
-
WRERAQ, 0043-1397, 10.1029/WR021i009p01456.
-
Lucas N.J. D. Perera P.J. Short-term hydroelectric scheduling using the progressive optimality algorithm. Water Resour. Res. 1985, 21(9):1456-1458. WRERAQ, 0043-1397, 10.1029/WR021i009p01456.
-
(1985)
Water Resour. Res.
, vol.21
, Issue.9
, pp. 1456-1458
-
-
Lucas, N.J.D.1
Perera, P.J.2
-
15
-
-
0022218152
-
Dynamic model for multireservoir operation
-
WRERAQ, 0043-1397, 10.1029/WR021i005p00619.
-
Mariño M.A. Loaiciga H.A. Dynamic model for multireservoir operation. Water Resour. Res. 1985, 21(5):619-630. WRERAQ, 0043-1397, 10.1029/WR021i005p00619.
-
(1985)
Water Resour. Res.
, vol.21
, Issue.5
, pp. 619-630
-
-
Mariño, M.A.1
Loaiciga, H.A.2
-
16
-
-
0022268631
-
Quadratic model for reservoir management: Application to the Central Valley Project
-
WRERAQ, 0043-1397, 10.1029/WR021i005p00631.
-
Mariño M.A. Loaiciga H.A. Quadratic model for reservoir management: Application to the Central Valley Project. Water Resour. Res. 1985, 21(5):631-641. WRERAQ, 0043-1397, 10.1029/WR021i005p00631.
-
(1985)
Water Resour. Res.
, vol.21
, Issue.5
, pp. 631-641
-
-
Mariño, M.A.1
Loaiciga, H.A.2
-
17
-
-
0033079737
-
A review of selected optimal power flow literature to 1993, Part I: Nonlinear and quadratic programming approaches
-
ITPSEG, 0885-8950, 10.1109/59.744492, Adapa, R.
-
Momoh J.A. El-Hawary M.E. A review of selected optimal power flow literature to 1993, Part I: Nonlinear and quadratic programming approaches. IEEE Trans. Power Syst. 1999, 14(1):96-104. ITPSEG, 0885-8950, 10.1109/59.744492, Adapa, R.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.1
, pp. 96-104
-
-
Momoh, J.A.1
El-Hawary, M.E.2
-
18
-
-
0033079460
-
A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods
-
ITPSEG, 0885-8950, 10.1109/59.744495.
-
Momoh J.A. El-Hawary M.E. Adapa R. A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods. IEEE Trans. Power Syst. 1999, 14(1):105-111. ITPSEG, 0885-8950, 10.1109/59.744495.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.1
, pp. 105-111
-
-
Momoh, J.A.1
El-Hawary, M.E.2
Adapa, R.3
-
19
-
-
0019556520
-
Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm
-
IEPSA9, 0018-9510, 10.1109/TPAS.1981.316486.
-
Nanda J. Bijwe P.R. Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm. IEEE Trans. Power Appar. Syst. 1981, PAS-100(4):2093-2099. IEPSA9, 0018-9510, 10.1109/TPAS.1981.316486.
-
(1981)
IEEE Trans. Power Appar. Syst.
, vol.PAS-100
, Issue.4
, pp. 2093-2099
-
-
Nanda, J.1
Bijwe, P.R.2
-
20
-
-
0022544778
-
Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data
-
0142-0615, 10.1016/0142-0615(86)90026-8.
-
Nanda J. Bijwe P.R. Kothari D.P. Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data. Int. J. Electr. Power Energy Syst. 1986, 8(1):61-64. 0142-0615, 10.1016/0142-0615(86)90026-8.
-
(1986)
Int. J. Electr. Power Energy Syst.
, vol.8
, Issue.1
, pp. 61-64
-
-
Nanda, J.1
Bijwe, P.R.2
Kothari, D.P.3
-
21
-
-
0034138954
-
Hydro system scheduling using ANN approach
-
ITPSEG, 0885-8950, 10.1109/59.852149.
-
Naresh R. Sharma J. Hydro system scheduling using ANN approach. IEEE Trans. Power Syst. 2000, 15(1):388-395. ITPSEG, 0885-8950, 10.1109/59.852149.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.1
, pp. 388-395
-
-
Naresh, R.1
Sharma, J.2
-
22
-
-
0141569592
-
Minimizing variance of reservoir systems operations benefits using soft computing tools
-
FSSYD8, 0165-0114, 10.1016/S0165-0114(02)00546-8, and J.
-
Ponnambalam K. Karray F. Mousavi S. Minimizing variance of reservoir systems operations benefits using soft computing tools. Fuzzy Sets Syst. 2003, 139(2):451-461. FSSYD8, 0165-0114, 10.1016/S0165-0114(02)00546-8, and J.
-
(2003)
Fuzzy Sets Syst.
, vol.139
, Issue.2
, pp. 451-461
-
-
Ponnambalam, K.1
Karray, F.2
Mousavi, S.3
-
23
-
-
0028428070
-
Optimal short-term scheduling for a large-scale cascaded hydro system
-
ITPSEG, 0885-8950, 10.1109/59.317636.
-
Piekutowski M. Litwinowicz T. Frowd R.J. Optimal short-term scheduling for large-scale cascaded hydro system. IEEE Trans. Power Syst. 1994, 9(2):805-811. ITPSEG, 0885-8950, 10.1109/59.317636.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.2
, pp. 805-811
-
-
Piekutowski, M.1
Litwinowicz, T.2
Frowd, R.J.3
-
24
-
-
0034243270
-
The B. C. Hydro short term hydro scheduling optimization model
-
ITPSEG, 0885-8950, 10.1109/59.871743.
-
Shawwash Z.K. Siu T.K. Russell D. The B. C. Hydro short term hydro scheduling optimization model. IEEE Trans. Power Syst. 2000, 15(3):1125-1131. ITPSEG, 0885-8950, 10.1109/59.871743.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.3
, pp. 1125-1131
-
-
Shawwash, Z.K.1
Siu, T.K.2
Russell, D.3
-
25
-
-
0026788658
-
Reservoir systems analysis: Closing gap between theory and practice
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1992)118:3(262).
-
Simonovic S.P. Reservoir systems analysis: Closing gap between theory and practice. J. Water Resour. Plann. Manage. 1992, 118(3):262-280. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1992)118:3(262).
-
(1992)
J. Water Resour. Plann. Manage.
, vol.118
, Issue.3
, pp. 262-280
-
-
Simonovic, S.P.1
-
26
-
-
0034161326
-
Short-term operation model for coupled hydropower reservoirs
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
-
Teegavarapu R.S. V. Simonovic S.P. Short-term operation model for coupled hydropower reservoirs. J. Water Resour. Plann. Manage. 2000, 126(2):98-106. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
-
(2000)
J. Water Resour. Plann. Manage.
, vol.126
, Issue.2
, pp. 98-106
-
-
Teegavarapu, R.S.V.1
Simonovic, S.P.2
-
27
-
-
0025000966
-
Optimization of value of CVP's hydropower production
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1990)116:1(52).
-
Tejada-Guibert J.A. Stedinger J.R. Staschus K. Optimization of value of CVP's hydropower production. J. Water Resour. Plann. Manage. 1990, 116(1):52-70. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1990)116:1(52).
-
(1990)
J. Water Resour. Plann. Manage.
, vol.116
, Issue.1
, pp. 52-70
-
-
Tejada-Guibert, J.A.1
Stedinger, J.R.2
Staschus, K.3
-
28
-
-
0019728413
-
Optimal short-term hydro scheduling from the principle of progressive optimality
-
WRERAQ, 0043-1397, 10.1029/WR017i003p00481.
-
Turgeon A. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resour. Res. 1981, 17(3):481-486. WRERAQ, 0043-1397, 10.1029/WR017i003p00481.
-
(1981)
Water Resour. Res.
, vol.17
, Issue.3
, pp. 481-486
-
-
Turgeon, A.1
-
29
-
-
0027788414
-
Reservoir-system simulation and optimization models
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1993)119:4(455).
-
Wurbs R.A. Reservoir-system simulation and optimization models. J. Water Resour. Plann. Manage. 1993, 119(4):455-472. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1993)119:4(455).
-
(1993)
J. Water Resour. Plann. Manage.
, vol.119
, Issue.4
, pp. 455-472
-
-
Wurbs, R.A.1
-
30
-
-
0032592944
-
Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
-
ITPSEG, 0885-8950, 10.1109/59.780941.
-
Xi E. Guan X. Li R. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs. IEEE Trans. Power Syst. 1999, 14(3):1127-1132. ITPSEG, 0885-8950, 10.1109/59.780941.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.3
, pp. 1127-1132
-
-
Xi, E.1
Guan, X.2
Li, R.3
-
31
-
-
0022268780
-
Reservoir management and operations models: A state-of-the-art review
-
WRERAQ, 0043-1397, 10.1029/WR021i012p01797.
-
Yeh W.W.-G. Reservoir management and operations models: state-of-the-art review. Water Resour. Res. 1985, 21(12):1797-1818. WRERAQ, 0043-1397, 10.1029/WR021i012p01797.
-
(1985)
Water Resour. Res.
, vol.21
, Issue.12
, pp. 1797-1818
-
-
Yeh, W.W.-G.1
-
32
-
-
0141744797
-
Dynamic optimal unit commitment and loading in hydropower systems
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
-
Yi J. Labadie J.W. Stitt S. Dynamic optimal unit commitment and loading in hydropower systems. J. Water Resour. Plann. Manage. 2003, 129(5):388-398. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
-
(2003)
J. Water Resour. Plann. Manage.
, vol.129
, Issue.5
, pp. 388-398
-
-
Yi, J.1
Labadie, J.W.2
Stitt, S.3
|