Volumn 138, Issue 3, 2012, Pages 257-267

Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head

Author keywords

Large scale hydropower system; Multivibration zones; Peak load regulation; Short term scheduling

Indexed keywords

CASCADED HYDRO-POWER SYSTEM; COMPLEX CONSTRAINTS; FEASIBLE SOLUTION; HUGE HYDROPOWER PLANT; HYDRO UNIT COMMITMENT; HYDROPOWER SCHEDULING; HYDROPOWER SYSTEM; LARGE PLANTS; LOAD SERIES; MULTIVIBRATION ZONES; NONLINEAR FUNCTIONS; OPTIMIZATION FRAMEWORK; PEAK LOAD; PROGRESSIVE OPTIMALITY ALGORITHM; REAL-TIME OPERATION; SEARCH PROCESS; SHORT-TERM SCHEDULING; STANDARD DEVIATION; THERMAL SYSTEMS;

EID: 84860813586     PISSN: 07339496     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)WR.1943-5452.0000174     Document Type: Article
Times cited : (80)

References (32)
  • 1
    • 77949554829 scopus 로고    scopus 로고
    • Nonlinear optimization method for short-term hydro scheduling considering head-dependency
    • 1430-144X.
    • Catalão J.P. S. Mariano S.J. P. S. Mendes V.M. F. Ferreira L.A. F. M. Nonlinear optimization method for short-term hydro scheduling considering head-dependency. Eur. Trans. Electr. Power 2008, 20(2):172-183. 1430-144X.
    • (2008) Eur. Trans. Electr. Power , vol.20 , Issue.2 , pp. 172-183
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 2
    • 60149084350 scopus 로고    scopus 로고
    • Scheduling of head-sensitive cascaded hydro systems: a nonlinear approach
    • ITPSEG, 0885-8950, 10.1109/TPWRS.2008.2005708.
    • Catalão J.P. S. Mariano S.J. P. S. Mendes V.M. F. Ferreira L.A. F. M. Scheduling of head-sensitive cascaded hydro systems: nonlinear approach. IEEE Trans. Power Syst. 2009, 24(1):337-346. ITPSEG, 0885-8950, 10.1109/TPWRS.2008.2005708.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.1 , pp. 337-346
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 3
    • 70349464682 scopus 로고    scopus 로고
    • Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch
    • ECMADL, 0196-8904, 10.1016/j.enconman.2009.07.020.
    • Cheng C.T. Liao S.L. Tang Z.T. Zhao M.Y. Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch. Energy Convers. Manage. 2009, 50(12):3007-3014. ECMADL, 0196-8904, 10.1016/j.enconman.2009.07.020.
    • (2009) Energy Convers. Manage. , vol.50 , Issue.12 , pp. 3007-3014
    • Cheng, C.T.1    Liao, S.L.2    Tang, Z.T.3    Zhao, M.Y.4
  • 4
    • 77952769286 scopus 로고    scopus 로고
    • Key Technologies to optimize operation system for large-scale hydropower stations in provincial power systems
    • (in Chinese).
    • Cheng C.T. Liao S.L. Wu X.Y. Zhang S.Q. Key Technologies to optimize operation system for large-scale hydropower stations in provincial power systems. J. Hydraul. Eng. 2010, 41(4):477-482. (in Chinese).
    • (2010) J. Hydraul. Eng. , vol.41 , Issue.4 , pp. 477-482
    • Cheng, C.T.1    Liao, S.L.2    Wu, X.Y.3    Zhang, S.Q.4
  • 5
    • 0026910052 scopus 로고
    • Hydro-thermal power flow scheduling accounting for head variations
    • ITPSEG, 0885-8950, 10.1109/59.207338.
    • El-Hawary M.E. Ravindranath K.M. Hydro-thermal power flow scheduling accounting for head variations. IEEE Trans. Power Syst. 1992, 7(3):1232-1238. ITPSEG, 0885-8950, 10.1109/59.207338.
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.3 , pp. 1232-1238
    • El-Hawary, M.E.1    Ravindranath, K.M.2
  • 6
    • 20544451752 scopus 로고    scopus 로고
    • Unit commitment of single hydroelectric plant
    • EPSRDN, 0378-7796, 10.1016/j.epsr.2005.01.008.
    • Finardi E.C. da Silva E.L. Unit commitment of single hydroelectric plant. Electr. Power Syst. Res. 2005, 75(2-3):116-123. EPSRDN, 0378-7796, 10.1016/j.epsr.2005.01.008.
    • (2005) Electr. Power Syst. Res. , vol.75 , Issue.2-3 , pp. 116-123
    • Finardi, E.C.1    da Silva, E.L.2
  • 7
    • 33646376903 scopus 로고    scopus 로고
    • Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming
    • ITPSEG, 0885-8950, 10.1109/TPWRS.2006.873121.
    • Finardi E.C. da Silva E.L. Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming. IEEE Trans. Power Syst. 2006, 21(2):835-844. ITPSEG, 0885-8950, 10.1109/TPWRS.2006.873121.
    • (2006) IEEE Trans. Power Syst. , vol.21 , Issue.2 , pp. 835-844
    • Finardi, E.C.1    da Silva, E.L.2
  • 8
    • 0030799099 scopus 로고    scopus 로고
    • Control models for hydroelectric energy optimization
    • WRERAQ, 0043-1397, 10.1029/97WR01714.
    • Georgakakos A.P. Yao H. Yu Y. Control models for hydroelectric energy optimization. Water Resour. Res. 1997, 33(10):2367-2379. WRERAQ, 0043-1397, 10.1029/97WR01714,.
    • (1997) Water Resour. Res. , vol.33 , Issue.10 , pp. 2367-2379
    • Georgakakos, A.P.1    Yao, H.2    Yu, Y.3
  • 9
    • 0031030543 scopus 로고    scopus 로고
    • Control model for hydroelectric energy-value optimization
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1997)123:1(30).
    • Georgakakos A.P. Yao H. Yu Y. Control model for hydroelectric energy-value optimization. J. Water Resour. Plann. Manage. 1997, 123(1):30-38. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1997)123:1(30).
    • (1997) J. Water Resour. Plann. Manage. , vol.123 , Issue.1 , pp. 30-38
    • Georgakakos, A.P.1    Yao, H.2    Yu, Y.3
  • 10
    • 0033080313 scopus 로고    scopus 로고
    • Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
    • ITPSEG, 0885-8950, 10.1109/59.744500.
    • Guan X. Svoboda A. Li C.-A. Scheduling hydro power systems with restricted operating zones and discharge ramping constraints. IEEE Trans. Power Syst. 1999, 14(1):126-131. ITPSEG, 0885-8950, 10.1109/59.744500.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 126-131
    • Guan, X.1    Svoboda, A.2    Li, C.-A.3
  • 11
    • 0016473041 scopus 로고
    • A new algorithm for the solution of multi-state dynamic programming problems
    • MHPGA4, 1436-4646, 10.1007/BF01580431.
    • Howson H.R. Sancho N.G. F. new algorithm for the solution of multi-state dynamic programming problems. Math. Program. 1975, 8(1):104-116. MHPGA4, 1436-4646, 10.1007/BF01580431.
    • (1975) Math. Program. , vol.8 , Issue.1 , pp. 104-116
    • Howson, H.R.1    Sancho, N.G.F.2
  • 12
    • 0026157745 scopus 로고
    • Optimal short term hydro scheduling including security constraints
    • ITPSEG, 0885-8950, 10.1109/59.76700.
    • Johannesen A. Gjelsvik A. Fosso O.B. Flatabo N. Optimal short term hydro scheduling including security constraints. IEEE Trans. Power Syst. 1991, 6(2):576-583. ITPSEG, 0885-8950, 10.1109/59.76700.
    • (1991) IEEE Trans. Power Syst. , vol.6 , Issue.2 , pp. 576-583
    • Johannesen, A.1    Gjelsvik, A.2    Fosso, O.B.3    Flatabo, N.4
  • 13
    • 1842686887 scopus 로고    scopus 로고
    • Optimal operation of multireservoir systems: State-of-the-art review
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:2(93).
    • Labadie J.W. Optimal operation of multireservoir systems: State-of-the-art review. J. Water Resour. Plann. Manage. 2004, 130(2):93-111. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:2(93).
    • (2004) J. Water Resour. Plann. Manage. , vol.130 , Issue.2 , pp. 93-111
    • Labadie, J.W.1
  • 14
    • 0022268695 scopus 로고
    • Short-term hydroelectric scheduling using the progressive optimality algorithm
    • WRERAQ, 0043-1397, 10.1029/WR021i009p01456.
    • Lucas N.J. D. Perera P.J. Short-term hydroelectric scheduling using the progressive optimality algorithm. Water Resour. Res. 1985, 21(9):1456-1458. WRERAQ, 0043-1397, 10.1029/WR021i009p01456.
    • (1985) Water Resour. Res. , vol.21 , Issue.9 , pp. 1456-1458
    • Lucas, N.J.D.1    Perera, P.J.2
  • 15
    • 0022218152 scopus 로고
    • Dynamic model for multireservoir operation
    • WRERAQ, 0043-1397, 10.1029/WR021i005p00619.
    • Mariño M.A. Loaiciga H.A. Dynamic model for multireservoir operation. Water Resour. Res. 1985, 21(5):619-630. WRERAQ, 0043-1397, 10.1029/WR021i005p00619.
    • (1985) Water Resour. Res. , vol.21 , Issue.5 , pp. 619-630
    • Mariño, M.A.1    Loaiciga, H.A.2
  • 16
    • 0022268631 scopus 로고
    • Quadratic model for reservoir management: Application to the Central Valley Project
    • WRERAQ, 0043-1397, 10.1029/WR021i005p00631.
    • Mariño M.A. Loaiciga H.A. Quadratic model for reservoir management: Application to the Central Valley Project. Water Resour. Res. 1985, 21(5):631-641. WRERAQ, 0043-1397, 10.1029/WR021i005p00631.
    • (1985) Water Resour. Res. , vol.21 , Issue.5 , pp. 631-641
    • Mariño, M.A.1    Loaiciga, H.A.2
  • 17
    • 0033079737 scopus 로고    scopus 로고
    • A review of selected optimal power flow literature to 1993, Part I: Nonlinear and quadratic programming approaches
    • ITPSEG, 0885-8950, 10.1109/59.744492, Adapa, R.
    • Momoh J.A. El-Hawary M.E. A review of selected optimal power flow literature to 1993, Part I: Nonlinear and quadratic programming approaches. IEEE Trans. Power Syst. 1999, 14(1):96-104. ITPSEG, 0885-8950, 10.1109/59.744492, Adapa, R.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 96-104
    • Momoh, J.A.1    El-Hawary, M.E.2
  • 18
    • 0033079460 scopus 로고    scopus 로고
    • A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods
    • ITPSEG, 0885-8950, 10.1109/59.744495.
    • Momoh J.A. El-Hawary M.E. Adapa R. A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods. IEEE Trans. Power Syst. 1999, 14(1):105-111. ITPSEG, 0885-8950, 10.1109/59.744495.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 105-111
    • Momoh, J.A.1    El-Hawary, M.E.2    Adapa, R.3
  • 19
    • 0019556520 scopus 로고
    • Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm
    • IEPSA9, 0018-9510, 10.1109/TPAS.1981.316486.
    • Nanda J. Bijwe P.R. Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm. IEEE Trans. Power Appar. Syst. 1981, PAS-100(4):2093-2099. IEPSA9, 0018-9510, 10.1109/TPAS.1981.316486.
    • (1981) IEEE Trans. Power Appar. Syst. , vol.PAS-100 , Issue.4 , pp. 2093-2099
    • Nanda, J.1    Bijwe, P.R.2
  • 20
    • 0022544778 scopus 로고
    • Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data
    • 0142-0615, 10.1016/0142-0615(86)90026-8.
    • Nanda J. Bijwe P.R. Kothari D.P. Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data. Int. J. Electr. Power Energy Syst. 1986, 8(1):61-64. 0142-0615, 10.1016/0142-0615(86)90026-8.
    • (1986) Int. J. Electr. Power Energy Syst. , vol.8 , Issue.1 , pp. 61-64
    • Nanda, J.1    Bijwe, P.R.2    Kothari, D.P.3
  • 21
    • 0034138954 scopus 로고    scopus 로고
    • Hydro system scheduling using ANN approach
    • ITPSEG, 0885-8950, 10.1109/59.852149.
    • Naresh R. Sharma J. Hydro system scheduling using ANN approach. IEEE Trans. Power Syst. 2000, 15(1):388-395. ITPSEG, 0885-8950, 10.1109/59.852149.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.1 , pp. 388-395
    • Naresh, R.1    Sharma, J.2
  • 22
    • 0141569592 scopus 로고    scopus 로고
    • Minimizing variance of reservoir systems operations benefits using soft computing tools
    • FSSYD8, 0165-0114, 10.1016/S0165-0114(02)00546-8, and J.
    • Ponnambalam K. Karray F. Mousavi S. Minimizing variance of reservoir systems operations benefits using soft computing tools. Fuzzy Sets Syst. 2003, 139(2):451-461. FSSYD8, 0165-0114, 10.1016/S0165-0114(02)00546-8, and J.
    • (2003) Fuzzy Sets Syst. , vol.139 , Issue.2 , pp. 451-461
    • Ponnambalam, K.1    Karray, F.2    Mousavi, S.3
  • 23
    • 0028428070 scopus 로고
    • Optimal short-term scheduling for a large-scale cascaded hydro system
    • ITPSEG, 0885-8950, 10.1109/59.317636.
    • Piekutowski M. Litwinowicz T. Frowd R.J. Optimal short-term scheduling for large-scale cascaded hydro system. IEEE Trans. Power Syst. 1994, 9(2):805-811. ITPSEG, 0885-8950, 10.1109/59.317636.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.2 , pp. 805-811
    • Piekutowski, M.1    Litwinowicz, T.2    Frowd, R.J.3
  • 24
    • 0034243270 scopus 로고    scopus 로고
    • The B. C. Hydro short term hydro scheduling optimization model
    • ITPSEG, 0885-8950, 10.1109/59.871743.
    • Shawwash Z.K. Siu T.K. Russell D. The B. C. Hydro short term hydro scheduling optimization model. IEEE Trans. Power Syst. 2000, 15(3):1125-1131. ITPSEG, 0885-8950, 10.1109/59.871743.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.3 , pp. 1125-1131
    • Shawwash, Z.K.1    Siu, T.K.2    Russell, D.3
  • 25
    • 0026788658 scopus 로고
    • Reservoir systems analysis: Closing gap between theory and practice
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1992)118:3(262).
    • Simonovic S.P. Reservoir systems analysis: Closing gap between theory and practice. J. Water Resour. Plann. Manage. 1992, 118(3):262-280. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1992)118:3(262).
    • (1992) J. Water Resour. Plann. Manage. , vol.118 , Issue.3 , pp. 262-280
    • Simonovic, S.P.1
  • 26
    • 0034161326 scopus 로고    scopus 로고
    • Short-term operation model for coupled hydropower reservoirs
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
    • Teegavarapu R.S. V. Simonovic S.P. Short-term operation model for coupled hydropower reservoirs. J. Water Resour. Plann. Manage. 2000, 126(2):98-106. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
    • (2000) J. Water Resour. Plann. Manage. , vol.126 , Issue.2 , pp. 98-106
    • Teegavarapu, R.S.V.1    Simonovic, S.P.2
  • 27
    • 0025000966 scopus 로고
    • Optimization of value of CVP's hydropower production
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1990)116:1(52).
    • Tejada-Guibert J.A. Stedinger J.R. Staschus K. Optimization of value of CVP's hydropower production. J. Water Resour. Plann. Manage. 1990, 116(1):52-70. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1990)116:1(52).
    • (1990) J. Water Resour. Plann. Manage. , vol.116 , Issue.1 , pp. 52-70
    • Tejada-Guibert, J.A.1    Stedinger, J.R.2    Staschus, K.3
  • 28
    • 0019728413 scopus 로고
    • Optimal short-term hydro scheduling from the principle of progressive optimality
    • WRERAQ, 0043-1397, 10.1029/WR017i003p00481.
    • Turgeon A. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resour. Res. 1981, 17(3):481-486. WRERAQ, 0043-1397, 10.1029/WR017i003p00481.
    • (1981) Water Resour. Res. , vol.17 , Issue.3 , pp. 481-486
    • Turgeon, A.1
  • 29
    • 0027788414 scopus 로고
    • Reservoir-system simulation and optimization models
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1993)119:4(455).
    • Wurbs R.A. Reservoir-system simulation and optimization models. J. Water Resour. Plann. Manage. 1993, 119(4):455-472. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1993)119:4(455).
    • (1993) J. Water Resour. Plann. Manage. , vol.119 , Issue.4 , pp. 455-472
    • Wurbs, R.A.1
  • 30
    • 0032592944 scopus 로고    scopus 로고
    • Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
    • ITPSEG, 0885-8950, 10.1109/59.780941.
    • Xi E. Guan X. Li R. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs. IEEE Trans. Power Syst. 1999, 14(3):1127-1132. ITPSEG, 0885-8950, 10.1109/59.780941.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1127-1132
    • Xi, E.1    Guan, X.2    Li, R.3
  • 31
    • 0022268780 scopus 로고
    • Reservoir management and operations models: A state-of-the-art review
    • WRERAQ, 0043-1397, 10.1029/WR021i012p01797.
    • Yeh W.W.-G. Reservoir management and operations models: state-of-the-art review. Water Resour. Res. 1985, 21(12):1797-1818. WRERAQ, 0043-1397, 10.1029/WR021i012p01797.
    • (1985) Water Resour. Res. , vol.21 , Issue.12 , pp. 1797-1818
    • Yeh, W.W.-G.1
  • 32
    • 0141744797 scopus 로고    scopus 로고
    • Dynamic optimal unit commitment and loading in hydropower systems
    • JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
    • Yi J. Labadie J.W. Stitt S. Dynamic optimal unit commitment and loading in hydropower systems. J. Water Resour. Plann. Manage. 2003, 129(5):388-398. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
    • (2003) J. Water Resour. Plann. Manage. , vol.129 , Issue.5 , pp. 388-398
    • Yi, J.1    Labadie, J.W.2    Stitt, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.