메뉴 건너뛰기




Volumn 29, Issue 1, 2014, Pages 251-258

Reserve requirements to efficiently manage intra-zonal congestion

Author keywords

Congestion management; operating reserve; optimization; power system economics; power system reliability; power system security; reserve requirements; unit commitment

Indexed keywords

CONGESTION MANAGEMENT; OPERATING RESERVE; POWER SYSTEM ECONOMICS; POWER SYSTEM RELIABILITY; POWER SYSTEM SECURITY; RESERVE REQUIREMENTS; UNIT COMMITMENT;

EID: 84891557900     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2278537     Document Type: Article
Times cited : (40)

References (50)
  • 2
    • 0003803257 scopus 로고    scopus 로고
    • Available Transfer Capability Definitions and Determination, NERC
    • Jun.
    • R.M.Maliszewski et al., Available Transfer Capability Definitions and Determination, NERC, Tech. Rep., Jun. 1996.
    • (1996) Tech. Rep.
    • Maliszewski, R.M.1
  • 3
    • 43849085621 scopus 로고    scopus 로고
    • Contingency-based zonal reserve modeling and pricing in a co-optimized energy and reserve market
    • DOI 10.1109/TPWRS.2008.919314
    • T. Zheng and E. Litvinov, "Contingency-based zonal reserve modeling and pricing in a co-optimized energy and reserve market," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 277-286, May 2008. (Pubitemid 351695805)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 277-286
    • Zheng, T.1    Litvinov, E.2
  • 4
    • 18944370075 scopus 로고    scopus 로고
    • Energy and reserve pricing in security and network-constrained electricity markets
    • DOI 10.1109/TPWRS.2005.846221
    • J. M. Arroyo and F. D. Galiana, "Energy and reserve pricing in security and network-constrained electricity markets," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 634-643, May 2005. (Pubitemid 40699690)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 634-643
    • Arroyo, J.M.1    Galiana, F.D.2
  • 5
    • 27744435546 scopus 로고    scopus 로고
    • Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves
    • Nov.
    • F. D. Galiana, F. Bouffard, J.M. Arroyo, and J. F. Restrepo, "Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves," Proc. IEEE, vol. 93, no. 11, pp. 1970-1983, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 1970-1983
    • Galiana, F.D.1    Bouffard, F.2    Arroyo, J.M.3    Restrepo, J.F.4
  • 6
    • 28244483147 scopus 로고    scopus 로고
    • Market-clearing with stochastic security-Part I: Formulation
    • Nov.
    • F. Bouffard, F. D. Galiana, and A. J. Conejo, "Market-clearing with stochastic security-Part I: Formulation," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1818-1826, Nov. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.4 , pp. 1818-1826
    • Bouffard, F.1    Galiana, F.D.2    Conejo, A.J.3
  • 7
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • DOI 10.1109/TPWRS.2007.894843
    • L. Wu, M. Shahidehpour, and T. Li, "Stochastic security-constrained unit commitment," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 800-811, May 2007. (Pubitemid 46746244)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 8
    • 49249086942 scopus 로고    scopus 로고
    • Cost of reliability analysis based on stochastic unit commitment
    • Aug.
    • L. Wu, M. Shahidehpour, and T. Li, "Cost of reliability analysis based on stochastic unit commitment," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1364-1374, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1364-1374
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 9
    • 77951667443 scopus 로고    scopus 로고
    • Co-optimization of generation unit commitment and transmission switching with N-1 reliability
    • May
    • K. W. Hedman, M. C. Ferris, R. P. O'Neill, E. B. Fisher, and S. S. Oren, "Co-optimization of generation unit commitment and transmission switching with N-1 reliability," IEEE Trans. Power Syst., vol. 25, no. 2, pp. 1052-1063, May 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.2 , pp. 1052-1063
    • Hedman, K.W.1    Ferris, M.C.2    O'Neill, R.P.3    Fisher, E.B.4    Oren, S.S.5
  • 10
    • 79960889507 scopus 로고    scopus 로고
    • Differential evolution algorithm for security-constrained energy and reserve optimization considering credible contingencies
    • Aug.
    • H.A.Hejazi, H. R. Mohabati, S.H.Hosseinian, andM. Abedi, "Differential evolution algorithm for security-constrained energy and reserve optimization considering credible contingencies," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1145-1155, Aug. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.3 , pp. 1145-1155
    • Hejazi, H.A.1    Mohabati, H.R.2    Hosseinian, S.H.3    Abedi, M.4
  • 11
    • 84863393058 scopus 로고    scopus 로고
    • Theory and applications of robust optimization
    • Aug.
    • D. Bertsimas, D. B. Brown, and C. Caramanis, "Theory and applications of robust optimization," SIAM Rev., vol. 53, no. 3, pp. 464-501, Aug. 2011.
    • (2011) SIAM Rev. , vol.53 , Issue.3 , pp. 464-501
    • Bertsimas, D.1    Brown, D.B.2    Caramanis, C.3
  • 12
    • 79960893303 scopus 로고    scopus 로고
    • Contingency-constrained unit commitment with N-k security criterion: A robust optimization approach
    • Aug.
    • A. Street, F. Oliveira, and J. M. Arroyo, "Contingency-constrained unit commitment with N-k security criterion: A robust optimization approach," IEEE Trans. Power Syst., vol. 26, no. 3, pp. 1581-1590, Aug. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.3 , pp. 1581-1590
    • Street, A.1    Oliveira, F.2    Arroyo, J.M.3
  • 14
    • 84870536349 scopus 로고    scopus 로고
    • Reserve zone determination based on statistical clustering methods
    • Sep.
    • F. Wang and K. W. Hedman, "Reserve zone determination based on statistical clustering methods," in Proc. North Amer. Power Symp., Sep. 2012, pp. 1-6.
    • (2012) Proc. North Amer. Power Symp. , pp. 1-6
    • Wang, F.1    Hedman, K.W.2
  • 19
    • 84891555687 scopus 로고    scopus 로고
    • MISO Jan. [Online]. Available:
    • MISO, Spinning Reserve Demand Curve Construct, Jan. 2012. [Online]. Available: https://www.misoenergy.org/Library/Repository/Meeting%20Material/ Stakeholder/MSC/2012/20120106/20120106%20MSC%20Item%2006c%20Spinning%20Reserve% 20Demand%20Curve%20Proposal.pdf
    • (2012) Spinning Reserve Demand Curve Construct
  • 24
    • 84891557601 scopus 로고    scopus 로고
    • PJM [Online]. Available:
    • PJM, Reserve Requirements in pjm, 2012. [Online]. Available: http://www.pjm.com/~/media/committees-groups/subcommittees/sos/20120301/ 20120301-item-06b-primary-reserves.ashx
    • (2012) Reserve Requirements in Pjm
  • 25
    • 15944370945 scopus 로고    scopus 로고
    • Transitioning the California market from a zonal to a nodal framework: An operational perspective
    • 2004 IEEE PES Power Systems Conference and Exposition
    • Z. Alaywan, T.Wu, and A. D. Papalexopoulos, "Transitioning the California market from a zonal to a nodal framework: An operational perspective," in Proc. IEEE Power Syst. Conf. Expo., Oct. 2004, vol. 2, pp. 862-867. (Pubitemid 40442582)
    • (2004) 2004 IEEE PES Power Systems Conference and Exposition , vol.2 , pp. 862-867
    • Alaywan, Z.1    Wu, T.2    Papalexopoulos, A.D.3
  • 26
    • 82855177841 scopus 로고    scopus 로고
    • ERCOT electricity market: Transition from zonal to nodal market operation
    • Jul.
    • H. Daneshi and A. K. Srivastava, "ERCOT electricity market: Transition from zonal to nodal market operation," in Proc. IEEE PES General Meeting, Jul. 2011, pp. 1-7.
    • (2011) Proc. IEEE PES General Meeting , pp. 1-7
    • Daneshi, H.1    Srivastava, A.K.2
  • 29
    • 0030149334 scopus 로고    scopus 로고
    • Power system scheduling with fuzzy reserve requirements
    • X. Guan, P. B. Luh, and B. Prasannan, "Power system scheduling with fuzzy reserve requirements," IEEE Trans. Power Syst., vol. 11, no. 2, pp. 864-869, May 1996. (Pubitemid 126781228)
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.2 , pp. 864-869
    • Guan, X.1
  • 30
    • 0033079388 scopus 로고    scopus 로고
    • Price-based adaptive spinning reserve requirements in power system scheduling
    • May
    • C.-L. Tseng, S. S. Oren,A. J. Svoboda, and R. B. Johnson, "Price-based adaptive spinning reserve requirements in power system scheduling," Elect. Power Energy Syst., vol. 21, pp. 137-145, May 1999.
    • (1999) Elect. Power Energy Syst. , vol.21 , pp. 137-145
    • Tseng, C.-L.1    Oren, S.S.2    Svoboda, A.J.3    Johnson, R.B.4
  • 31
    • 0035248562 scopus 로고    scopus 로고
    • Reliability and reserve in competitive electricity market scheduling
    • DOI 10.1109/59.910784, PII S0885895001023094
    • M. Flynn, P. Sheridan, J. D. Dillan, and M. J. O'Malley, "Reliability and reserve in competitive electricity market scheduling," IEEE Trans. Power Syst., vol. 16, no. 1, pp. 78-87, Feb. 2001. (Pubitemid 32297472)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.1 , pp. 78-87
    • Flynn, M.1    Sheridan, W.P.2    Dillon, J.D.3    O'Malley, M.J.4
  • 33
    • 0032652412 scopus 로고    scopus 로고
    • Optimal scheduling of spinning reserve with ramp constraints
    • Jan.
    • H. Wu and H. B. Gooi, "Optimal scheduling of spinning reserve with ramp constraints," in Proc. IEEE PES Winter Meeting, Jan. 1999, vol. 2, pp. 785-790.
    • (1999) Proc. IEEE PES Winter Meeting , vol.2 , pp. 785-790
    • Wu, H.1    Gooi, H.B.2
  • 35
    • 60149109045 scopus 로고    scopus 로고
    • Unit commitment with probabilistic spinning reserve and interruptible load considerations
    • Feb.
    • F. Aminifar, M. Fotuhi-Firuzabad, and M. Shahidehpour, "Unit commitment with probabilistic spinning reserve and interruptible load considerations," IEEE Trans. Power Syst., vol. 24, no. 1, pp. 388-397, Feb. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.1 , pp. 388-397
    • Aminifar, F.1    Fotuhi-Firuzabad, M.2    Shahidehpour, M.3
  • 36
    • 0026188007 scopus 로고
    • Power system economic loading with flexible emergency reserve provision
    • K. M. Radi and B. Fox, "Power system economic loading with flexible emergency reserve provision," Proc. Inst. Elect. Eng. C, vol. 138, no. 4, pp. 257-262, Jul. 1991. (Pubitemid 21680647)
    • (1991) IEE Proceedings C: Generation Transmission and Distribution , vol.138 , Issue.4 , pp. 257-262
    • Radi, K.M.1    Fox, B.2
  • 37
    • 33747625657 scopus 로고    scopus 로고
    • A probabilistic reserve market incorporating interruptible load
    • DOI 10.1109/TPWRS.2006.879295
    • J. Bai, H. B. Gooi, L. M. Xia, G. Strbac, and B. Venkatesh, "A probabilistic reserve market incorporating interruptible load," IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1079-1087, Aug. 2006. (Pubitemid 44263498)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.3 , pp. 1079-1087
    • Bai, J.1    Gooi, H.B.2    Xia, L.M.3    Strbac, G.4    Venkatesh, B.5
  • 38
    • 0018032040 scopus 로고
    • Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination
    • Nov.
    • T. S. Dillon, K. W. Edwin, H. D. Kochs, and R. J. Taud, "Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination," IEEE Trans. Power App. Syst., vol. PAS-97, no. 6, pp. 2154-2166, Nov. 1978.
    • (1978) IEEE Trans. Power App. Syst., Vol. PAS-97 , Issue.6 , pp. 2154-2166
    • Dillon, T.S.1    Edwin, K.W.2    Kochs, H.D.3    Taud, R.J.4
  • 39
    • 0032656402 scopus 로고    scopus 로고
    • A new methodology for the provision of reserve in an isolated power system
    • May
    • J. W. O'Sullivan and M. J. O'Malley, "A new methodology for the provision of reserve in an isolated power system," IEEE Trans. Power Syst., vol. 14, no. 2, pp. 519-524, May 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.2 , pp. 519-524
    • O'Sullivan, J.W.1    O'Malley, M.J.2
  • 40
    • 18944399007 scopus 로고    scopus 로고
    • A probabilistic reserve with zero-sum settlement scheme
    • DOI 10.1109/TPWRS.2005.846090
    • L. M. Xia, H. B. Gooi, and J. Bai, "A probabilistic reserve with zero-sum settlement scheme," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 993-1000, May 2005. (Pubitemid 40699731)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 993-1000
    • Xia, L.M.1    Gooi, H.B.2    Bai, J.3
  • 41
    • 33947366923 scopus 로고    scopus 로고
    • Optimizing the spinning reserve requirements using a cost/benefit analysis
    • DOI 10.1109/TPWRS.2006.888951
    • M. A. Ortega-Vazquez and D. Kirschen, "Optimizing the spinning reserve requirements using a cost/benet analysis," IEEE Trans. Power Syst., vol. 22, no. 1, pp. 24-33, Feb. 2007. (Pubitemid 46442138)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.1 , pp. 24-33
    • Ortega-Vazquez, M.A.1    Kirschen, D.S.2
  • 42
    • 43849098899 scopus 로고    scopus 로고
    • Economic consequences of alternative solution methods for centralized unit commitment in day-ahead electricity markets
    • DOI 10.1109/TPWRS.2008.919246
    • R. Sioshansi, R. O'Neill, and S. S. Oren, "Economic consequences of alternative solution methods for centralized unit commitment in dayahead electricity markets," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 344-352, May 2008. (Pubitemid 351695812)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 344-352
    • Sioshansi, R.1    O'Neill, R.2    Oren, S.S.3
  • 43
    • 60149097823 scopus 로고    scopus 로고
    • Power systemrisk assessment and control in a multiobjective framework
    • Feb.
    • F. Xiao and J. D.McCalley, "Power systemrisk assessment and control in a multiobjective framework," IEEE Trans. Power Syst., vol. 24, no. 1, pp. 78-85, Feb. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.1 , pp. 78-85
    • Xiao, F.1    McCalley, J.D.2
  • 45
    • 2542549656 scopus 로고    scopus 로고
    • Role of distribution factors in congestion revenue rights applications
    • May
    • M. Liu and G. Gross, "Role of distribution factors in congestion revenue rights applications," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 802-810, May 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.2 , pp. 802-810
    • Liu, M.1    Gross, G.2
  • 46
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system-1996
    • Aug.
    • C. Grigg et al., "The IEEE reliability test system-1996," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1010-1020
    • Grigg, C.1
  • 47
    • 84855772737 scopus 로고    scopus 로고
    • Power systems test case archives
    • Univ. Washington [Online]. Available:
    • Power Systems Test Case Archives, Dept. Elect. Eng., Univ. Washington, 1999. [Online]. Available: http://www.ee.washington.edu/research/
    • (1999) Dept. Elect. Eng.
  • 49
    • 0036699870 scopus 로고    scopus 로고
    • Network-constrained multiperiod auction for a pool-based electricity market
    • DOI 10.1109/TPWRS.2002.800909, PII 1011092002800909
    • A. L. Motto, F. D. Galiana, A. J. Conejo, and J. M. Arroyo, "Networkconstrained multiperiod auction for a pool-based electricity market," IEEE Trans. Power Syst., vol. 17, no. 3, pp. 646-653, Aug. 2002. (Pubitemid 35151738)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.3 , pp. 646-653
    • Motto, A.L.1    Galiana, F.D.2    Conejo, A.J.3    Arroyo, J.M.4
  • 50
    • 0003084959 scopus 로고
    • How should relative changes be measured?
    • Feb.
    • L. Törnqvist, P. Vartia, and Y. O. Vartia, "How should relative changes be measured?," Amer. Statist., vol. 39, no. 1, pp. 43-46, Feb. 1985.
    • (1985) Amer. Statist. , vol.39 , Issue.1 , pp. 43-46
    • Törnqvist, L.1    Vartia, P.2    Vartia, Y.O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.