-
1
-
-
0003726276
-
-
1996.
-
A. J. Wood and B. F. Wollenberg, Power Generation, Operation and Control, Wiley Interseience, second édition, 1996.
-
Power Generation, Operation and Control, Wiley Interseience, Second Édition
-
-
Wood, A.J.1
Wollenberg, B.F.2
-
2
-
-
84937657196
-
-
Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New JerseyMaryland interconnection, vol. PAS-82, pp. 720-735, 1963.
-
L.T. Amstine et al, "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New JerseyMaryland interconnection", IEEE Trans Power, Apparatus und .Systems, vol. PAS-82, pp. 720-735,1963.
-
IEEE Trans Power, Apparatus Und .Systems
-
-
Amstine, L.T.1
-
4
-
-
0020750196
-
-
A new method for unit commitment at Electricité de France, vol. PAS-102, no. 5, pp. 1218-1225,1983.
-
A. Merlin and P. Sandrin, "A new method for unit commitment at Electricité de France", IEEE Trans, on Power, Apparatus and Systems, vol. PAS-102, no. 5, pp. 1218-1225,1983.
-
IEEE Trans, on Power, Apparatus and Systems
-
-
Merlin, A.1
Sandrin, P.2
-
5
-
-
0029356616
-
-
Short-term generation scheduling with transmission and enviorninemai constraints using an augmented Lagrangian relaxation, vol. 10, no. 3, pp. 1294-1301,1995.
-
S.J. Wang, S.M. Shahidchpour, D.S. Kirschen, S. Mokhtari, and G.D. Irisam, "Short-term generation scheduling with transmission and enviorninemai constraints using an augmented Lagrangian relaxation", IEEE Trims, on Power Systems, vol. 10, no. 3, pp. 1294-1301,1995.
-
IEEE Trims, on Power Systems
-
-
Wang, S.J.1
Shahidchpour, S.M.2
Kirschen, D.S.3
Mokhtari, S.4
Irisam, G.D.5
-
6
-
-
0026868615
-
-
A scheduling model for the daily operation of an electric power system, vol. 16, no. 5, pp. 226-244, 1992.
-
S. M. Shahidehpour and S. K. Tong, "A scheduling model for the daily operation of an electric power system", Applied Mathematical Modelling, vol. 16, no. 5, pp. 226-244, 1992.
-
Applied Mathematical Modelling
-
-
Shahidehpour, S.M.1
Tong, S.K.2
-
7
-
-
0029252684
-
-
The generalized unit commitment problem, vol. 10, no. 1, pp. 465-475, 1995.
-
R. Baldick, "The generalized unit commitment problem", IKEE D-aas. on Power Systems, vol. 10, no. 1, pp. 465-475,1995.
-
IKEE D-aas. on Power Systems
-
-
Baldick, R.1
-
8
-
-
33748025160
-
-
Optimization techniques-unit commitment. Final report summary, 1997
-
CIGRÉ Task Force 38-04-01, "Optimization techniques-unit commitment. Final report summary", Tech. Rep., CIGRÉ, 3-5 Rue de Metz. Paris, Sept, 1997,
-
Tech. Rep., CIGRÉ, 3-5 Rue De Metz. Paris, Sept
-
-
-
9
-
-
0031366011
-
-
Embedding deterministic considerations into the probabilistic evaluation of electric power systems, 1997.
-
R. Billinton, M. Fotuhi-Firuzabad, and S. Aboreshaid, "Embedding deterministic considerations into the probabilistic evaluation of electric power systems", Proc. 32nd Universities Power Engineering Conférence., Manchester, UK, pp. 85-88, September 10- ! 2 1997.
-
Proc. 32nd Universities Power Engineering Conférence., Manchester, UK, Pp. 85-88, September 10- ! 2
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
Aboreshaid, S.3
-
10
-
-
0024681261
-
-
Customer cost of electric service interruptions, vol. 77, no. 6, pp. 919-930, 1989.
-
G. Wacker and R. Billinton, "Customer cost of electric service interruptions", Pmc. IEEE, vol. 77, no. 6, pp. 919-930, 1989.
-
Pmc. IEEE
-
-
Wacker, G.1
Billinton, R.2
-
11
-
-
0030109655
-
-
Evaluation of reliability worth and value of lost load, vol. 143, no. 2, pp. 171-180, 1996.
-
K..K. Kariuki and R.N. Allan, "Evaluation of reliability worth and value of lost load", lEEPmc. on Gen., Tran. andDist., vol. 143, no. 2, pp. 171-180, 1996.
-
LEEPmc. on Gen., Tran. AndDist.
-
-
Kariuki, K.K.1
Allan, R.N.2
-
12
-
-
0025519705
-
-
A review of recent advances in economic dispatch, vol. 5, no. 4, pp. 1248-1259,1990.
-
B.H. Chowdbury and S, Rahman, "A review of recent advances in economic dispatch", IEEE Trans, un Power Systems, vol. 5, no. 4, pp. 1248-1259,1990.
-
IEEE Trans, Un Power Systems
-
-
Chowdbury, B.H.1
Rahman, S.2
-
13
-
-
0027647348
-
-
Effects of ramp-rate limits on unit commitment and economic dispatch, vol. 8, no. 3, pp. 1341-1350, 1993.
-
C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic dispatch", IEEE Trans, fin Power Systems, vol. 8, no. 3, pp. 1341-1350, 1993.
-
IEEE Trans, Fin Power Systems
-
-
Wang, C.1
Shahidehpour, S.M.2
-
14
-
-
0026154803
-
-
Heuristic multi-area unit commitment with economic dispatch, vol. 138, no. 3, pp. 242-252, 1991.
-
Z. OnvangandS.M. Shahidehpour, "Heuristic multi-area unit commitment with economic dispatch", IEE Pruc. Part C, vol. 138, no. 3, pp. 242-252, 1991.
-
IEE Pruc. Part C
-
-
Onvangand, Z.1
Shahidehpour, S.M.2
-
15
-
-
0018544097
-
-
IEEE reliability test system, vol. PAS-98, no. 6, pp. 2047-2054,1979.
-
IEEE RTS Task Force, "IEEE reliability test system", IEEE Trans on Power, Apparatus and Systems, vol. PAS-98, no. 6, pp. 2047-2054,1979.
-
IEEE Trans on Power, Apparatus and Systems
-
-
Force, I.R.1
-
16
-
-
0022807554
-
-
The IEEE reliability test system-extensions to and evaluation of the generating system, vol. I, no. 4, pp. 1-7, 1986.
-
R. N. Allan, R. Billintoii, and N. M. K. Abdel-Gawad, "The IEEE reliability test system-extensions to and evaluation of the generating system", IEEE Trans an Power Systems, vol. I, no. 4, pp. 1-7, 1986.
-
IEEE Trans an Power Systems
-
-
Allan, R.N.1
Billintoii, R.2
Abdel-Gawad, N.M.K.3
|