메뉴 건너뛰기




Volumn 26, Issue 3, 2011, Pages 1581-1590

Contingency-constrained unit commitment with n-K security criterion: A robust optimization approach

Author keywords

Bilevel programming; contingency constrained unit commitment; n K security criterion; robust optimization; umbrella contingency

Indexed keywords

BI-LEVEL PROGRAMMING; ROBUST OPTIMIZATION; SECURITY CRITERION; UMBRELLA CONTINGENCY; UNIT COMMITMENTS;

EID: 79960893303     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2087367     Document Type: Article
Times cited : (222)

References (30)
  • 4
    • 36348941912 scopus 로고    scopus 로고
    • Value-based transmission expansion planning of hydrothermal systems under uncertainty
    • DOI 10.1109/TPWRS.2007.907161
    • G. C. Oliveira, S. Binato, and M. V. F. Pereira, "Value-based transmission expansion planning of hydrothermal systems under uncertainty," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1429-1435, Nov. 2007. (Pubitemid 350141943)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1429-1435
    • Oliveira, G.C.1    Binato, S.2    Pereira, M.V.F.3
  • 5
    • 36349016181 scopus 로고    scopus 로고
    • Vulnerability-constrained transmission expansion planning: A stochastic programming approach
    • DOI 10.1109/TPWRS.2007.907139
    • M. Carrión, J. M. Arroyo, and N. Alguacil, "Vulnerability- constrained transmission expansion planning: A stochastic programming approach," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1436-1445, Nov. 2007. (Pubitemid 350141944)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1436-1445
    • Carrion, M.1    Arroyo, J.M.2    Alguacil, N.3
  • 6
    • 36348941884 scopus 로고    scopus 로고
    • Transmission expansion planning using contingency criteria
    • DOI 10.1109/TPWRS.2007.908478
    • J. Choi, T. D. Mount, and R. J. Thomas, "Transmission expansion planning using contingency criteria," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 2249-2261, Nov. 2007. (Pubitemid 350142027)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2249-2261
    • Choi, J.1    Mount, T.D.2    Thomas, R.J.3
  • 7
    • 69749123333 scopus 로고    scopus 로고
    • Transmission network expansion planning under deliberate outages
    • Oct
    • N. Alguacil, M. Carrión, and J. M. Arroyo, "Transmission network expansion planning under deliberate outages," Int. J. Elect. Power Energy Syst., vol. 31, no. 9, pp. 553-561, Oct. 2009.
    • (2009) Int. J. Elect. Power Energy Syst. , vol.31 , Issue.9 , pp. 553-561
    • Alguacil, N.1    Carrión, M.2    Arroyo, J.M.3
  • 8
    • 77953342320 scopus 로고    scopus 로고
    • Bilevel programming applied to power system vulnerability analysis under multiple contingencies
    • Feb
    • J. M. Arroyo, "Bilevel programming applied to power system vulnerability analysis under multiple contingencies," IET Gen. Transm. Distrib., vol. 4, no. 2, pp. 178-190, Feb. 2010.
    • (2010) IET Gen. Transm. Distrib. , vol.4 , Issue.2 , pp. 178-190
    • Arroyo, J.M.1
  • 10
    • 18944370075 scopus 로고    scopus 로고
    • Energy and reserve pricing in security and network-constrained electricity markets
    • DOI 10.1109/TPWRS.2005.846221
    • J. M. Arroyo and F. D. Galiana, "Energy and reserve pricing in security and network-constrained electricity markets," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 634-643, May 2005. (Pubitemid 40699690)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 634-643
    • Arroyo, J.M.1    Galiana, F.D.2
  • 11
    • 27744435546 scopus 로고    scopus 로고
    • Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves
    • Nov
    • F. D. Galiana, F. Bouffard, J. M. Arroyo, and J. F. Restrepo, "Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves," Proc. IEEE, vol. 93, no. 11, pp. 1970-1983, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 1970-1983
    • Galiana, F.D.1    Bouffard, F.2    Arroyo, J.M.3    Restrepo, J.F.4
  • 12
    • 0033080123 scopus 로고    scopus 로고
    • Optimal dispatch of a system based on offers and bids-A mixed integer LP formulation
    • Feb
    • N. S. Rau, "Optimal dispatch of a system based on offers and bids-A mixed integer LP formulation," IEEE Trans. Power Syst., vol. 14, no. 1, pp. 274-279, Feb. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 274-279
    • Rau, N.S.1
  • 13
    • 27744451561 scopus 로고    scopus 로고
    • Impact of security on power systems operation
    • DOI 10.1109/JPROC.2005.857490
    • M. Shahidehpour, W. F. Tinney, and Y. Fu, "Impact of security on power systems operation," Proc. IEEE, vol. 93, no. 11, pp. 2013-2025, Nov. 2005. (Pubitemid 41619238)
    • (2005) Proceedings of the IEEE , vol.93 , Issue.11 , pp. 2013-2025
    • Shahidehpour, M.1    Tinney, W.F.2    Fu, Y.3
  • 14
    • 0344395565 scopus 로고    scopus 로고
    • Demand-side reserve offers in joint energy/reserve electricity markets
    • Nov
    • J. Wang, N. E. Redondo, and F. D. Galiana, "Demand-side reserve offers in joint energy/reserve electricity markets," IEEE Trans. Power Syst., vol. 18, no. 4, pp. 1300-1306, Nov. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.4 , pp. 1300-1306
    • Wang, J.1    Redondo, N.E.2    Galiana, F.D.3
  • 16
    • 68349141640 scopus 로고    scopus 로고
    • Contingency-constrained reserve requirements in joint energy and ancillary services auction
    • Aug
    • J. Wang, M. Shahidehpour, and Z. Li, "Contingency-constrained reserve requirements in joint energy and ancillary services auction," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1457-1468, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1457-1468
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3
  • 17
    • 68349157710 scopus 로고    scopus 로고
    • Optimal transmission switching with contingency analysis
    • Aug
    • K. W. Hedman, R. P. O'Neill, E. B. Fisher, and S. S. Oren, "Optimal transmission switching with contingency analysis," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1577-1586, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1577-1586
    • Hedman, K.W.1    O'Neill, R.P.2    Fisher, E.B.3    Oren, S.S.4
  • 18
    • 77951667443 scopus 로고    scopus 로고
    • Co-optimization of generation unit commitment and transmission switching with n-1 reliability
    • May
    • K. W. Hedman, M. C. Ferris, R. P. O'Neill, E. B. Fisher, and S. S. Oren, "Co-optimization of generation unit commitment and transmission switching with n-1 reliability," IEEE Trans. Power Syst., vol. 25, no. 2, pp. 1052-1063, May 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.2 , pp. 1052-1063
    • Hedman, K.W.1    Ferris, M.C.2    O'Neill, R.P.3    Fisher, E.B.4    Oren, S.S.5
  • 19
    • 33747623533 scopus 로고    scopus 로고
    • A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem
    • DOI 10.1109/TPWRS.2006.876672
    • M. Carrión and J. M. Arroyo, "A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem," IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1371-1378, Aug. 2006. (Pubitemid 44263531)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.3 , pp. 1371-1378
    • Carrion, M.1    Arroyo, J.M.2
  • 20
    • 0010680207 scopus 로고
    • Convex programming with set-inclusive constraints and applications to inexact linear programming
    • Sep. -Oct
    • A. L. Soyster, "Convex programming with set-inclusive constraints and applications to inexact linear programming," Oper. Res., vol. 21, no. 5, pp. 1154-1157, Sep.-Oct. 1973.
    • (1973) Oper. Res. , vol.21 , Issue.5 , pp. 1154-1157
    • Soyster, A.L.1
  • 22
    • 0141712989 scopus 로고    scopus 로고
    • Robust optimization-Methodology and applications
    • May
    • A. Ben-Tal and A. Nemirovski, "Robust optimization-Methodology and applications," Math. Program., vol. 92, no. 3, pp. 453-480, May 2002.
    • (2002) Math. Program. , vol.92 , Issue.3 , pp. 453-480
    • Ben-Tal, A.1    Nemirovski, A.2
  • 23
    • 3042762207 scopus 로고    scopus 로고
    • The price of robustness
    • DOI 10.1287/opre.1030.0065
    • D. Bertsimas and M. Sim, "The price of robustness," Oper. Res., vol. 52, no. 1, pp. 35-53, Jan.-Feb. 2004. (Pubitemid 40000812)
    • (2004) Operations Research , vol.52 , Issue.1 , pp. 35-53
    • Bertsimas, D.1    Sim, M.2
  • 24
    • 84870613023 scopus 로고    scopus 로고
    • Robust discrete optimization and network flows
    • Sep
    • D. Bertsimas and M. Sim, "Robust discrete optimization and network flows," Math. Program., vol. 98, no. 1-3, pp. 49-71, Sep. 2003.
    • (2003) Math. Program. , vol.98 , Issue.1-3 , pp. 49-71
    • Bertsimas, D.1    Sim, M.2
  • 25
    • 21044451907 scopus 로고    scopus 로고
    • On robust optimization of two-stage systems
    • DOI 10.1007/s10107-003-0373-y
    • S. Takriti and S. Ahmed, "On robust optimization of two-stage systems," Math. Program., vol. 99, no. 1, pp. 109-126, Jan. 2004. (Pubitemid 40871734)
    • (2004) Mathematical Programming , vol.99 , Issue.1 , pp. 109-126
    • Takriti, S.1    Ahmed, S.2
  • 28
    • 79960893740 scopus 로고    scopus 로고
    • [Online]. Available
    • Xpress Optimization Suite. [Online]. Available: http://www.fico.com/.
    • Xpress Optimization Suite


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.