-
1
-
-
84863844286
-
A polynomial algorithm for computing elementary siphons in a class of Petri nets
-
H. Liu, K. Xing, F. Wang, L. Han, and X. Sun A polynomial algorithm for computing elementary siphons in a class of Petri nets Asian J Control 14 4 2012 1141 1149
-
(2012)
Asian J Control
, vol.14
, Issue.4
, pp. 1141-1149
-
-
Liu, H.1
Xing, K.2
Wang, F.3
Han, L.4
Sun, X.5
-
2
-
-
84855294331
-
Research of improved hybrid quantum algorithm in job shop scheduling problems
-
J. Fu, C. Ye, J. Xie, and W. Zhao Research of improved hybrid quantum algorithm in job shop scheduling problems Comput Eng Appl 2009 48 52
-
(2009)
Comput Eng Appl
, pp. 48-52
-
-
Fu, J.1
Ye, C.2
Xie, J.3
Zhao, W.4
-
3
-
-
84855266801
-
Hybrid algorithm of particle swarm optimization and stimulated annealing for job-shop scheduling
-
B. Cai, F. Mao, L. Fu, and S-h. Yang Hybrid algorithm of particle swarm optimization and stimulated annealing for job-shop scheduling Appl Res Comput 2010 856 859
-
(2010)
Appl Res Comput
, pp. 856-859
-
-
Cai, B.1
Mao, F.2
Fu, L.3
Yang, S.-H.4
-
4
-
-
0035309164
-
Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling
-
DOI 10.1016/S0360-8352(01)00010-9, PII S0360835201000109
-
H.B. Yu, and W. Liang Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling Comput Ind Eng 39 3-4 2001 337 356 (Pubitemid 32380886)
-
(2001)
Computers and Industrial Engineering
, vol.39
, Issue.3-4
, pp. 337-356
-
-
Yu, H.1
Liang, W.2
-
5
-
-
0034161003
-
Dynamic scheduling of manufacturing job shops using extreme value theory
-
DOI 10.1080/095372800232324
-
G. Chryssolouris, and V. Subramaniam Dynamic scheduling of manufacturing job shops using extreme value theory Prod Plann Control 11 2 2000 122 132 (Pubitemid 35394363)
-
(2000)
Production Planning and Control
, vol.11
, Issue.2
, pp. 122-132
-
-
Chryssolouris, G.1
Subramaniam, V.2
-
6
-
-
0033131582
-
Job shop scheduling considering material handling
-
J.S. Smith, B.A. Peters, and A. Srinivasan Job shop scheduling considering material handling Int J Prod Res 37 7 1999 1541 1560
-
(1999)
Int J Prod Res
, vol.37
, Issue.7
, pp. 1541-1560
-
-
Smith, J.S.1
Peters, B.A.2
Srinivasan, A.3
-
7
-
-
34447306016
-
Assignment and scheduling in flexible job-shops by hierarchical optimization
-
DOI 10.1109/TSMCC.2007.897494
-
N. Zribi, I. Kacem, A. El Kamel, and P. Borne Assignment and scheduling in flexible job-shops by hierarchical optimization IEEE Trans Syst Man Cybern C: Appl Rev 37 Compendex 2007 652 661 (Pubitemid 47061966)
-
(2007)
IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews
, vol.37
, Issue.4
, pp. 652-661
-
-
Zribi, N.1
Kacem, I.2
El Kamel, A.3
Borne, P.4
-
8
-
-
79959441825
-
Heuristics and a hybrid meta-heuristic for a generalized job-shop scheduling problem
-
Ghedjati F. Heuristics and a hybrid meta-heuristic for a generalized job-shop scheduling problem. In: 2010 IEEE congress on evolutionary computation; 2010. p. 8-12.
-
(2010)
2010 IEEE Congress on Evolutionary Computation
, pp. 8-12
-
-
Ghedjati, F.1
-
10
-
-
48049101593
-
Hybrid framework for resource allocation among multiple agents moving on discrete environments
-
J.L. Piovesan, and C.T. Abdallah et al. Hybrid framework for resource allocation among multiple agents moving on discrete environments Asian J Control 10 2 2008 171 186
-
(2008)
Asian J Control
, vol.10
, Issue.2
, pp. 171-186
-
-
Piovesan, J.L.1
Abdallah, C.T.2
-
11
-
-
84862908723
-
Quantized tracking control fora multi-agent system with high-order leader dynamics
-
J. Hu, and G. Feng Quantized tracking control fora multi-agent system with high-order leader dynamics Asian J Control 13 6 2011 988 997
-
(2011)
Asian J Control
, vol.13
, Issue.6
, pp. 988-997
-
-
Hu, J.1
Feng, G.2
-
12
-
-
78149284909
-
A simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardiness objective
-
R. Zhang, and C. Wu A simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardiness objective Comput Oper Res 38 5 2011 854 867
-
(2011)
Comput Oper Res
, vol.38
, Issue.5
, pp. 854-867
-
-
Zhang, R.1
Wu, C.2
-
13
-
-
34047181443
-
A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem
-
DOI 10.1016/j.cor.2005.12.002, PII S0305054805003989
-
C. Zhang, P. Li, Z. Guan, and Y. Rao A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem Comput Oper Res 34 Compendex 2007 3229 3242 (Pubitemid 46517853)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.11
, pp. 3229-3242
-
-
Zhang, C.1
Li, P.2
Guan, Z.3
Rao, Y.4
-
14
-
-
4944252227
-
Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems
-
A. Baykasoglu, L. Ozbakir, and A.I. Sonmez Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems J Intell Manuf 15 6 2004 777 785
-
(2004)
J Intell Manuf
, vol.15
, Issue.6
, pp. 777-785
-
-
Baykasoglu, A.1
Ozbakir, L.2
Sonmez, A.I.3
-
15
-
-
0035124006
-
Two-objective fuzzy job shop scheduling through genetic algorithm
-
M. Sakawa, and R. Kubota Two-objective fuzzy job shop scheduling through genetic algorithm Electron Commun Jpn III: Fundam Electron Sci 84 4 2001 60 68
-
(2001)
Electron Commun Jpn III: Fundam Electron Sci
, vol.84
, Issue.4
, pp. 60-68
-
-
Sakawa, M.1
Kubota, R.2
-
16
-
-
69249206751
-
An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
-
L. De Giovanni, and F. Pezzella An improved genetic algorithm for the distributed and flexible job-shop scheduling problem Eur J Oper Res 200 2 2010 395 408
-
(2010)
Eur J Oper Res
, vol.200
, Issue.2
, pp. 395-408
-
-
De Giovanni, L.1
Pezzella, F.2
-
17
-
-
78049527141
-
A new dispatching rule based genetic algorithm for the multi-objective job shop problem
-
J.A. Vazquez-Rodriguez, and S. Petrovic A new dispatching rule based genetic algorithm for the multi-objective job shop problem J Heuristics 16 6 2010 771 793
-
(2010)
J Heuristics
, vol.16
, Issue.6
, pp. 771-793
-
-
Vazquez-Rodriguez, J.A.1
Petrovic, S.2
-
18
-
-
77958011560
-
Modular design of a hybrid genetic algorithm for a flexible job-shop scheduling problem
-
C. Gutie rrez, and I. Garci a-Magarino Modular design of a hybrid genetic algorithm for a flexible job-shop scheduling problem Knowl Based Syst 2011 102 112
-
(2011)
Knowl Based Syst
, pp. 102-112
-
-
Gutie Rrez, C.1
Garci A-Magarino, I.2
-
19
-
-
33751191658
-
A hybrid particle swarm optimization for job shop scheduling problem
-
D.Y. Sha, and C.-Y. Hsu A hybrid particle swarm optimization for job shop scheduling problem Comput Ind Eng 51 Compendex 2006 791 808
-
(2006)
Comput Ind Eng
, vol.51
, Issue.COMPENDEX
, pp. 791-808
-
-
Sha, D.Y.1
Hsu, C.-Y.2
-
21
-
-
74949126533
-
A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems
-
F. Zhao, Y. Hong, D. Yu, Y. Yang, and Q. Zhang A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems Int J Comput Integrated Manuf 23 1 2010 20 39
-
(2010)
Int J Comput Integrated Manuf
, vol.23
, Issue.1
, pp. 20-39
-
-
Zhao, F.1
Hong, Y.2
Yu, D.3
Yang, Y.4
Zhang, Q.5
-
22
-
-
70449632611
-
Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach
-
Y.W. Guo, W.D. Li, A.R. Mileham, and GW. Owen Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach Int J Prod Res 47 14 2009 3775 3796
-
(2009)
Int J Prod Res
, vol.47
, Issue.14
, pp. 3775-3796
-
-
Guo, Y.W.1
Li, W.D.2
Mileham, A.R.3
Owen, G.W.4
-
23
-
-
67349174559
-
An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
-
G. Zhang, X. Shao, P. Li, and L. Gao An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem Comput Ind Eng 56 4 2009 1309 1318
-
(2009)
Comput Ind Eng
, vol.56
, Issue.4
, pp. 1309-1318
-
-
Zhang, G.1
Shao, X.2
Li, P.3
Gao, L.4
-
24
-
-
70449642712
-
A Scatter Search approach to sequence-dependent setup times job shop scheduling
-
A. Manikas, and Y.L. Chang A Scatter Search approach to sequence-dependent setup times job shop scheduling Int J Prod Res 47 18 2009 5217 5236
-
(2009)
Int J Prod Res
, vol.47
, Issue.18
, pp. 5217-5236
-
-
Manikas, A.1
Chang, Y.L.2
-
25
-
-
77950678567
-
A Scatter Search algorithm for scheduling optimisation of job shop problems
-
M. Saravanan, and A.N. Haq A Scatter Search algorithm for scheduling optimisation of job shop problems Int J Prod Dev 2010 259 272
-
(2010)
Int J Prod Dev
, pp. 259-272
-
-
Saravanan, M.1
Haq, A.N.2
-
26
-
-
77955341259
-
An optimal maintenance policy based on generalized stochastic Petri nets and periodic inspection
-
C.-K. Chang, and C.-L. Hsiang An optimal maintenance policy based on generalized stochastic Petri nets and periodic inspection Asian J Control 12 3 2010 364 376
-
(2010)
Asian J Control
, vol.12
, Issue.3
, pp. 364-376
-
-
Chang, C.-K.1
Hsiang, C.-L.2
-
27
-
-
77955336857
-
A deadlock prevention approach for a class of timed Petri nets using elementary siphons
-
J. Guo, and Z. Li A deadlock prevention approach for a class of timed Petri nets using elementary siphons Asian J Control 12 3 2010 347 363
-
(2010)
Asian J Control
, vol.12
, Issue.3
, pp. 347-363
-
-
Guo, J.1
Li, Z.2
-
28
-
-
77955320250
-
Synthesis of deadlock prevention policy using Petri nets reachability graph technique
-
Y-S Huang, T-H Chung, and P-J. Su Synthesis of deadlock prevention policy using Petri nets reachability graph technique Asian J Control 12 3 2010 336 346
-
(2010)
Asian J Control
, vol.12
, Issue.3
, pp. 336-346
-
-
Huang, Y.-S.1
Chung, T.-H.2
Su, P.-J.3
-
29
-
-
77955326818
-
Non-blocking decentralized control of discrete event systems based on Petri nets
-
F. Lu, W. Wu, H. Su, and J. Chu Non-blocking decentralized control of discrete event systems based on Petri nets Asian J Control 12 3 2010 323 335
-
(2010)
Asian J Control
, vol.12
, Issue.3
, pp. 323-335
-
-
Lu, F.1
Wu, W.2
Su, H.3
Chu, J.4
-
30
-
-
77955311048
-
Process vs resource-oriented Petri net modeling of automated manufacturing systems
-
N. Wu, and M. Zhou Process vs resource-oriented Petri net modeling of automated manufacturing systems Asian J Control 12 3 2010 267 280
-
(2010)
Asian J Control
, vol.12
, Issue.3
, pp. 267-280
-
-
Wu, N.1
Zhou, M.2
-
31
-
-
84856267933
-
A deadlock prevention approach for flexible manufacturing systems with uncontrollable transitions in their Petri net models
-
R Zhu A deadlock prevention approach for flexible manufacturing systems with uncontrollable transitions in their Petri net models Asian J Control 14 1 2012 217 229
-
(2012)
Asian J Control
, vol.14
, Issue.1
, pp. 217-229
-
-
Zhu, R.1
-
32
-
-
36348936649
-
A memetic algorithm for the job-shop with time-lags
-
DOI 10.1016/j.cor.2006.11.007, PII S0305054806002930, Selected Papers Presented at the ECCO'04 European Conference on Combinatorial Optimization
-
A. Caumond, P. Lacomme, and N. TcherneVa A memetic algorithm for the job-shop with time-lags Comput Oper Res 35 7 2008 2331 2356 (Pubitemid 350161141)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.7
, pp. 2331-2356
-
-
Caumond, A.1
Lacomme, P.2
Tchernev, N.3
-
33
-
-
78649788124
-
A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem
-
M. Frutos, A.C. Olivera, and F. Tohme A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem Ann Oper Res 181 1 2010 745 765
-
(2010)
Ann Oper Res
, vol.181
, Issue.1
, pp. 745-765
-
-
Frutos, M.1
Olivera, A.C.2
Tohme, F.3
-
34
-
-
55349112552
-
A rule-centric memetic algorithm to minimize the number of tardy jobs in the job shop
-
T.C. Chiang, and L.C. Fu A rule-centric memetic algorithm to minimize the number of tardy jobs in the job shop Int J Prod Res 46 24 2008 6913 6931
-
(2008)
Int J Prod Res
, vol.46
, Issue.24
, pp. 6913-6931
-
-
Chiang, T.C.1
Fu, L.C.2
-
35
-
-
38349135735
-
Scheduling multi-objective job shops using a memetic algorithm based on differential evolution
-
B. Qian, L. Wang, D-X Huang, and X. Wang Scheduling multi-objective job shops using a memetic algorithm based on differential evolution Int J Adv Manuf Technol 35 9-10 2008 1014 1027
-
(2008)
Int J Adv Manuf Technol
, vol.35
, Issue.910
, pp. 1014-1027
-
-
Qian, B.1
Wang, L.2
Huang, D.-X.3
Wang, X.4
-
36
-
-
45849153497
-
Clonal selection based memetic algorithm for job shop scheduling problems
-
J-h Yang, L. Sun, H.P. Lee, Y. Qian, and Y-c. Liang Clonal selection based memetic algorithm for job shop scheduling problems J Bionic Eng 5 2 2008 111 119
-
(2008)
J Bionic Eng
, vol.5
, Issue.2
, pp. 111-119
-
-
Yang, J.-H.1
Sun, L.2
Lee, H.P.3
Qian, Y.4
Liang, Y.-C.5
-
39
-
-
78549239303
-
Job shop scheduling optimization through multiple independent particle swarms
-
G.G. Yen, and B. Ivers Job shop scheduling optimization through multiple independent particle swarms Int J Intell Comput Cybern 2 Compendex 2009 5 33
-
(2009)
Int J Intell Comput Cybern
, vol.2
, Issue.COMPENDEX
, pp. 5-33
-
-
Yen, G.G.1
Ivers, B.2
-
40
-
-
80053170670
-
Job shop optimization through multiple independent particle swarms
-
DOI 10.1109/CEC.2007.4424906, 4424906, 2007 IEEE Congress on Evolutionary Computation, CEC 2007
-
Ivers B, Yen GG. Job shop optimization through multiple independent particle swarms. In: 2007 IEEE congress on evolutionary computation (CEC 2007), September 25-28, 2007. Singapore: Inst. of Elec. and Elec. Eng. Computer Society; 2008. p. 3361-68. (Pubitemid 351371833)
-
(2008)
2007 IEEE Congress on Evolutionary Computation, CEC 2007
, pp. 3361-3368
-
-
Ivers, B.1
Yen, G.G.2
-
41
-
-
62749130222
-
New metaheuristic for the job shop scheduling problem with PSO
-
July 14-17, 2008. Las Vegas, NV: CSREA Press
-
Gomez A, Cuevas R, De La Fuente D, Parreno J, Priore P. New metaheuristic for the job shop scheduling problem with PSO. In: 2008 international conference on artificial intelligence (ICAI 2008) and 2008 international conference on machine learning, models, technologies and applications (MLMTA 2008), July 14-17, 2008. Las Vegas, NV: CSREA Press; 2008.
-
(2008)
2008 International Conference on Artificial Intelligence (ICAI 2008) and 2008 International Conference on Machine Learning, Models, Technologies and Applications (MLMTA 2008)
-
-
Gomez, A.1
Cuevas, R.2
De La Fuente, D.3
Parreno, J.4
Priore, P.5
-
42
-
-
70649097014
-
A novel particle swarm optimizer hybridized with extremal optimization
-
M-R Chen, X. Li, X. Zhang, and Y-Z. Lu A novel particle swarm optimizer hybridized with extremal optimization Appl Soft Comput 10 2 2010 367 373
-
(2010)
Appl Soft Comput
, vol.10
, Issue.2
, pp. 367-373
-
-
Chen, M.-R.1
Li, X.2
Zhang, X.3
Lu, Y.-Z.4
-
43
-
-
71749106480
-
Gaussian quantum-behaved particle swarm optimization approaches for constrained engineering design problems
-
L. Dos Santos Coelho Gaussian quantum-behaved particle swarm optimization approaches for constrained engineering design problems Expert Syst Appl 2010 1676 1683
-
(2010)
Expert Syst Appl
, pp. 1676-1683
-
-
Dos Santos Coelho, L.1
-
44
-
-
70649092078
-
Comprehensive learning particle swarm optimization for reactive power dispatch
-
K. Mahadevan, and P.S. Kannan Comprehensive learning particle swarm optimization for reactive power dispatch Appl Soft Comput 10 2 2010 641 652
-
(2010)
Appl Soft Comput
, vol.10
, Issue.2
, pp. 641-652
-
-
Mahadevan, K.1
Kannan, P.S.2
-
45
-
-
0033666935
-
Comparing inertia weights and constriction factors in particle swarm optimization
-
July 16-19, 2000. California, CA, USA: IEEE
-
Eberhart RC, Shi Y. Comparing inertia weights and constriction factors in particle swarm optimization. In: Proceedings of the 2000 congress on evolutionary computation (CEC 00), July 16-19, 2000. California, CA, USA: IEEE; 2000.
-
(2000)
Proceedings of the 2000 Congress on Evolutionary Computation (CEC 00)
-
-
Eberhart, R.C.1
Shi, Y.2
-
47
-
-
2442474238
-
Meta-Lamarckian learning in memetic algorithms
-
Y.S. Ong, and A.J. Keane Meta-Lamarckian learning in memetic algorithms IEEE Trans Evol Comput 8 2 2004 99 110
-
(2004)
IEEE Trans Evol Comput
, vol.8
, Issue.2
, pp. 99-110
-
-
Ong, Y.S.1
Keane, A.J.2
-
48
-
-
33744526968
-
A hybrid particle swarm optimization approach for the job-shop scheduling problem
-
W.J. Xia, and Z.M. Wu A hybrid particle swarm optimization approach for the job-shop scheduling problem Int J Adv Manuf Technol 29 3-4 2006 360 366
-
(2006)
Int J Adv Manuf Technol
, vol.29
, Issue.34
, pp. 360-366
-
-
Xia, W.J.1
Wu, Z.M.2
-
49
-
-
84995332281
-
A hybrid Shifting Bottleneck-tabu search heuristic for the job shop total weighted tardiness problem
-
K. Bulbul A hybrid Shifting Bottleneck-tabu search heuristic for the job shop total weighted tardiness problem Comput Oper Res 38 6 2011 967 983
-
(2011)
Comput Oper Res
, vol.38
, Issue.6
, pp. 967-983
-
-
Bulbul, K.1
-
50
-
-
78650621042
-
A computational study of a Shifting Bottleneck heuristic for multi-product complex job shops
-
L. Monch, and J. Zimmermann A computational study of a Shifting Bottleneck heuristic for multi-product complex job shops Prod Plann Control 22 1 2011 25 40
-
(2011)
Prod Plann Control
, vol.22
, Issue.1
, pp. 25-40
-
-
Monch, L.1
Zimmermann, J.2
-
51
-
-
77949802024
-
A GRASP algorithm for the Integration of Process Planning and Scheduling in a flexible job-shop
-
M. Rajkumar, P. Asokan, T. Page, and S. Arunachalam A GRASP algorithm for the Integration of Process Planning and Scheduling in a flexible job-shop Int J Manuf Res 2010 230 251
-
(2010)
Int J Manuf Res
, pp. 230-251
-
-
Rajkumar, M.1
Asokan, P.2
Page, T.3
Arunachalam, S.4
-
52
-
-
61349108680
-
A review and evaluation of multiobjective algorithms for the flowshop scheduling problem
-
G. Minella, R. Ruiz, and M. Ciavotta A review and evaluation of multiobjective algorithms for the flowshop scheduling problem INFORMS J Comput 20 3 2008 451 471
-
(2008)
INFORMS J Comput
, vol.20
, Issue.3
, pp. 451-471
-
-
Minella, G.1
Ruiz, R.2
Ciavotta, M.3
-
53
-
-
13544263208
-
A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs
-
DOI 10.1016/j.ejor.2004.07.020, PII S0377221704004771, Multicriteria Scheduling
-
T.K. Varadharajan, and C. Rajendran A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs Eur J Oper Res 167 3 2005 772 795 (Pubitemid 40220090)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 772-795
-
-
Varadharajan, T.K.1
Rajendran, C.2
-
54
-
-
13544262325
-
Genetic local search for multi-objective flowshop scheduling problems
-
DOI 10.1016/j.ejor.2004.07.017, PII S0377221704004746, Multicriteria Scheduling
-
J.E.C. Arroyo, and V.A. Armentano Genetic local search for multi-objective flowshop scheduling problems Eur J Oper Res 167 3 2005 717 738 (Pubitemid 40220087)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 717-738
-
-
Arroyo, J.E.C.1
Armentano, V.A.2
-
55
-
-
29344433807
-
A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
-
DOI 10.1007/s00170-004-2249-6
-
T. Pasupathy, C. Rajendran, and R.K. Suresh. A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs Int J Adv Manuf Technol 27 7-8 2006 804 815 (Pubitemid 43004635)
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.27
, Issue.7-8
, pp. 804-815
-
-
Pasupathy, T.1
Rajendran, C.2
Suresh, R.K.3
-
56
-
-
6944244339
-
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem
-
V.A. Armentano, and J.E.C. Arroyo An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem J Heuristics 10 5 2004 463 481
-
(2004)
J Heuristics
, vol.10
, Issue.5
, pp. 463-481
-
-
Armentano, V.A.1
Arroyo, J.E.C.2
-
57
-
-
0034199912
-
Approximating the nondominated front using the pareto archived evolution strategy
-
J. Knowles, and D.W. Corne. Approximating the nondominated front using the pareto archived evolution strategy Evol Comput 8 2 2000 149 172
-
(2000)
Evol Comput
, vol.8
, Issue.2
, pp. 149-172
-
-
Knowles, J.1
Corne, D.W.2
-
58
-
-
84947923627
-
The pareto envelope-based selection algorithm for multiobjective optimization
-
Schoenauer M, Deb K, Rudolph G, Yao X, Lutton E, Merelo Guervós Juan J, Schwefel HP, editors Springer
-
Corne DW, Knowles JD, Oates MJ. The pareto envelope-based selection algorithm for multiobjective optimization. In: Schoenauer M, Deb K, Rudolph G, Yao X, Lutton E, Merelo Guervós Juan J, Schwefel HP, editors. Parallel problem solving from nature - PPSN VI, proceedings of the 6th international conference, Paris, France, September 18-20, 2000. Lecture notes in computer science, vol. 1917. Springer; 2000. p. 839-48.
-
(2000)
Parallel Problem Solving from Nature - PPSN VI, Proceedings of the 6th International Conference, Paris, France, September 18-20, 2000. Lecture Notes in Computer Science
, vol.1917
, pp. 839-848
-
-
Corne, D.W.1
Knowles, J.D.2
Oates, M.J.3
-
59
-
-
0005871804
-
PESA-II: Region-based selection in evolutionary multiobjective optimization
-
Spector L, Goodman ED, Wu A, Langdon WB, Voigt HM, Gen M, Sen S, Dorigo M, Pezeshk S, Garzon Max H, Burke E, editors San Francisco, CA: Morgan Kaufmann
-
Corne DW, Jerram Nick R, Knowles Joshua D, Oates Martin J. PESA-II: region-based selection in evolutionary multiobjective optimization. In: Spector L, Goodman ED, Wu A, Langdon WB, Voigt HM, Gen M, Sen S, Dorigo M, Pezeshk S, Garzon Max H, Burke E, editors. Proceedings of the genetic and evolutionary computation conference (GECCO-2001). San Francisco, CA: Morgan Kaufmann; 2001. p. 283-90.
-
(2001)
Proceedings of the Genetic and Evolutionary Computation Conference (GECCO-2001)
, pp. 283-290
-
-
Corne, D.W.1
Jerram Nick, R.2
Knowles Joshua, D.3
Oates Martin, J.4
-
60
-
-
28244475963
-
Evolving better population distribution and exploration in evolutionary multi-objective optimization
-
DOI 10.1016/j.ejor.2004.08.038, PII S0377221704006198
-
K.C. Tan, C.K. Goh, Y.J. Yang, and T.H. Lee Evolving better population distribution and exploration in evolutionary multi-objective optimization Eur J Oper Res 171 2 2006 463 495 (Pubitemid 41706209)
-
(2006)
European Journal of Operational Research
, vol.171
, Issue.2
, pp. 463-495
-
-
Tan, K.C.1
Goh, C.K.2
Yang, Y.J.3
Lee, T.H.4
-
61
-
-
0020633499
-
Scheduling n jobs on one machine to minimize the maximum tardiness with minimum number tardy
-
DOI 10.1016/0305-0548(83)90018-7
-
J.G. Shanthikumar Scheduling n jobs on one machine to minimize the maximum tardiness with minimum number tardy jobs Comput Oper Res 10 3 1983 255 266 (Pubitemid 13573937)
-
(1983)
Computers and Operations Research
, vol.10
, Issue.3
, pp. 255-266
-
-
Shanthikumar, J.G.1
-
64
-
-
0022905665
-
A mixed integer goal programming formulation of the standard flow shop scheduling problem
-
W.J. Selen, and D. Hott A mixed integer goal programming formulation of the standard flow shop scheduling problem J Oper Res Soc 37 12 1986 1121 1126
-
(1986)
J Oper Res Soc
, vol.37
, Issue.12
, pp. 1121-1126
-
-
Selen, W.J.1
Hott, D.2
-
65
-
-
0026156181
-
A new heuristic for n-job, m-shop problem
-
52 1991 194 202
-
J.C. Ho, and Y.L. Chang A new heuristic for n-job, m-shop problem Eur J Oper Res 1991 194 202 52 1991 194 202
-
(1991)
Eur J Oper Res
, pp. 194-202
-
-
Ho, J.C.1
Chang, Y.L.2
-
66
-
-
0022698428
-
Scheduling with multiple performances measures: The one machine case
-
R.T. Nelson, R.K. Sarin, and R.L. Daniels Scheduling with multiple performances measures:the one machine case Manage Sci 2 1986 464 479
-
(1986)
Manage Sci
, vol.2
, pp. 464-479
-
-
Nelson, R.T.1
Sarin, R.K.2
Daniels, R.L.3
-
68
-
-
0029635352
-
Heuristic for scheduling in a flow shop with multiple objectives
-
82 1995 540 555
-
C. Rajendran Heuristic for scheduling in a flow shop with multiple objectives Eur J Oper Res 1995 540 555 82 1995 540 555
-
(1995)
Eur J Oper Res
, pp. 540-555
-
-
Rajendran, C.1
-
70
-
-
0031238029
-
Bicriteria scheduling in the two machines flow shop
-
48 1997 929 935
-
C.J. Liao, W.C. Yu, and C.B. Joe Bicriteria scheduling in the two machines flow shop J Oper Res Soc 1997 929 935 48 1997 929 935
-
(1997)
J Oper Res Soc
, pp. 929-935
-
-
Liao, C.J.1
Yu, W.C.2
Joe, C.B.3
-
71
-
-
33847245879
-
On operators and search space topology in multi-objective flow shop scheduling
-
(2007)
-
M.J. Geiger On operators and search space topology in multi-objective flow shop scheduling Eur J Oper Res 181 1 2007 195 206 (2007)
-
(2007)
Eur J Oper Res
, vol.181
, Issue.1
, pp. 195-206
-
-
Geiger, M.J.1
-
72
-
-
0037120618
-
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
-
J.M. Framinan, R. Leisten, and R. Ruiz-Usano Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation Eur J Oper Res 141 3 2002 559 569
-
(2002)
Eur J Oper Res
, vol.141
, Issue.3
, pp. 559-569
-
-
Framinan, J.M.1
Leisten, R.2
Ruiz-Usano, R.3
|