메뉴 건너뛰기




Volumn , Issue , 2009, Pages 15-21

Multiobjective job shop scheduling using memetic algorithm and shifting bottleneck procedure

Author keywords

[No Author keywords available]

Indexed keywords

DISPATCHING RULES; JOB SHOP PROBLEM; JOB SHOP SCHEDULING PROBLEMS; JOB-SHOP SCHEDULING; MAKESPAN; MEMETIC ALGORITHMS; MULTI OBJECTIVE; PARETO OPTIMAL SOLUTIONS; SHIFTING BOTTLENECK PROCEDURES; TOTAL TARDINESS;

EID: 67650482966     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SCIS.2009.4927009     Document Type: Conference Paper
Times cited : (8)

References (27)
  • 1
    • 0023977010 scopus 로고
    • SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING.
    • Adams, J., Balas, E. and Zawack, D., "The shifting bottleneck procedure for job-shop scheduling," Management Science, vol. 34, no. 3, pp. 391-401, 1988. (Pubitemid 18580052)
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams Joseph1    Balas Egon2    Zawack Daniel3
  • 2
    • 0027574649 scopus 로고
    • Modified shifting bottleneck procedure for job-shop scheduling
    • Dauzere-Peres, S. and Lasserre, J. B., "A Modified Shifting Bottleneck Procedure for Job Shop Scheduling," International Journal of Production Research, vol. 31, no. 4, pp. 923-932, 1993. (Pubitemid 23645844)
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 923-932
    • Dauzere-Peres, S.1    Lasserre, J.-B.2
  • 3
    • 0029195265 scopus 로고
    • The one machine scheduling with delayed precedence constraints
    • Balas, E., Lenstra, J. K. and Vazacopoulos, A., "The one machine scheduling with delayed precedence constraints," Management Science, vol. 41, no. 1, pp. 94-109, 1995.
    • (1995) Management Science , vol.41 , Issue.1 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 4
    • 0242269826 scopus 로고    scopus 로고
    • Measures of subproblem criticality in decomposition algorithms for shop scheduling
    • Aytug, H., Kempf, K. and Uzsoy, R., "Measures of subproblem criticality in decomposition algorithms for shop scheduling," International Journal of Production Research, vol. 41, no. 5, pp. 865-882, 2003.
    • (2003) International Journal of Production Research , vol.41 , Issue.5 , pp. 865-882
    • Aytug, H.1    Kempf, K.2    Uzsoy, R.3
  • 5
    • 0020178733 scopus 로고
    • The one-machine sequencing problem
    • Carlier, J., "The one-machine sequencing problem," European Journal of Operational Research, vol. 11, no. 1, pp. 42-47, 1982.
    • (1982) European Journal of Operational Research , vol.11 , Issue.1 , pp. 42-47
    • Carlier, J.1
  • 6
    • 33750718514 scopus 로고    scopus 로고
    • Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
    • DOI 10.1016/j.ejor.2005.12.020, PII S0377221705008532
    • Mönch, L., Schabacker, R., Pabst, D. and Fowler, J. W., "Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops," European Journal of Operational Research, vol. 177, no. 3, pp. 2100-2118, 2007. (Pubitemid 44709466)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2100-2118
    • Monch, L.1    Schabacker, R.2    Pabst, D.3    Fowler, J.W.4
  • 7
    • 0031542280 scopus 로고    scopus 로고
    • A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems
    • Demirkol, E., Mehta, S. and Uzsoy, R., "A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems," Journal of Heuristics, vol. 3, no. 2, pp. 111-137, 1997. (Pubitemid 127505777)
    • (1997) Journal of Heuristics , vol.3 , Issue.2 , pp. 111-137
    • Demirkol, E.1    Mehta, S.2    Uzsoy, R.3
  • 8
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • Pinedo, M. and Singer, M., "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Research Logistics, vol. 46, no. 1, pp. 1-17, 1999. (Pubitemid 129700845)
    • (1999) Naval Research Logistics , vol.46 , Issue.1 , pp. 15-17
    • Pinedo, M.1    Singer, M.2
  • 9
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • DOI 10.1002/jos.102
    • Mason, S. J., Fowler, J. W. and Carlyle, W. M., "A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops," Journal of Scheduling, vol. 5, pp. 247-262, 2002. (Pubitemid 135712634)
    • (2002) Journal of Scheduling , vol.5 , Issue.3 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Matthew Carlyle, W.3
  • 10
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • Deb, K., Pratap, A., Agarwal, S. and Meyarivan, T., "A fast and elitist multiobjective genetic algorithm: NSGA-II," IEEE Transactions on Evolutionary Computation, vol. 6, no. 2, pp. 182-197, 2002. (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 11
    • 0004140075 scopus 로고    scopus 로고
    • SPEA2: Improving the strength pareto evolutionary algorithm
    • Swiss Federal Institute of Technology (ETH) Zurich, Gloriastrasse 35, CH-8092 Zurich, Switzerland, May
    • Zitzler, E., Laumanns, M. and Thiele, L., "SPEA2: Improving the strength Pareto evolutionary algorithm," Technical Report 103, Computer Engineering and Networks Laboratory (TIK), Swiss Federal Institute of Technology (ETH) Zurich, Gloriastrasse 35, CH-8092 Zurich, Switzerland, May 2001.
    • (2001) Technical Report 103, Computer Engineering and Networks Laboratory (TIK)
    • Zitzler, E.1    Laumanns, M.2    Thiele, L.3
  • 13
    • 0038273913 scopus 로고    scopus 로고
    • Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
    • Ishibuchi, H., Yoshida, T. and Murata, T., "Balance Between Genetic Search and Local Search in Memetic Algorithms for Multiobjective Permutation Flowshop Scheduling," IEEE Transactions on Evolutionary Computation, vol. 7, no. 2, pp. 204-223, 2003.
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.2 , pp. 204-223
    • Ishibuchi, H.1    Yoshida, T.2    Murata, T.3
  • 14
    • 13544262325 scopus 로고    scopus 로고
    • Genetic local search for multi-objective flowshop scheduling problems
    • DOI 10.1016/j.ejor.2004.07.017, PII S0377221704004746, Multicriteria Scheduling
    • Arroyo, J. E. C. and Armentano, V. A., "Genetic local search for multi-objective flowshop scheduling problems," European Journal of Operational Research, vol. 167, no. 3, pp. 717-738, 2005. (Pubitemid 40220087)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 717-738
    • Arroyo, J.E.C.1    Armentano, V.A.2
  • 15
    • 33746788617 scopus 로고    scopus 로고
    • Crowding-measure-based multiobjective evolutionary algorithm for job shop scheduling
    • DOI 10.1007/s00170-005-0029-6
    • Lei, D. and Wu, Z., "Crowding-measure-based multiobjective evolutionary algorithm for job shop scheduling," The International Journal of Advanced Manufacturing Technology, vol. 30, no. 1, pp. 112-117, 2006. (Pubitemid 44180581)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.1-2 , pp. 112-117
    • Lei, D.1    Wu, Z.2
  • 16
    • 34047271309 scopus 로고    scopus 로고
    • Adaptive multi-objective genetic algorithms for scheduling of drilling operation in printed circuit board industry
    • DOI 10.1016/j.asoc.2006.02.002, PII S1568494606000275
    • Chang, P. C., Hsieh, J. C. and Wang, C. Y., "Adaptive multi-objective genetic algorithms for scheduling of drilling operation in printed circuit board industry," Applied Soft Computing, vol. 7, no. 3, pp. 800-806, 2007. (Pubitemid 46551915)
    • (2007) Applied Soft Computing Journal , vol.7 , Issue.3 , pp. 800-806
    • Chang, P.-C.1    Hsieh, J.-C.2    Wang, C.-Y.3
  • 17
    • 0020013653 scopus 로고
    • A state-of-theart survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., Phillips, D. T. and Hogg, G. L., "A state-of-theart survey of dispatching rules for manufacturing job shop operations," International Journal of Production Research, vol. 20, no. 1, pp. 27-45, 1982.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 18
    • 0023399009 scopus 로고
    • PRIORITY RULES FOR JOB SHOPS WITH WEIGHTED TARDINESS COSTS.
    • Vepsalainen, A. P. J. and Morton, T. E., "Priority rules for job shops with weighted tardiness costs," Management Science, vol. 33, no. 8, pp.1035-1047, 1987. (Pubitemid 17656065)
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen Ari, P.J.1    Morton Thomas, E.2
  • 19
    • 34547247618 scopus 로고    scopus 로고
    • Multiobjective job shop scheduling using genetic algorithm with cyclic fitness assignment
    • 1688724, 2006 IEEE Congress on Evolutionary Computation, CEC 2006
    • Chiang, T. C. and Fu, L. C., "Multiobjective Job Shop Scheduling using Genetic Algorithm with Cyclic Fitness Assignment," Proc. of IEEE Congress on Evolutionary Computation, pp. 3266-3273, 2006. (Pubitemid 47130913)
    • (2006) 2006 IEEE Congress on Evolutionary Computation, CEC 2006 , pp. 3266-3273
    • Chiang, T.-C.1    Fu, L.-C.2
  • 20
    • 0026126118 scopus 로고
    • A computational study of the job shop scheduling problem
    • Applegate, D. and Cook, W., "A computational study of the job shop scheduling problem," ORSA Journal on Computing, vol. 3, no. 2, pp. 149-156, 1991.
    • (1991) ORSA Journal on Computing , vol.3 , Issue.2 , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 21
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job-shop scheduling rules
    • Prentice Hall
    • Fisher, H. and Thompson, G. L., "Probabilistic learning combinations of local job-shop scheduling rules," Industrial Scheduling, Prentice Hall, pp. 225-251, 1963.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 22
    • 84878545782 scopus 로고    scopus 로고
    • Multiobjective Optimization Using Evolutionary Algorithms - A Comparative Case Study
    • Parallel Problems Solving from Nature - PPSN V
    • Zitzler, E. and Thiele, L., "Multiobjective Optimization Using Evolutionary Algorithms - A Comparative Study," Parallel Problem Solving from Nature V, Springer, pp. 292-301, 1998. (Pubitemid 128145960)
    • (1998) LECTURE NOTES IN COMPUTER SCIENCE , Issue.1498 , pp. 292-304
    • Zitzler, E.1    Thiele, L.2
  • 23
    • 33845487579 scopus 로고    scopus 로고
    • Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    • DOI 10.1007/s10951-006-0325-5
    • Sourirajan, K. and Uzsoy, R., "Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication," Journal of Scheduling, vol. 10, no. 1, pp. 41-65, 2007. (Pubitemid 44914828)
    • (2007) Journal of Scheduling , vol.10 , Issue.1 , pp. 41-65
    • Sourirajan, K.1    Uzsoy, R.2
  • 25
    • 0035485508 scopus 로고    scopus 로고
    • Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication
    • DOI 10.1109/70.964663, PII S1042296X01097415
    • Chen, J. H., Fu, L. C., Lin, M. H. and Huang, A. C., "Petri-net and GAbased approach to modeling, scheduling, and performance evaluation for wafer fabrication," IEEE Transactions on Robotics and Automation, vol. 17, no. 5, pp. 619-636, 2001. (Pubitemid 33137778)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 619-636
    • Chen, J.-H.1    Fu, L.-C.2    Lin, M.-H.3    Huang, A.-C.4
  • 26
    • 0242301653 scopus 로고    scopus 로고
    • Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system
    • Min, H. S. and Yih, Y., "Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system," International Journal of Production Research, vol. 41, no. 16, pp. 3921-3941, 2003.
    • (2003) International Journal of Production Research , vol.41 , Issue.16 , pp. 3921-3941
    • Min, H.S.1    Yih, Y.2
  • 27
    • 46149091552 scopus 로고    scopus 로고
    • A new paradigm for rulebased scheduling in the wafer probe centre
    • Chiang, T. C., Shen, Y. S. and Fu, L. C., "A new paradigm for rulebased scheduling in the wafer probe centre," International Journal of Production Research, vol. 46, no. 15, pp. 4111-4133, 2008.
    • (2008) International Journal of Production Research , vol.46 , Issue.15 , pp. 4111-4133
    • Chiang, T.C.1    Shen, Y.S.2    Fu, L.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.