메뉴 건너뛰기




Volumn 11, Issue 2, 2000, Pages 122-132

Dynamic scheduling of manufacturing job shops using extreme value theory

Author keywords

Extreme value theory; Job shop; Scheduling

Indexed keywords

COMPUTER SIMULATION; ELECTRIC BREAKDOWN; INDUSTRIAL RESEARCH; PROCESS ENGINEERING; QUALITY CONTROL;

EID: 0034161003     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372800232324     Document Type: Article
Times cited : (9)

References (42)
  • 3
    • 0022923267 scopus 로고
    • Unbiased plotting positions for the general extreme value distribution
    • Arnell, N. W., Beran, M., and Hosking, J. R. M., 1986, Unbiased plotting positions for the general extreme value distribution. Journal of Hydrology, 86, 59-69.
    • (1986) Journal of Hydrology , vol.86 , pp. 59-69
    • Arnell, N.W.1    Beran, M.2    Hosking, J.R.M.3
  • 4
    • 0024855979 scopus 로고
    • Graphical estimation of extreme value prediction functions
    • Brdsley, W. E., 1989, Graphical estimation of extreme value prediction functions, Journal of Hydrology, 110, 315-321.
    • (1989) Journal of Hydrology , vol.110 , pp. 315-321
    • Brdsley, W.E.1
  • 7
    • 0024765468 scopus 로고
    • Bottleneck based beam search for job scheduling in a flexible manufacturing system
    • Chang, Y. L., Matsuo, H., and Sullivan, R. S., 1989, Bottleneck based beam search for job scheduling in a flexible manufacturing system. International J ournal of Production Research, 27, 1949-1961.
    • (1989) International J Ournal of Production Research , vol.27 , pp. 1949-1961
    • Chang, Y.L.1    Matsuo, H.2    Sullivan, R.S.3
  • 13
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queueing analysis
    • Enns, S. T., 1993, Job shop flowtime prediction and tardiness control using queueing analysis. International Journal of Production Research, 31, 2045-2057.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 18
    • 0023857012 scopus 로고
    • Estimation of probability tails based on generalized extreme value distributions
    • Guida, M., and Longo, M., 1988, Estimation of probability tails based on generalized extreme value distributions. Reliability Engineering and System Safety, 20, 219-242.
    • (1988) Reliability Engineering and System Safety , vol.20 , pp. 219-242
    • Guida, M.1    Longo, M.2
  • 19
    • 0004255286 scopus 로고
    • New York, NY: Columbia University Press
    • Gumbel, E. J., 1958, Statistics of Extremes (New York, NY: Columbia University Press).
    • (1958) Statistics of Extremes
    • Gumbel, E.J.1
  • 20
  • 22
    • 0022113451 scopus 로고
    • Estimation of the generalized extreme value distribution by the method of probability weighted moments
    • Hosking, J. R. M., Wallis, J. R., and Wood, E. F., 1985, Estimation of the generalized extreme value distribution by the method of probability weighted moments, Technometrics, 27. 251-261.
    • (1985) Technometrics , vol.27 , pp. 251-261
    • Hosking, J.R.M.1    Wallis, J.R.2    Wood, E.F.3
  • 24
    • 0027625055 scopus 로고
    • Evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling
    • Kannan, V. R., and Ghosh, S., 1993, Evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling. International Journal of Production Research, 31, 1637-1654.
    • (1993) International Journal of Production Research , vol.31 , pp. 1637-1654
    • Kannan, V.R.1    Ghosh, S.2
  • 27
    • 0028452692 scopus 로고
    • A game- theoretic control approach for job shops in the presence of disruptions
    • Leon, V. J., Wu, S. D., and Storer, R. H., 1994, A game- theoretic control approach for job shops in the presence of disruptions. International Journal of Production Research, 32, 1451-1476.
    • (1994) International Journal of Production Research , vol.32 , pp. 1451-1476
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 28
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • Li, R. K., Shyu, Y. T., and Adiga, S., 1993, A heuristic rescheduling algorithm for computer-based production scheduling systems. International J ournal of Production Research, 31, 1815-1826.
    • (1993) International J Ournal of Production Research , vol.31 , pp. 1815-1826
    • Li, R.K.1    Shyu, Y.T.2    Adiga, S.3
  • 29
    • 0027625736 scopus 로고
    • Scheduling of manufacturing systems using the Lagrangian relaxation technique
    • Luh, P. B., and Hoitomt, D. J., 1993, Scheduling of manufacturing systems using the Lagrangian relaxation technique. IEEE Transactions on Automatic Control, 38, 1066-1079.
    • (1993) IEEE Transactions on Automatic Control , vol.38 , pp. 1066-1079
    • Luh, P.B.1    Hoitomt, D.J.2
  • 32
    • 0023488056 scopus 로고
    • Estimating the upper tail of flood frequency distribution
    • Smith, J. A., 1987, Estimating the upper tail of flood frequency distribution. Water Resources Research, 23, 1557-1666.
    • (1987) Water Resources Research , vol.23 , pp. 1557-1666
    • Smith, J.A.1
  • 33
    • 0022582385 scopus 로고
    • Extreme value statistics and reliability applications
    • Smith, R. L., 1986, Extreme value statistics and reliability applications. Reliability Engineering, 15, 161-170.
    • (1986) Reliability Engineering , vol.15 , pp. 161-170
    • Smith, R.L.1
  • 35
    • 0000892122 scopus 로고
    • Parallel taboo search techniques for the job shop scheduling problem
    • Taillard, E. D., 1994, Parallel taboo search techniques for the job shop scheduling problem. ORSA Journal of Computing, 6, 108-117.
    • (1994) ORSA Journal of Computing , vol.6 , pp. 108-117
    • Taillard, E.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.