-
1
-
-
84918379220
-
A formal set of algorithms for project scheduling with critical path method-material requirements planning
-
Aquilano N.J., Smith D.E. A formal set of algorithms for project scheduling with critical path method-material requirements planning. J. Oper. Manage. 1980, 1(2):57-67.
-
(1980)
J. Oper. Manage.
, vol.1
, Issue.2
, pp. 57-67
-
-
Aquilano, N.J.1
Smith, D.E.2
-
2
-
-
0000733012
-
Constrained resource project scheduling subject to material constraints
-
Smith-Daniels D.E., Aquilano N.J. Constrained resource project scheduling subject to material constraints. J. Oper. Manage. 1984, 4(4):369-388.
-
(1984)
J. Oper. Manage.
, vol.4
, Issue.4
, pp. 369-388
-
-
Smith-Daniels, D.E.1
Aquilano, N.J.2
-
3
-
-
0023365806
-
Optimal project scheduling with material ordering
-
Smith-Daniels D.E., Smith-Daniels V.L. Optimal project scheduling with material ordering. IIE Trans. 1987, 19(4):122-129.
-
(1987)
IIE Trans.
, vol.19
, Issue.4
, pp. 122-129
-
-
Smith-Daniels, D.E.1
Smith-Daniels, V.L.2
-
4
-
-
0035501860
-
Integrated project scheduling and material planning with variable activity duration and rewards
-
Dodin B., Eliman A.A. Integrated project scheduling and material planning with variable activity duration and rewards. IIE Trans. 2001, 33:1005-1018.
-
(2001)
IIE Trans.
, vol.33
, pp. 1005-1018
-
-
Dodin, B.1
Eliman, A.A.2
-
5
-
-
9744223595
-
Scheduling recurrent construction
-
Schmitt T., Faaland B. Scheduling recurrent construction. Naval Res. Logist. 2004, 51(8):1102-1128.
-
(2004)
Naval Res. Logist.
, vol.51
, Issue.8
, pp. 1102-1128
-
-
Schmitt, T.1
Faaland, B.2
-
6
-
-
76249104135
-
Concurrent project scheduling and material planning: a genetic algorithm approach
-
Sajadieh M.S., Shadrokh S., Hassanzadeh F. Concurrent project scheduling and material planning: a genetic algorithm approach. Trans. E: Ind. Eng. 2009, 16(2):91-99.
-
(2009)
Trans. E: Ind. Eng.
, vol.16
, Issue.2
, pp. 91-99
-
-
Sajadieh, M.S.1
Shadrokh, S.2
Hassanzadeh, F.3
-
8
-
-
78049437703
-
Event-based MILP models for resource-constrained project scheduling problems
-
Kone O., Artigues C., Lopez P., et al. Event-based MILP models for resource-constrained project scheduling problems. Comput. Oper. Res. 2011, 38:3-13.
-
(2011)
Comput. Oper. Res.
, vol.38
, pp. 3-13
-
-
Kone, O.1
Artigues, C.2
Lopez, P.3
-
9
-
-
79958149341
-
An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
-
Wang L., Fang C. An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem. Comput. Oper. Res. 2012, 39:449-460.
-
(2012)
Comput. Oper. Res.
, vol.39
, pp. 449-460
-
-
Wang, L.1
Fang, C.2
-
10
-
-
84870987193
-
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
-
Parviz G., Ehsan E., et al. Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Autom. Constr. 2013, 30:216-227.
-
(2013)
Autom. Constr.
, vol.30
, pp. 216-227
-
-
Parviz, G.1
Ehsan, E.2
-
11
-
-
33750704281
-
Applying genetic algorithms to dynamic lot sizing with batch ordering
-
Gaafar L. Applying genetic algorithms to dynamic lot sizing with batch ordering. Comput. Ind. Eng. 2006, 51:433-444.
-
(2006)
Comput. Ind. Eng.
, vol.51
, pp. 433-444
-
-
Gaafar, L.1
-
12
-
-
52049110299
-
Approximate analysis and optimization of batch ordering policies in capacitated supply chains
-
Karaman A., Altiok T. Approximate analysis and optimization of batch ordering policies in capacitated supply chains. Eur. J. Oper. Res. 2009, 193:222-237.
-
(2009)
Eur. J. Oper. Res.
, vol.193
, pp. 222-237
-
-
Karaman, A.1
Altiok, T.2
-
13
-
-
77957926110
-
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
-
Topan E., Bayindir P.Z., Tan T. An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse. Oper. Res. Lett. 2010, 38:454-461.
-
(2010)
Oper. Res. Lett.
, vol.38
, pp. 454-461
-
-
Topan, E.1
Bayindir, P.Z.2
Tan, T.3
-
14
-
-
84874534494
-
A supplier-retailer supply chain with intermediate storage for batch ordering
-
Hwang J., Wan Y. A supplier-retailer supply chain with intermediate storage for batch ordering. Int. J. Prod. Econ. 2013, 142(2):343-352.
-
(2013)
Int. J. Prod. Econ.
, vol.142
, Issue.2
, pp. 343-352
-
-
Hwang, J.1
Wan, Y.2
-
15
-
-
0034974417
-
A new heuristic optimization algorithm: harmony search
-
Geem Z., Kim J., Loganathan G. A new heuristic optimization algorithm: harmony search. Simulation 2001, 76(2):60-68.
-
(2001)
Simulation
, vol.76
, Issue.2
, pp. 60-68
-
-
Geem, Z.1
Kim, J.2
Loganathan, G.3
-
16
-
-
33646268618
-
Optimal cost design of water distribution networks using harmony search
-
Geem Z. Optimal cost design of water distribution networks using harmony search. Eng. Optim. 2006, 38(3):259-280.
-
(2006)
Eng. Optim.
, vol.38
, Issue.3
, pp. 259-280
-
-
Geem, Z.1
-
17
-
-
0036304087
-
Harmony search optimization: application to pipe network design
-
Geem Z., Kim J., Loganathan G. Harmony search optimization: application to pipe network design. Int. J. Model. Simul. 2002, 22:125-133.
-
(2002)
Int. J. Model. Simul.
, vol.22
, pp. 125-133
-
-
Geem, Z.1
Kim, J.2
Loganathan, G.3
-
18
-
-
70749099573
-
Application of new version of harmony search algorithm in slope stability analysis
-
Li L., Chi S. Application of new version of harmony search algorithm in slope stability analysis. J. Water Resour. Archit. Eng. 2007, l5(3):1-6.
-
(2007)
J. Water Resour. Archit. Eng.
, vol.L5
, Issue.3
, pp. 1-6
-
-
Li, L.1
Chi, S.2
-
19
-
-
70749122552
-
Harmony search algorithms for no-idle flow shop scheduling problems
-
Wu L., Pan Q., Sang H., et al. Harmony search algorithms for no-idle flow shop scheduling problems. Comput. Integr. Manuf. Syst. 2009, 15(10):1960-1967.
-
(2009)
Comput. Integr. Manuf. Syst.
, vol.15
, Issue.10
, pp. 1960-1967
-
-
Wu, L.1
Pan, Q.2
Sang, H.3
-
20
-
-
34648837872
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
-
Valls V., Ballsestin F., Quintanilla S. A hybrid genetic algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 2008, 185:495-508.
-
(2008)
Eur. J. Oper. Res.
, vol.185
, pp. 495-508
-
-
Valls, V.1
Ballsestin, F.2
Quintanilla, S.3
-
21
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
Kolisch R., Sprecher A., Drexl A. Characterization and generation of a general class of resource constrained project scheduling problems. Manage. Sci. 1995, 41:1693-1703.
-
(1995)
Manage. Sci.
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
22
-
-
0030788844
-
PSPLIB - a project scheduling problem library
-
Kolisch R., Sprecher A. PSPLIB - a project scheduling problem library. Eur. J. Oper. Res. 1996, 96:205-216.
-
(1996)
Eur. J. Oper. Res.
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
23
-
-
84874617007
-
Investigation of PWR core optimization using harmony search algorithms
-
Aghaie M., Nazari T., Zolfaghari A., et al. Investigation of PWR core optimization using harmony search algorithms. Ann. Nucl. Energy 2013, 57:1-15.
-
(2013)
Ann. Nucl. Energy
, vol.57
, pp. 1-15
-
-
Aghaie, M.1
Nazari, T.2
Zolfaghari, A.3
|