메뉴 건너뛰기




Volumn 2, Issue , 2011, Pages 119-125

Energy management in manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords

DYNAMIC PRODUCTION; ENERGY COST; ENERGY SYSTEMS; ENVIRONMENTAL CONCERNS; INTEGRATED ENERGY MANAGEMENT; MANUFACTURING ENVIRONMENTS; MANUFACTURING SYSTEM; MULTI-STAGE MANUFACTURING SYSTEMS; OVERALL BENEFIT; PRODUCTION EFFICIENCY; PRODUCTION MANAGEMENT; PRODUCTION SYSTEM; SYSTEMATIC METHOD;

EID: 82455205922     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/MSEC2011-50098     Document Type: Conference Paper
Times cited : (3)

References (20)
  • 2
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • Blumenfeld, D.E. and Li, J., "An analytical formula for throughput of a production line with identical stations and random failures", Mathematical Problems in Engineering, 3, 293-308, 2005
    • (2005) Mathematical Problems in Engineering , vol.3 , pp. 293-308
    • Blumenfeld, D.E.1    Li, J.2
  • 7
    • 44449123785 scopus 로고    scopus 로고
    • WingSpan Press, Preliminary Edition, Third Printing edition
    • Li, J. and Meerkov, S.M. Production Systems Engineering. WingSpan Press, Preliminary Edition, Third Printing edition, 2008.
    • (2008) Production Systems Engineering
    • Li, J.1    Meerkov, S.M.2
  • 9
    • 70449688157 scopus 로고    scopus 로고
    • Data driven bottleneck detection of manufacturing systems
    • Li, L., Chang, Q., and Ni, J., "Data Driven Bottleneck Detection of Manufacturing Systems", International Journal of Production Research, 47:18, 5019-5036, 2009.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5019-5036
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 10
    • 70449578995 scopus 로고    scopus 로고
    • "Real"time production improvement through bottleneck control
    • Li, L., Chang, Q., and Ni, J., "Real"time Production Improvement through Bottleneck Control", International Journal of Production Research, 47:21, 6145-6158, 2009.
    • (2009) International Journal of Production Research , vol.47 , Issue.21 , pp. 6145-6158
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 12
    • 0029287702 scopus 로고
    • Integration optimization, priority setting, planning and combining of maintenance activities
    • Dekker, R., "Integration optimization, priority setting, planning and combining of maintenance activities", European Journal of Operational research, Vol. 82, pp. 225-240, 1995.
    • (1995) European Journal of Operational Research , vol.82 , pp. 225-240
    • Dekker, R.1
  • 13
    • 77949832582 scopus 로고    scopus 로고
    • Energy efficiency improvement and cost saving opportunities for the vehicle assembly industry
    • LBNL-50939-Revision
    • Galitsky, Christina and Worrell, Ernst, "Energy efficiency improvement and cost saving opportunities for the vehicle assembly industry", Ernest Orlando Lawrence Berkeley National Laboratory Report, LBNL-50939-Revision, 2008.
    • (2008) Ernest Orlando Lawrence Berkeley National Laboratory Report
    • Christina, G.1    Ernst, W.2
  • 14
    • 84885254695 scopus 로고    scopus 로고
    • Lean and Energy Toolkit, Chapter 3
    • U.S. Environmental Protection Agency (EPA), Lean and Energy Toolkit, "Chapter 3: Energy Assessment Strategies", 2009. http://www.epa.gov/ lean/energytoolkit/ch3.htm
    • (2009) Energy Assessment Strategies
  • 15
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • Sevast'yanov, B. A., "Influence of storage bin capacity on the average standstill time of a production line", Theory of Probability and its Applications, 7(4):429-438, 1962.
    • (1962) Theory of Probability and Its Applications , vol.7 , Issue.4 , pp. 429-438
    • Sevast'Yanov, B.A.1
  • 16
    • 0018444869 scopus 로고
    • The effect of inter stage buffer storage on output of two unreliable production units in series with different production rates
    • Wijngaard, J., "The effect of inter stage buffer storage on output of two unreliable production units in series with different production rates", AIIE Transactions, 11(1):42-47, 1979.
    • (1979) AIIE Transactions , vol.11 , Issue.1 , pp. 42-47
    • Wijngaard, J.1
  • 17
    • 0010769391 scopus 로고
    • Continuous model of an unreliable two stage material flow system with a finite inter-stage buffer
    • Massachusetts Institute of Technology, MA
    • Gershwin, S. and Schick, I., "Continuous model of an unreliable two"stage material flow system with a finite inter-stage buffer", Technical Report 1039, Massachusetts Institute of Technology, MA, 1980.
    • (1980) Technical Report , vol.1039
    • Gershwin, S.1    Schick, I.2
  • 20
    • 78649985524 scopus 로고    scopus 로고
    • Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
    • accepted to appear in
    • Chang, Q., Biller, S., and Xiao, G., "Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems", accepted to appear in ASME Transaction, Journal of Manufacturing Science and Engineering, Vol. 132, 2010.
    • (2010) ASME Transaction, Journal of Manufacturing Science and Engineering , vol.132
    • Chang, Q.1    Biller, S.2    Xiao, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.