-
1
-
-
34247645931
-
General Motors increases its production throughput
-
Alden, J.M., Burns, L.D., Costy, T., Hutton, R.D., Jackson., Jackson, C.A., Kim, D.S., Kohls, K.A., Owen, J.H., Turnquist, M.A. and Vander Veen, D.J., "General Motors increases its production throughput", Interfaces, 36 (1), 6-25, 2006.
-
(2006)
Interfaces
, vol.36
, Issue.1
, pp. 6-25
-
-
Alden, J.M.1
Burns, L.D.2
Costy, T.3
Jackson. H. D, R.4
Jackson, C.A.5
Kim, D.S.6
Kohls, K.A.7
Owen, J.H.8
Turnquist, M.A.9
Vander Veen, D.J.10
-
2
-
-
31044437924
-
An analytical formula for throughput of a production line with identical stations and random failures
-
Blumenfeld, D.E. and Li, J., "An analytical formula for throughput of a production line with identical stations and random failures", Mathematical Problems in Engineering, 3, 293-308, 2005
-
(2005)
Mathematical Problems in Engineering
, vol.3
, pp. 293-308
-
-
Blumenfeld, D.E.1
Li, J.2
-
4
-
-
34547396533
-
Supervisory factory control based on real" Time Production Feedback
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., and Xiao,G., "Supervisory Factory Control Based on Real" Time Production Feedback", ASME Transaction, Journal of Manufacturing Science and Engineering, Vol 129, pp 653-660, 2007.
-
(2007)
ASME Transaction, Journal of Manufacturing Science and Engineering
, vol.129
, pp. 653-660
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.5
-
7
-
-
44449123785
-
-
WingSpan Press, Preliminary Edition, Third Printing edition
-
Li, J. and Meerkov, S.M. Production Systems Engineering. WingSpan Press, Preliminary Edition, Third Printing edition, 2008.
-
(2008)
Production Systems Engineering
-
-
Li, J.1
Meerkov, S.M.2
-
8
-
-
34547689494
-
Maintenance staffing management
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., and Xiao, G., "Maintenance Staffing Management", Journal of Intelligent Manufacturing, 18: 351-360, 2007.
-
(2007)
Journal of Intelligent Manufacturing
, vol.18
, pp. 351-360
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.5
-
9
-
-
70449688157
-
Data driven bottleneck detection of manufacturing systems
-
Li, L., Chang, Q., and Ni, J., "Data Driven Bottleneck Detection of Manufacturing Systems", International Journal of Production Research, 47:18, 5019-5036, 2009.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.18
, pp. 5019-5036
-
-
Li, L.1
Chang, Q.2
Ni, J.3
-
10
-
-
70449578995
-
"Real"time production improvement through bottleneck control
-
Li, L., Chang, Q., and Ni, J., "Real"time Production Improvement through Bottleneck Control", International Journal of Production Research, 47:21, 6145-6158, 2009.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 6145-6158
-
-
Li, L.1
Chang, Q.2
Ni, J.3
-
11
-
-
0034291972
-
DT"botlenecks in serial production lines: Theory and application
-
Chiang, S. Y., Kuo, C. T., and Meerkov, S. M. DT"botlenecks in serial production lines: theory and application. IEEE Transactions on Robotics and Automation, Vol. 16, No. 5, pp 567-580, 2000.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, Issue.5
, pp. 567-580
-
-
Chiang, S.Y.1
Kuo, C.T.2
Meerkov, S.M.3
-
12
-
-
0029287702
-
Integration optimization, priority setting, planning and combining of maintenance activities
-
Dekker, R., "Integration optimization, priority setting, planning and combining of maintenance activities", European Journal of Operational research, Vol. 82, pp. 225-240, 1995.
-
(1995)
European Journal of Operational Research
, vol.82
, pp. 225-240
-
-
Dekker, R.1
-
13
-
-
77949832582
-
Energy efficiency improvement and cost saving opportunities for the vehicle assembly industry
-
LBNL-50939-Revision
-
Galitsky, Christina and Worrell, Ernst, "Energy efficiency improvement and cost saving opportunities for the vehicle assembly industry", Ernest Orlando Lawrence Berkeley National Laboratory Report, LBNL-50939-Revision, 2008.
-
(2008)
Ernest Orlando Lawrence Berkeley National Laboratory Report
-
-
Christina, G.1
Ernst, W.2
-
14
-
-
84885254695
-
-
Lean and Energy Toolkit, Chapter 3
-
U.S. Environmental Protection Agency (EPA), Lean and Energy Toolkit, "Chapter 3: Energy Assessment Strategies", 2009. http://www.epa.gov/ lean/energytoolkit/ch3.htm
-
(2009)
Energy Assessment Strategies
-
-
-
15
-
-
0009455220
-
Influence of storage bin capacity on the average standstill time of a production line
-
Sevast'yanov, B. A., "Influence of storage bin capacity on the average standstill time of a production line", Theory of Probability and its Applications, 7(4):429-438, 1962.
-
(1962)
Theory of Probability and Its Applications
, vol.7
, Issue.4
, pp. 429-438
-
-
Sevast'Yanov, B.A.1
-
16
-
-
0018444869
-
The effect of inter stage buffer storage on output of two unreliable production units in series with different production rates
-
Wijngaard, J., "The effect of inter stage buffer storage on output of two unreliable production units in series with different production rates", AIIE Transactions, 11(1):42-47, 1979.
-
(1979)
AIIE Transactions
, vol.11
, Issue.1
, pp. 42-47
-
-
Wijngaard, J.1
-
17
-
-
0010769391
-
Continuous model of an unreliable two stage material flow system with a finite inter-stage buffer
-
Massachusetts Institute of Technology, MA
-
Gershwin, S. and Schick, I., "Continuous model of an unreliable two"stage material flow system with a finite inter-stage buffer", Technical Report 1039, Massachusetts Institute of Technology, MA, 1980.
-
(1980)
Technical Report
, vol.1039
-
-
Gershwin, S.1
Schick, I.2
-
18
-
-
34547416651
-
Maintenance opportunity planning system
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., and Xiao, G., "Maintenance Opportunity Planning System", ASME Transaction, Journal of Manufacturing Science and Engineering, Vol 129, pp 661-668, 2007.
-
(2007)
ASME Transaction, Journal of Manufacturing Science and Engineering
, vol.129
, pp. 661-668
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.5
-
19
-
-
82455186138
-
Transient analysis of downtime event in manufacturing systems
-
Erie, Pennsylvania, October 12-15
-
Chang, Q., Liu, J., Biller, S., and Xiao, G., "Transient analysis of downtime event in manufacturing systems", Proceedings of the 2010 ASME International Manufacturing Science and Engineering conference, Erie, Pennsylvania, October 12-15, 2010.
-
(2010)
Proceedings of the 2010 ASME International Manufacturing Science and Engineering Conference
-
-
Chang, Q.1
Liu, J.2
Biller, S.3
Xiao, G.4
-
20
-
-
78649985524
-
Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
-
accepted to appear in
-
Chang, Q., Biller, S., and Xiao, G., "Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems", accepted to appear in ASME Transaction, Journal of Manufacturing Science and Engineering, Vol. 132, 2010.
-
(2010)
ASME Transaction, Journal of Manufacturing Science and Engineering
, vol.132
-
-
Chang, Q.1
Biller, S.2
Xiao, G.3
|