메뉴 건너뛰기




Volumn 67, Issue 1-4, 2013, Pages 157-169

Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures

Author keywords

Input sequencing; Priority Rules; Reconfigurable manufacturing system; Scheduling; Simulation

Indexed keywords

HARDWARE AND SOFTWARE COMPONENTS; INPUT SEQUENCING; MULTIPLE PROCESS PLANS; PRIORITY RULES; RECONFIGURABLE MANUFACTURING SYSTEM; ROUTING FLEXIBILITY; SEQUENCING AND SCHEDULING; SIMULATION;

EID: 84888381781     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-013-4761-z     Document Type: Article
Times cited : (36)

References (39)
  • 1
    • 0034250590 scopus 로고    scopus 로고
    • Reconfigurable manufacturing systems: Key to future manufacturing
    • 10.1023/A:1008930403506
    • Mehrabi MG, Ulsoy AG, Koren Y (2000) Reconfigurable manufacturing systems: key to future manufacturing. J Intell Manuf 11:403-419
    • (2000) J Intell Manuf , vol.11 , pp. 403-419
    • Mehrabi, M.G.1    Ulsoy, A.G.2    Koren, Y.3
  • 2
    • 0036535815 scopus 로고    scopus 로고
    • Trends and perspectives in flexible and reconfigurable manufacturing systems
    • 10.1023/A:1014536330551
    • Mehrabi MG, Ulsoy AG, Koren Y, Heytler P (2002) Trends and perspectives in flexible and reconfigurable manufacturing systems. J Intell Manuf 13:135-146
    • (2002) J Intell Manuf , vol.13 , pp. 135-146
    • Mehrabi, M.G.1    Ulsoy, A.G.2    Koren, Y.3    Heytler, P.4
  • 3
    • 36248974607 scopus 로고    scopus 로고
    • Recnfigurable manufacturing systems: The state of the art
    • 1160.90368 10.1080/00207540600905646
    • Bi ZM, Lang SYY, Shen W, Wang L (2008) Recnfigurable manufacturing systems: the state of the art. Int J Prod Res 46:967-992
    • (2008) Int J Prod Res , vol.46 , pp. 967-992
    • Bi, Z.M.1    Lang, S.Y.Y.2    Shen, W.3    Wang, L.4
  • 5
    • 0024700372 scopus 로고
    • Order review/release: Research issue and perspectives
    • 10.1080/00207548908942609
    • Melnyk SA, Ragatz GL (1989) Order review/release: research issue and perspectives. Int J Prod Res 27:1081-1096
    • (1989) Int J Prod Res , vol.27 , pp. 1081-1096
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 6
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McComick ST, Pinedo ML, Wolf B (1988) Sequencing in an assembly line with blocking to minimize cycle time. Oper Res 36:925-935
    • (1988) Oper Res , vol.36 , pp. 925-935
    • McComick, S.T.1    Pinedo, M.L.2    Wolf, B.3
  • 7
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • 0666.90040 10.1287/mnsc.35.2.192
    • Miltenburg J (1989) Level schedules for mixed-model assembly lines in just-in-time production systems. Manag Sci 35:192-207
    • (1989) Manag Sci , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 8
    • 0001377662 scopus 로고
    • Part input into a flexible flow system: An evaluation of look-ahead simulation and fuzzy rule base
    • 10.1007/BF01313696
    • O'keef RM, Rao R (1992) Part input into a flexible flow system: an evaluation of look-ahead simulation and fuzzy rule base. Int J Flex Manuf Syst 4:113-127
    • (1992) Int J Flex Manuf Syst , vol.4 , pp. 113-127
    • O'Keef, R.M.1    Rao, R.2
  • 9
    • 0012219716 scopus 로고
    • Technical Report LIDS-R-879, Massachussetts Institute of Technology
    • Hiltz KL (1979) Scheduling of flexible flowshops. Technical Report LIDS-R-879, Massachussetts Institute of Technology
    • (1979) Scheduling of Flexible Flowshops
    • Hiltz, K.L.1
  • 10
    • 0026954929 scopus 로고
    • Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
    • 10.1109/17.165418
    • Steck KE (1992) Procedures to determine part mix ratios for independent demands in flexible manufacturing systems. IEEE Trans Eng Manag 39:359-369
    • (1992) IEEE Trans Eng Manag , vol.39 , pp. 359-369
    • Steck, K.E.1
  • 11
    • 0030270156 scopus 로고    scopus 로고
    • On the robustness of using balanced part mix ratios to determine cyclic part input sequence into flexible flow systems
    • 0924.90088 10.1080/00207549608905066
    • Smith TM, Steck KE (1996) On the robustness of using balanced part mix ratios to determine cyclic part input sequence into flexible flow systems. Int J Prod Res 34:2925-2941
    • (1996) Int J Prod Res , vol.34 , pp. 2925-2941
    • Smith, T.M.1    Steck, K.E.2
  • 13
    • 0001590283 scopus 로고
    • An inexact algorithm for part input sequencing and scheduling and scheduling with side constraints in FMS
    • 10.1007/BF00223020
    • Escudero LF (1989) An inexact algorithm for part input sequencing and scheduling and scheduling with side constraints in FMS. Int J Flex Manuf Syst 1:143-174
    • (1989) Int J Flex Manuf Syst , vol.1 , pp. 143-174
    • Escudero, L.F.1
  • 14
    • 0000639019 scopus 로고    scopus 로고
    • Scheduling algorithms for flexible manufacturing systems with partially grouped machines
    • 10.1016/S0278-6125(00)86632-7
    • Lee D-H, Kim Y-D (1999) Scheduling algorithms for flexible manufacturing systems with partially grouped machines. J Manuf Syst 18:301-309
    • (1999) J Manuf Syst , vol.18 , pp. 301-309
    • Lee, D.-H.1    Kim, Y.-D.2
  • 15
    • 0035899768 scopus 로고    scopus 로고
    • Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems
    • 1002.90021 10.1016/S0377-2217(00)00210-1
    • Kim Y-D, Lee D-H, Yoon C-M (2001) Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems. Eur J Oper Res 133:624-634
    • (2001) Eur J Oper Res , vol.133 , pp. 624-634
    • Kim, Y.-D.1    Lee, D.-H.2    Yoon, C.-M.3
  • 16
    • 44649131388 scopus 로고    scopus 로고
    • A dynamic heuristic based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability
    • 1147.90418 10.1007/s10696-008-9045-9
    • He Y, Smith ML (2007) A dynamic heuristic based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability. Int J Flex Manuf Syst 19:392-409
    • (2007) Int J Flex Manuf Syst , vol.19 , pp. 392-409
    • He, Y.1    Smith, M.L.2
  • 18
    • 0035836306 scopus 로고    scopus 로고
    • Mathematical modeling and heuristic approaches to operation scheduling problems in an FMS environment
    • 1060.90647 10.1080/00207540150504403
    • Low C, Wu T-H (2001) Mathematical modeling and heuristic approaches to operation scheduling problems in an FMS environment. Int J Prod Res 39:689-708
    • (2001) Int J Prod Res , vol.39 , pp. 689-708
    • Low, C.1    Wu, T.-H.2
  • 19
    • 0344898438 scopus 로고    scopus 로고
    • Scheduling decisions in FMS using a heuristic approach
    • 10.1007/s00170-002-1474-0
    • Noorul Hag A, Karthikeyan T, Dinesh M (2003) Scheduling decisions in FMS using a heuristic approach. Int J Adv Manuf Technol 22:374-379
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 374-379
    • Noorul Hag, A.1    Karthikeyan, T.2    Dinesh, M.3
  • 20
    • 23344453490 scopus 로고    scopus 로고
    • Modeling and heuristics of FMS scheduling with multiple objectives
    • 1077.90026 10.1016/j.cor.2004.07.013
    • Low C, Yip Y, Wu T-H (2006) Modeling and heuristics of FMS scheduling with multiple objectives. Comput Oper Res 33:674-694
    • (2006) Comput Oper Res , vol.33 , pp. 674-694
    • Low, C.1    Yip, Y.2    Wu, T.-H.3
  • 21
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • 2586405 1144.90379 10.1016/j.cor.2007.01.001
    • Gao J, Sun L, Gen M (2008) A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Comput Oper Res 35:2892-2907
    • (2008) Comput Oper Res , vol.35 , pp. 2892-2907
    • Gao, J.1    Sun, L.2    Gen, M.3
  • 22
    • 41749104232 scopus 로고    scopus 로고
    • A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem
    • 2412981 1146.90427 10.1016/j.ejor.2007.06.039
    • Vilcot G, Billaut J-C (2008) A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem. Eur J Oper Res 190:398-411
    • (2008) Eur J Oper Res , vol.190 , pp. 398-411
    • Vilcot, G.1    Billaut, J.-C.2
  • 23
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible job shop scheduling problems
    • 10.1016/j.cie.2005.01.018
    • Xia W, Wu Z (2005) An effective hybrid optimization approach for multi-objective flexible job shop scheduling problems. Comput Ind Eng 48:409-425
    • (2005) Comput Ind Eng , vol.48 , pp. 409-425
    • Xia, W.1    Wu, Z.2
  • 24
    • 0037146442 scopus 로고    scopus 로고
    • Linguistic-based meta-heuristic optimization model for flexible job-shop scheduling
    • 1064.90541 10.1080/00207540210147043
    • Baykasoglu A (2002) Linguistic-based meta-heuristic optimization model for flexible job-shop scheduling. Int J Prod Res 40:4523-4543
    • (2002) Int J Prod Res , vol.40 , pp. 4523-4543
    • Baykasoglu, A.1
  • 25
    • 4944252227 scopus 로고    scopus 로고
    • Using multiple objective tabu search and grammars to model and solve multi-objective flexible job-shop scheduling problems
    • 10.1023/B:JIMS.0000042663.16199.84
    • Baykasoglu A, ÖzbakIr L, Sönmez AI (2004) Using multiple objective tabu search and grammars to model and solve multi-objective flexible job-shop scheduling problems. J Intell Manuf 15:777-785
    • (2004) J Intell Manuf , vol.15 , pp. 777-785
    • Baykasoglu, A.1    Özbakir, L.2    Sönmez, A.I.3
  • 26
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • 10.1016/S0360-8352(02)00079-7
    • Lee Y-H, Jeong C-S, Moon C (2002) Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comput Ind Eng 43:351-374
    • (2002) Comput Ind Eng , vol.43 , pp. 351-374
    • Lee, Y.-H.1    Jeong, C.-S.2    Moon, C.3
  • 27
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • 1998973 1049.90026 10.1016/S0305-0548(02)00063-1
    • Kim Y-K, Park K, Ko J (2003) A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput Oper Res 30:1151-1171
    • (2003) Comput Oper Res , vol.30 , pp. 1151-1171
    • Kim, Y.-K.1    Park, K.2    Ko, J.3
  • 28
    • 84886385657 scopus 로고    scopus 로고
    • A genetic algorithm for integration of process planning and scheduling in a job shop
    • Park B-J, Choi H-R (2006) A genetic algorithm for integration of process planning and scheduling in a job shop. Lect Notes Artif Intell 4304:647-657
    • (2006) Lect Notes Artif Intell , vol.4304 , pp. 647-657
    • Park, B.-J.1    Choi, H.-R.2
  • 29
    • 75449102375 scopus 로고    scopus 로고
    • Mathematical models for job-shop scheduling problems with routing and process plan flexibility
    • 2592590 10.1016/j.apm.2009.09.002
    • Ozguven C, Ozbakir L, Yavuz Y (2010) Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl Math Model 34:1539-1548
    • (2010) Appl Math Model , vol.34 , pp. 1539-1548
    • Ozguven, C.1    Ozbakir, L.2    Yavuz, Y.3
  • 30
    • 84880249924 scopus 로고    scopus 로고
    • A priority scheduling approach for flexible job shops with multiple process plans
    • press
    • Doh H-H, Yu J-M, Kim J-S, Lee D-H, Nam S-H (2013) A priority scheduling approach for flexible job shops with multiple process plans. In J Prod Res (in press)
    • (2013) Int J Prod Res
    • Doh, H.-H.1    Yu, J.-M.2    Kim, J.-S.3    Lee, D.-H.4    Nam, S.-H.5
  • 31
    • 0030270466 scopus 로고    scopus 로고
    • Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities
    • 0929.90020 10.1080/00207549608905065
    • Ho YC, Moodie CL (1996) Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. Int J Prod Res 34:2901-2923
    • (1996) Int J Prod Res , vol.34 , pp. 2901-2923
    • Ho, Y.C.1    Moodie, C.L.2
  • 32
    • 0027342202 scopus 로고
    • Heuristic approaches for loading problems in flexible manufacturing systems
    • 10.1080/07408179308964263
    • Kim Y-D, Yano CA (1993) Heuristic approaches for loading problems in flexible manufacturing systems. IIE Trans 25:26-39
    • (1993) IIE Trans , vol.25 , pp. 26-39
    • Kim, Y.-D.1    Yano, C.A.2
  • 33
    • 0033640418 scopus 로고    scopus 로고
    • Loading algorithms for flexible manufacturing systems with partially grouped machines
    • Lee D-H, Kim Y-D (2000) Loading algorithms for flexible manufacturing systems with partially grouped machines. IIE Trans 32:33-47
    • (2000) IIE Trans , vol.32 , pp. 33-47
    • Lee, D.-H.1    Kim, Y.-D.2
  • 34
    • 55649124898 scopus 로고    scopus 로고
    • Modified particle swarm optimization for solving machine-loading problems in flexible manufacturing systems
    • 10.1007/s00170-007-1284-5
    • Biswas S, Mahapatra SS (2008) Modified particle swarm optimization for solving machine-loading problems in flexible manufacturing systems. Int J Adv Manuf Technol 39:931-942
    • (2008) Int J Adv Manuf Technol , vol.39 , pp. 931-942
    • Biswas, S.1    Mahapatra, S.S.2
  • 35
    • 77951131741 scopus 로고    scopus 로고
    • Incorporating dynamism in traditional machine loading problem: An AI-based optimisation approach
    • 1197.90107 10.1080/00207540902814306
    • Mandal SK, Pandey MK, Tiwari MK (2010) Incorporating dynamism in traditional machine loading problem: an AI-based optimisation approach. Int J Prod Res 48:3535-3559
    • (2010) Int J Prod Res , vol.48 , pp. 3535-3559
    • Mandal, S.K.1    Pandey, M.K.2    Tiwari, M.K.3
  • 36
    • 84855983474 scopus 로고    scopus 로고
    • Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints
    • 10.1007/s00170-011-3417-0
    • Kim H-W, Yu J-M, Kim J-S, Doh H-H, Lee D-H, Nam S-H (2012) Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints. Int J Adv Manuf Technol 58:683-691
    • (2012) Int J Adv Manuf Technol , vol.58 , pp. 683-691
    • Kim, H.-W.1    Yu, J.-M.2    Kim, J.-S.3    Doh, H.-H.4    Lee, D.-H.5    Nam, S.-H.6
  • 37
    • 0003054955 scopus 로고
    • A survey of scheduling rules
    • 10.1287/opre.25.1.45
    • Panwalkark S, Iskander W (1977) A survey of scheduling rules. Oper Res 25:45-61
    • (1977) Oper Res , vol.25 , pp. 45-61
    • Panwalkark, S.1    Iskander, W.2
  • 38
    • 0020013653 scopus 로고
    • A state of the art survey of dispatching rules for manufacturing job shop operations
    • 10.1080/00207548208947745
    • Blackstone JH, Phillips DT, Hogg GL (1982) A state of the art survey of dispatching rules for manufacturing job shop operations. Int J Prod Res 20:7-45
    • (1982) Int J Prod Res , vol.20 , pp. 7-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.