메뉴 건너뛰기




Volumn 34, Issue 10, 1996, Pages 2925-2941

On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL MANAGEMENT; INTEGER PROGRAMMING; MACHINERY; OPERATIONS RESEARCH; OPTIMIZATION; PRODUCTION ENGINEERING; SCHEDULING;

EID: 0030270156     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905066     Document Type: Article
Times cited : (17)

References (31)
  • 3
    • 0028466353 scopus 로고
    • A Comparative Study of FMS Tool Allocation and Part Type Selection Approaches for a Varying Part Type Mix
    • Amoaka-Gyampah, K., 1994, A Comparative Study of FMS Tool Allocation and Part Type Selection Approaches for a Varying Part Type Mix. International Journal of Flexible Manufacturing Systems, 6(3), 179-207.
    • (1994) International Journal of Flexible Manufacturing Systems , vol.6 , Issue.3 , pp. 179-207
    • Amoaka-Gyampah, K.1
  • 4
    • 0014807274 scopus 로고
    • A heuristic algorithm for then job, m machine sequencing problem
    • Campbell, H. G., Dudbk, R. A., and Smith, M. L., 1970, A heuristic algorithm for then job, m machine sequencing problem. Management Science, 16(10), 630-637.
    • (1970) Management Science , vol.16 , Issue.10 , pp. 630-637
    • Campbell, H.G.1    Dudbk, R.A.2    Smith, M.L.3
  • 6
    • 0023981046 scopus 로고
    • The role of work-inprocess inventory in serial production lines
    • Conway, R., Maxwell, W., McClain, J. O., and Thomas, L. J., 1988, The role of work-inprocess inventory in serial production lines. Operations Research, 36(2), 229-241.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    Mc Clain, J.O.3    Thomas, L.J.4
  • 7
    • 0025457839 scopus 로고
    • On the optimal allocation of servers and workloads in closed queueing networks
    • Dallery, Y., and Stecke, K. E., 1990, On the optimal allocation of servers and workloads in closed queueing networks. Operations Research, 38(4), 694-703.
    • (1990) Operations Research , vol.38 , Issue.4 , pp. 694-703
    • Dallery, Y.1    Stecke, K.E.2
  • 8
    • 0342292940 scopus 로고
    • Dynamic analysis of repetitive decision-free discrete-event processes: Applications to production systems
    • Dubois, D., and Stecke, K. E., 1990, Dynamic analysis of repetitive decision-free discrete-event processes: applications to production systems. Annals of Operations Research, 26, 323-347.
    • (1990) Annals of Operations Research , vol.26 , pp. 323-347
    • Dubois, D.1    Stecke, K.E.2
  • 9
    • 0002802279 scopus 로고
    • Periodic loading of flexible manufacturing systems
    • (Bordeaux, France: APMS
    • Erschler, J., Leveque, D., and Roubellat, F., 1982, Periodic loading of flexible manufacturing systems. Proceedings of the 1 FIP Congress, (Bordeaux, France: APMS) pp. 327-339.
    • (1982) Proceedings of the 1 FIP Congress , pp. 327-339
    • Erschler, J.1    Leveque, D.2    Roubellat, F.3
  • 10
    • 0001590283 scopus 로고
    • An inexact algorithm for part input sequencing with side constraints in FMS
    • Escudero, L. F., 1989, An inexact algorithm for part input sequencing with side constraints in FMS. International Journal of Flexible Manufacturing Systems, 1(2), 143-174.
    • (1989) International Journal of Flexible Manufacturing Systems , vol.1 , Issue.2 , pp. 143-174
    • Escudero, L.F.1
  • 11
    • 0042361286 scopus 로고
    • 3rd edition (Annandale, VA: Wolverine Software Corporation)
    • Henriksen, J. O., and Crain, R. C., 1988, GPSS/H User's Manual, 3rd edition (Annandale, VA: Wolverine Software Corporation).
    • (1988) GPSS/H User's Manual
    • Henriksen, J.O.1    Crain, R.C.2
  • 12
    • 0012219716 scopus 로고
    • Scheduling of flexible flow shops-II. Report No. LIDS-R-1049
    • Cambridge, MA: MIT)
    • Hitz, K. L., 1980, Scheduling of flexible flow shops-II. Report No. LIDS-R-1049, Laboratory for Information and Decision Systems, (Cambridge, MA: MIT).
    • (1980) Laboratory for Information and Decision Systems
    • Hitz, K.L.1
  • 13
    • 0004829780 scopus 로고
    • Part selection problems in flexible manufacturing systems planning stage
    • Ann Arbor, Ml, K. E. Stecke and R. Suri (eds.) (Amsterdam: Elsevier
    • Hwang, S., 1986, Part selection problems in flexible manufacturing systems planning stage. Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor, Ml, K. E. Stecke and R. Suri (eds.) (Amsterdam: Elsevier) pp. 297-309.
    • (1986) Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 297-309
    • Hwang, S.1
  • 14
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McCormick, S. T., Pinedo, M. L., and Wolf, B., 1988, Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 36(6), 925-935.
    • (1988) Operations Research , vol.36 , Issue.6 , pp. 925-935
    • Mc Cormick, S.T.1    Pinedo, M.L.2    Wolf, B.3
  • 15
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35(2), 192-207.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 192-207
    • Miltenburg, J.1
  • 16
    • 0001377662 scopus 로고
    • Part input into a flexible flow system: An evaluation of lookahead simulation and a fuzzy rule base
    • O’Keefe, R. M. and Rao, R., 1992, Part input into a flexible flow system: an evaluation of lookahead simulation and a fuzzy rule base. International Journal of Flexible Manufacturing Systems, 4(2), 113-127.
    • (1992) International Journal of Flexible Manufacturing Systems , vol.4 , Issue.2 , pp. 113-127
    • O’keefe, R.M.1    Rao, R.2
  • 17
    • 0002874558 scopus 로고
    • Formulation and heuristic solution for parts grouping and tool loading in flexible manufacturing systems
    • Ann Arbor, MI, K. E. Stecke and R. Suri (eds.) (Amsterdam: Elsevier
    • Rajagopalan, S., 1986, Formulation and heuristic solution for parts grouping and tool loading in flexible manufacturing systems. Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor, MI, K. E. Stecke and R. Suri (eds.) (Amsterdam: Elsevier) pp. 311-320.
    • (1986) Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 311-320
    • Rajagopalan, S.1
  • 19
    • 0023540194 scopus 로고
    • Using Mathematical Programming and Simulation to Study FMS Machine Utilizations
    • A. Thesen, H. Grant and W. D, Kelton, (eds.) (San Diego, CA: Society for Computer Simulation)
    • Schriber, T. J. and Stecke, K. E., 1987, Using Mathematical Programming and Simulation to Study FMS Machine Utilizations. Proceedings of the 1987 Winter Simulation Conference, A. Thesen, H. Grant and W. D, Kelton, (eds.) (San Diego, CA: Society for Computer Simulation).
    • (1987) Proceedings of the 1987 Winter Simulation Conference
    • Schriber, T.J.1    Stecke, K.E.2
  • 20
    • 3342981820 scopus 로고
    • Machine utilizations achieved using balanced FMS production ratios in a simulated setting
    • Schriber, T. J. and Stecke, K. E., 1988, Machine utilizations achieved using balanced FMS production ratios in a simulated setting. Annals of Operations Research, 15, 229-267.
    • (1988) Annals of Operations Research , vol.15 , pp. 229-267
    • Schriber, T.J.1    Stecke, K.E.2
  • 21
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke, K. E., 1983, Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29(3), 273-288.
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 22
    • 0026954929 scopus 로고
    • Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
    • Stecke, K. E., 1992, Procedures to determine part mix ratios for independent demands in flexible manufacturing systems. IEEE Transactions on Engineering Management, 39(4), 359-369.
    • (1992) IEEE Transactions on Engineering Management , vol.39 , Issue.4 , pp. 359-369
    • Stecke, K.E.1
  • 23
    • 0026954929 scopus 로고
    • Proeceures to determine part mix ratios for independent demands in flexible manufacturing systems
    • Stecke, K. E., 1992, Proeceures to determine part mix ratios for independent demands in flexible manufacturing systems. IEEE Transactions on Engineering Management, 39(4), 359-369.
    • (1992) IEEE Transactions on Engineering Management , vol.39 , Issue.4 , pp. 359-369
    • Stecke, K.E.1
  • 25
    • 0003019633 scopus 로고
    • A Study of FMS Part Type Selection Approaches for Short Term Production Planning
    • Stecke, K. E., and Kim, I., 1988, A Study of FMS Part Type Selection Approaches for Short Term Production Planning. International Journal of Flexible Manufacturing Systems, 1(1), 7-29.
    • (1988) International Journal of Flexible Manufacturing Systems , vol.1 , Issue.1 , pp. 7-29
    • Stecke, K.E.1    Kim, I.2
  • 26
    • 0024962451 scopus 로고
    • Performance evaluation for systems of pooled machines of unequal sizes: Unbalancing versus balancing
    • Stecke, K. E. and Kim, I., 1989, Performance evaluation for systems of pooled machines of unequal sizes: unbalancing versus balancing. European Journal of Operational Research, 42, 22-38.
    • (1989) European Journal of Operational Research , vol.42 , pp. 22-38
    • Stecke, K.E.1    Kim, I.2
  • 27
    • 0025894458 scopus 로고
    • A flexible approach to part type selection in flexible flow systems using part mix ratios
    • Stecke, K. E. and Kim, I., 1991, A flexible approach to part type selection in flexible flow systems using part mix ratios. International Journal of Production Research, 29(1), 53-75.
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 53-75
    • Stecke, K.E.1    Kim, I.2
  • 28
    • 0022097833 scopus 로고
    • The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues
    • Stecke, K. E. and Solberg, J. J., 1985, The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues. Operations Research, 33(4), 882-910.
    • (1985) Operations Research , vol.33 , Issue.4 , pp. 882-910
    • Stecke, K.E.1    Solberg, J.J.2
  • 29
    • 0025699778 scopus 로고
    • Scheduling batches on parallel machines with major and minor set-ups
    • Tang, C. S., 1990, Scheduling batches on parallel machines with major and minor set-ups. European Journal of Operational Research, 46(1), 28-37.
    • (1990) European Journal of Operational Research , vol.46 , Issue.1 , pp. 28-37
    • Tang, C.S.1
  • 30
    • 0000363915 scopus 로고
    • Sequential decision procedures for batching and balancing
    • Whitney, C. K., and Gaul, T. S., 1985, Sequential decision procedures for batching and balancing. Annals of Operations Research, 3, 301-316.
    • (1985) Annals of Operations Research , vol.3 , pp. 301-316
    • Whitney, C.K.1    Gaul, T.S.2
  • 31
    • 0022093184 scopus 로고
    • Scheduling Algorithms for Flexible Flow Lines
    • Wittrock, R. J., 1985, Scheduling Algorithms for Flexible Flow Lines. IBM Journal of Research and Development, 29(4), 401-412.
    • (1985) IBM Journal of Research and Development , vol.29 , Issue.4 , pp. 401-412
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.