메뉴 건너뛰기




Volumn 32, Issue 1, 2000, Pages 33-47

Loading algorithms for flexible manufacturing systems with partially grouped machines

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CELLULAR MANUFACTURING; COMPUTER SIMULATION; GROUP TECHNOLOGY; HEURISTIC METHODS; OPTIMIZATION; PROCESS ENGINEERING; RANDOM PROCESSES; RESOURCE ALLOCATION;

EID: 0033640418     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1007651329917     Document Type: Article
Times cited : (16)

References (31)
  • 1
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problem for flexible manufacturing systems
    • Stecke, K.E. (1983) Formulation and solution of nonlinear integer production planning problem for flexible manufacturing systems. Management Science, 26, 273-288.
    • (1983) Management Science , vol.26 , pp. 273-288
    • Stecke, K.E.1
  • 2
    • 33749946191 scopus 로고
    • The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues
    • Stecke, K.E. and Solberg, J.J. (1985) The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues. Operations Research, 29, 53-75.
    • (1985) Operations Research , vol.29 , pp. 53-75
    • Stecke, K.E.1    Solberg, J.J.2
  • 3
    • 0027543720 scopus 로고
    • A study on surrogate objectives for loading a certain type of flexible manufacturing systems
    • Kim, Y-D. (1993) A study on surrogate objectives for loading a certain type of flexible manufacturing systems. International Journal of Production Research, 31, 381-392.
    • (1993) International Journal of Production Research , vol.31 , pp. 381-392
    • Kim, Y.-D.1
  • 4
    • 0022794511 scopus 로고
    • A branch and bound approach for machine load balancing in flexible manufacturing systems
    • Berrada, M. and Stecke, K.E. (1986) A branch and bound approach for machine load balancing in flexible manufacturing systems. Management Science, 32, 1316-1335.
    • (1986) Management Science , vol.32 , pp. 1316-1335
    • Berrada, M.1    Stecke, K.E.2
  • 5
    • 0023416625 scopus 로고
    • A new formulation of operation assignment problem in flexible manufacturing systems: Mathematical modelling and computational experience
    • Lashkari, R.S., Dutta, S.P. and Padhye, A.M. (1987) A new formulation of operation assignment problem in flexible manufacturing systems: mathematical modelling and computational experience. International Journal of Production Research, 25, 1267-1283.
    • (1987) International Journal of Production Research , vol.25 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 6
    • 0024714612 scopus 로고
    • An alternative formulation of the operation assignment problem in flexible manufacturing systems
    • Wilson, J.M. (1989) An alternative formulation of the operation assignment problem in flexible manufacturing systems. International Journal of Production Research, 27, 1405-1412.
    • (1989) International Journal of Production Research , vol.27 , pp. 1405-1412
    • Wilson, J.M.1
  • 7
    • 0028516733 scopus 로고
    • A new branch and bound algorithm for loading problems in flexible manufacturing systems
    • Kim, Y-D. and Yanco, C.A. (1994) A new branch and bound algorithm for loading problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 6, 361382.
    • (1994) International Journal of Flexible Manufacturing Systems , vol.6 , pp. 361382
    • Kim, Y.-D.1    Yanco, C.A.2
  • 8
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • Shanker, K. and Tzen, Y.J.J. (1985) A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23, 579-595.
    • (1985) International Journal of Production Research , vol.23 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.J.2
  • 9
    • 0024673709 scopus 로고
    • Some solution methodologies for loading problems in a flexible manufacturing system
    • Shanker, K. and Srinivasula, A. (1989) Some solution methodologies for loading problems in a flexible manufacturing system. International Journal of Production Research, 27, 1019-1034.
    • (1989) International Journal of Production Research , vol.27 , pp. 1019-1034
    • Shanker, K.1    Srinivasula, A.2
  • 11
    • 0027342202 scopus 로고
    • A heuristic approach for loading problems in flexible manufacturing systems
    • Kim, Y-D. and Yano, C.A. (1993) A heuristic approach for loading problems in flexible manufacturing systems. HE Transactions, 25, 26-39.
    • (1993) HE Transactions , vol.25 , pp. 26-39
    • Kim, Y.-D.1    Yano, C.A.2
  • 12
    • 0000514078 scopus 로고
    • A heuristic algorithm for the loading problem in flexible manufacturing systems
    • Kuhn, H. (1995) A heuristic algorithm for the loading problem in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 7, 229-254.
    • (1995) International Journal of Flexible Manufacturing Systems , vol.7 , pp. 229-254
    • Kuhn, H.1
  • 13
    • 0032116504 scopus 로고    scopus 로고
    • Production planning for flexible flow systems with limited machine flexibility
    • Lee, H.F. and Stecke, K.E. (1998) Production planning for flexible flow systems with limited machine flexibility. HE Transactions, 30, 669-684.
    • (1998) HE Transactions , vol.30 , pp. 669-684
    • Lee, H.F.1    Stecke, K.E.2
  • 15
    • 0022676091 scopus 로고
    • A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
    • Stecke, K.E. (1986) A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems. European Journal of Operational Research, 24, 369-378.
    • (1986) European Journal of Operational Research , vol.24 , pp. 369-378
    • Stecke, K.E.1
  • 17
    • 33749875693 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin, S. and Chen, C.S. (1987) The machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 23, 579-595.
    • (1987) International Journal of Production Research , vol.23 , pp. 579-595
    • Sarin, S.1    Chen, C.S.2
  • 18
    • 0025644101 scopus 로고
    • Machine loading and alternative routing in a flexible manufacturing system
    • Brettauer, K.M. and Venkataramanan, M.M. (1990) Machine loading and alternative routing in a flexible manufacturing system. Computers and Industrial Engineering, 18, 341-350.
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 341-350
    • Brettauer, K.M.1    Venkataramanan, M.M.2
  • 19
    • 0025595213 scopus 로고
    • A methodological approach to the flexible-manufacturing-system batching, loading. and tool configuration problems
    • Co, H.C., Biermann, J.S. and Chen, S.K. (1990) A methodological approach to the flexible-manufacturing-system batching, loading. and tool configuration problems. International Journal of Production Research, 28, 2171-2186.
    • (1990) International Journal of Production Research , vol.28 , pp. 2171-2186
    • Co, H.C.1    Biermann, J.S.2    Chen, S.K.3
  • 20
    • 0025460582 scopus 로고
    • Joint consideration of grouping and loading problems in a flexible manufacturing system
    • Kumar, P., Tewari, N.K. and Singh, N. (1990) Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research, 28, 13451356.
    • (1990) International Journal of Production Research , vol.28 , pp. 13451356
    • Kumar, P.1    Tewari, N.K.2    Singh, N.3
  • 21
    • 0025418241 scopus 로고
    • A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system
    • Ram, B., Sarin, S. and Chen, C.S. (1990) A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 28, 637-645.
    • (1990) International Journal of Production Research , vol.28 , pp. 637-645
    • Ram, B.1    Sarin, S.2    Chen, C.S.3
  • 25
    • 0028499223 scopus 로고
    • Production planning decisions in flexible manufacturing systems with random material flows
    • Stecke, K.E. and Raman, N. (1994) Production planning decisions in flexible manufacturing systems with random material flows. HE Transactions, 26, 2-17.
    • (1994) HE Transactions , vol.26 , pp. 2-17
    • Stecke, K.E.1    Raman, N.2
  • 26
    • 0024071392 scopus 로고
    • Models arising from a flexible manufacturing machine, part II: Minimization of the number of switching instants
    • Tang, C.S. and Denardo, E.V. (1988) Models arising from a flexible manufacturing machine, part II: minimization of the number of switching instants. Operations Research, 36, 778-784.
    • (1988) Operations Research , vol.36 , pp. 778-784
    • Tang, C.S.1    Denardo, E.V.2
  • 27
  • 28
    • 0027608954 scopus 로고
    • An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems
    • Liang, M. and Dutta, S.P. (1993) An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. Eruopean Journal of Operational Research, 67, 387-404.
    • (1993) Eruopean Journal of Operational Research , vol.67 , pp. 387-404
    • Liang, M.1    Dutta, S.P.2
  • 29
    • 0032187951 scopus 로고    scopus 로고
    • Iterative procedures for multiperiod order selection and loading problems in flexible manufacturing systems
    • Lee, D-H. and Kirn, Y-D. (1998) Iterative procedures for multiperiod order selection and loading problems in flexible manufacturing systems. International Journal of Production Research, 36, 2653-2668.
    • (1998) International Journal of Production Research , vol.36 , pp. 2653-2668
    • Lee, D.-H.1    Kirn, Y.-D.2
  • 30
    • 33749928487 scopus 로고    scopus 로고
    • Scheduling algorithms for flexible manufacturing systems with partially grouped machines
    • Lee, D-H. and Kirn, Y-D. (1998) Scheduling algorithms for flexible manufacturing systems with partially grouped machines. Journal of Manufacturing Systems, (in press).
    • (1998) Journal of Manufacturing Systems, (In Press).
    • Lee, D.-H.1    Kirn, Y.-D.2
  • 31
    • 0031335798 scopus 로고    scopus 로고
    • Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems
    • Kim, Y-D. and Yano, C.A. (1997) Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems. International Journal of Production Research, 35, 3303-3322.
    • (1997) International Journal of Production Research , vol.35 , pp. 3303-3322
    • Kim, Y.-D.1    Yano, C.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.