-
1
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problem for flexible manufacturing systems
-
Stecke, K.E. (1983) Formulation and solution of nonlinear integer production planning problem for flexible manufacturing systems. Management Science, 26, 273-288.
-
(1983)
Management Science
, vol.26
, pp. 273-288
-
-
Stecke, K.E.1
-
2
-
-
33749946191
-
The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues
-
Stecke, K.E. and Solberg, J.J. (1985) The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues. Operations Research, 29, 53-75.
-
(1985)
Operations Research
, vol.29
, pp. 53-75
-
-
Stecke, K.E.1
Solberg, J.J.2
-
3
-
-
0027543720
-
A study on surrogate objectives for loading a certain type of flexible manufacturing systems
-
Kim, Y-D. (1993) A study on surrogate objectives for loading a certain type of flexible manufacturing systems. International Journal of Production Research, 31, 381-392.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 381-392
-
-
Kim, Y.-D.1
-
4
-
-
0022794511
-
A branch and bound approach for machine load balancing in flexible manufacturing systems
-
Berrada, M. and Stecke, K.E. (1986) A branch and bound approach for machine load balancing in flexible manufacturing systems. Management Science, 32, 1316-1335.
-
(1986)
Management Science
, vol.32
, pp. 1316-1335
-
-
Berrada, M.1
Stecke, K.E.2
-
5
-
-
0023416625
-
A new formulation of operation assignment problem in flexible manufacturing systems: Mathematical modelling and computational experience
-
Lashkari, R.S., Dutta, S.P. and Padhye, A.M. (1987) A new formulation of operation assignment problem in flexible manufacturing systems: mathematical modelling and computational experience. International Journal of Production Research, 25, 1267-1283.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1267-1283
-
-
Lashkari, R.S.1
Dutta, S.P.2
Padhye, A.M.3
-
6
-
-
0024714612
-
An alternative formulation of the operation assignment problem in flexible manufacturing systems
-
Wilson, J.M. (1989) An alternative formulation of the operation assignment problem in flexible manufacturing systems. International Journal of Production Research, 27, 1405-1412.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1405-1412
-
-
Wilson, J.M.1
-
7
-
-
0028516733
-
A new branch and bound algorithm for loading problems in flexible manufacturing systems
-
Kim, Y-D. and Yanco, C.A. (1994) A new branch and bound algorithm for loading problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 6, 361382.
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 361382
-
-
Kim, Y.-D.1
Yanco, C.A.2
-
8
-
-
0022060472
-
A loading and dispatching problem in a random flexible manufacturing system
-
Shanker, K. and Tzen, Y.J.J. (1985) A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23, 579-595.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.J.J.2
-
9
-
-
0024673709
-
Some solution methodologies for loading problems in a flexible manufacturing system
-
Shanker, K. and Srinivasula, A. (1989) Some solution methodologies for loading problems in a flexible manufacturing system. International Journal of Production Research, 27, 1019-1034.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1019-1034
-
-
Shanker, K.1
Srinivasula, A.2
-
10
-
-
0026914581
-
A heuristic procedure for loading problems in flexible manufacturing systems
-
Mukhopadhyay, S.K., Midha, S. and Murli Krishna, V. (1992) A heuristic procedure for loading problems in flexible manufacturing systems. International Journal of Production Research, 30, 2213-2228.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Murli Krishna, V.3
-
11
-
-
0027342202
-
A heuristic approach for loading problems in flexible manufacturing systems
-
Kim, Y-D. and Yano, C.A. (1993) A heuristic approach for loading problems in flexible manufacturing systems. HE Transactions, 25, 26-39.
-
(1993)
HE Transactions
, vol.25
, pp. 26-39
-
-
Kim, Y.-D.1
Yano, C.A.2
-
12
-
-
0000514078
-
A heuristic algorithm for the loading problem in flexible manufacturing systems
-
Kuhn, H. (1995) A heuristic algorithm for the loading problem in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 7, 229-254.
-
(1995)
International Journal of Flexible Manufacturing Systems
, vol.7
, pp. 229-254
-
-
Kuhn, H.1
-
13
-
-
0032116504
-
Production planning for flexible flow systems with limited machine flexibility
-
Lee, H.F. and Stecke, K.E. (1998) Production planning for flexible flow systems with limited machine flexibility. HE Transactions, 30, 669-684.
-
(1998)
HE Transactions
, vol.30
, pp. 669-684
-
-
Lee, H.F.1
Stecke, K.E.2
-
14
-
-
0002874558
-
Formulation and heuristic solutions for part grouping and tool loading in flexible manufacturing systems
-
Stecke, K. E. and Suri, R. (eds.), Eisevier, Amsterdam
-
Rajagopalan, S. (1986) Formulation and heuristic solutions for part grouping and tool loading in flexible manufacturing systems, in Proceedings of the Second ORSA/TIMS Conference of Flexible Manufacturing System: Operations Research Models and Applications, Stecke, K. E. and Suri, R. (eds.), Eisevier, Amsterdam, pp. 311-320.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference of Flexible Manufacturing System: Operations Research Models and Applications
, pp. 311-320
-
-
Rajagopalan, S.1
-
15
-
-
0022676091
-
A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
-
Stecke, K.E. (1986) A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems. European Journal of Operational Research, 24, 369-378.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 369-378
-
-
Stecke, K.E.1
-
17
-
-
33749875693
-
The machine loading and tool allocation problem in a flexible manufacturing system
-
Sarin, S. and Chen, C.S. (1987) The machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 23, 579-595.
-
(1987)
International Journal of Production Research
, vol.23
, pp. 579-595
-
-
Sarin, S.1
Chen, C.S.2
-
18
-
-
0025644101
-
Machine loading and alternative routing in a flexible manufacturing system
-
Brettauer, K.M. and Venkataramanan, M.M. (1990) Machine loading and alternative routing in a flexible manufacturing system. Computers and Industrial Engineering, 18, 341-350.
-
(1990)
Computers and Industrial Engineering
, vol.18
, pp. 341-350
-
-
Brettauer, K.M.1
Venkataramanan, M.M.2
-
19
-
-
0025595213
-
A methodological approach to the flexible-manufacturing-system batching, loading. and tool configuration problems
-
Co, H.C., Biermann, J.S. and Chen, S.K. (1990) A methodological approach to the flexible-manufacturing-system batching, loading. and tool configuration problems. International Journal of Production Research, 28, 2171-2186.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2171-2186
-
-
Co, H.C.1
Biermann, J.S.2
Chen, S.K.3
-
20
-
-
0025460582
-
Joint consideration of grouping and loading problems in a flexible manufacturing system
-
Kumar, P., Tewari, N.K. and Singh, N. (1990) Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research, 28, 13451356.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 13451356
-
-
Kumar, P.1
Tewari, N.K.2
Singh, N.3
-
21
-
-
0025418241
-
A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system
-
Ram, B., Sarin, S. and Chen, C.S. (1990) A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 28, 637-645.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 637-645
-
-
Ram, B.1
Sarin, S.2
Chen, C.S.3
-
24
-
-
0001407975
-
A framework for part type selection and scheduling in FMS environment
-
Tang, L.-L., Yih, Y. and Liu, C.-Y. (1995) A framework for part type selection and scheduling in FMS environment. International Journal of Computer Integrated Manufacturing, 8, 102-115.
-
(1995)
International Journal of Computer Integrated Manufacturing
, vol.8
, pp. 102-115
-
-
Tang, L.-L.1
Yih, Y.2
Liu, C.-Y.3
-
25
-
-
0028499223
-
Production planning decisions in flexible manufacturing systems with random material flows
-
Stecke, K.E. and Raman, N. (1994) Production planning decisions in flexible manufacturing systems with random material flows. HE Transactions, 26, 2-17.
-
(1994)
HE Transactions
, vol.26
, pp. 2-17
-
-
Stecke, K.E.1
Raman, N.2
-
26
-
-
0024071392
-
Models arising from a flexible manufacturing machine, part II: Minimization of the number of switching instants
-
Tang, C.S. and Denardo, E.V. (1988) Models arising from a flexible manufacturing machine, part II: minimization of the number of switching instants. Operations Research, 36, 778-784.
-
(1988)
Operations Research
, vol.36
, pp. 778-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
28
-
-
0027608954
-
An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems
-
Liang, M. and Dutta, S.P. (1993) An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. Eruopean Journal of Operational Research, 67, 387-404.
-
(1993)
Eruopean Journal of Operational Research
, vol.67
, pp. 387-404
-
-
Liang, M.1
Dutta, S.P.2
-
29
-
-
0032187951
-
Iterative procedures for multiperiod order selection and loading problems in flexible manufacturing systems
-
Lee, D-H. and Kirn, Y-D. (1998) Iterative procedures for multiperiod order selection and loading problems in flexible manufacturing systems. International Journal of Production Research, 36, 2653-2668.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2653-2668
-
-
Lee, D.-H.1
Kirn, Y.-D.2
-
30
-
-
33749928487
-
Scheduling algorithms for flexible manufacturing systems with partially grouped machines
-
Lee, D-H. and Kirn, Y-D. (1998) Scheduling algorithms for flexible manufacturing systems with partially grouped machines. Journal of Manufacturing Systems, (in press).
-
(1998)
Journal of Manufacturing Systems, (In Press).
-
-
Lee, D.-H.1
Kirn, Y.-D.2
-
31
-
-
0031335798
-
Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems
-
Kim, Y-D. and Yano, C.A. (1997) Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems. International Journal of Production Research, 35, 3303-3322.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 3303-3322
-
-
Kim, Y.-D.1
Yano, C.A.2
|