메뉴 건너뛰기




Volumn 39, Issue 4, 2001, Pages 689-708

Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING; SIMULATED ANNEALING;

EID: 0035836306     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540150504403     Document Type: Article
Times cited : (43)

References (31)
  • 2
    • 0030574668 scopus 로고    scopus 로고
    • An SA/TS mixture algorithm for the scheduling tardiness problem
    • Adenso-Diaz, B., 1996, An SA/TS mixture algorithm for the scheduling tardiness problem. European Journal of Operational Research, 88, 516-524.
    • (1996) European Journal of Operational Research , vol.88 , pp. 516-524
    • Adenso-Diaz, B.1
  • 3
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 4
    • 0026126118 scopus 로고
    • A computational study of job shop scheduling
    • Applegate, D. and Cook, W., 1991, A computational study of job shop scheduling. ORSA Journal of Computing, 3, 149-156.
    • (1991) ORSA Journal of Computing , vol.3 , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 5
    • 0002381223 scopus 로고
    • Machine sequencing via disjunctive graph: An implicit enumeration algorithm
    • Balas, E., 1969, Machine sequencing via disjunctive graph: an implicit enumeration algorithm. Operations Research, 17, 1-10.
    • (1969) Operations Research , vol.17 , pp. 1-10
    • Balas, E.1
  • 6
    • 0029288391 scopus 로고
    • Solving the job shop scheduling problem with tabu search
    • Barnes, J. W. and Chambers, J. B., 1995, Solving the job shop scheduling problem with tabu search. IIE Transactions, 27, 257-263.
    • (1995) IIE Transactions , vol.27 , pp. 257-263
    • Barnes, J.W.1    Chambers, J.B.2
  • 9
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
    • Brandimarte, P. and Calderini, M., 1995, A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research, 33, 161-181.
    • (1995) International Journal of Production Research , vol.33 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 11
    • 0000165767 scopus 로고
    • An algorithm for solving the job shop problem
    • Carlier, J. and Pinson, E., 1989, An algorithm for solving the job shop problem. Management Science, 35, 164-176.
    • (1989) Management Science , vol.35 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 13
    • 0024765468 scopus 로고
    • A bottleneck-based beam search for job scheduling in a flexible manufacturing system
    • Chang, Yih-Long, Matsuo, H. and Sullivan, R. S., 1989, A bottleneck-based beam search for job scheduling in a flexible manufacturing system. International Journal of Production Research, 27, 2209-2225.
    • (1989) International Journal of Production Research , vol.27 , pp. 2209-2225
    • Chang, Y.-L.1    Matsuo, H.2    Sullivan, R.S.3
  • 15
    • 34250074609 scopus 로고
    • Applying tabu search to job shop scheduling problem
    • Dell'Amico, M. and Trubian, M., 1993, Applying tabu search to job shop scheduling problem. Annals of Operations Research, 41, 231-252.
    • (1993) Annals of Operations Research , vol.41 , pp. 231-252
    • Dell'Amico, M.1    Trubian, M.2
  • 16
    • 0004215426 scopus 로고    scopus 로고
    • (Boston, MA: Kluwer Academic Publishers)
    • Glover, F. and Laguna, M., 1997, Tabu Search (Boston, MA: Kluwer Academic Publishers).
    • (1997) Tabu Search
    • Glover, F.1    Laguna, M.2
  • 17
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flowshop with separable setup and removal times
    • Gupta, J. N. D. and Tunc, E. A., 1994, Scheduling a two-stage hybrid flowshop with separable setup and removal times. European Journal of Operational Research, 77, 415-428.
    • (1994) European Journal of Operational Research , vol.77 , pp. 415-428
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 18
    • 0010844051 scopus 로고    scopus 로고
    • An exchange heuristic imbedded with simulated annealing for due-dates job shop scheduling
    • He, Z., Yang, T. and Tiger, A., 1996, An exchange heuristic imbedded with simulated annealing for due-dates job shop scheduling. European Journal of Operational Research, 91, 99-117.
    • (1996) European Journal of Operational Research , vol.91 , pp. 99-117
    • He, Z.1    Yang, T.2    Tiger, A.3
  • 19
  • 21
    • 0010842657 scopus 로고
    • A survey of priority rules for FMS scheduling and their performance for the benchmark problem
    • Moser, M. and Engell, S., 1992, A survey of priority rules for FMS scheduling and their performance for the benchmark problem. Proceedings of the 31st Conference on Decision and Control, pp. 392-397.
    • (1992) Proceedings of the 31st Conference on Decision and Control , pp. 392-397
    • Moser, M.1    Engell, S.2
  • 22
    • 0028585426 scopus 로고
    • Exploiting shop floor status information to schedule complex job shops
    • Ovacik, I. M. and Uzsoy, R., 1994, Exploiting shop floor status information to schedule complex job shops. Journal of Manufacturing Systems, 13, 73-84.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 73-84
    • Ovacik, I.M.1    Uzsoy, R.2
  • 23
    • 0025419819 scopus 로고
    • Modelling and scheduling of flexible manufacturing system
    • Sawik, T., 1990, Modelling and scheduling of flexible manufacturing system. European Journal of Operational Research, 45, 177-190.
    • (1990) European Journal of Operational Research , vol.45 , pp. 177-190
    • Sawik, T.1
  • 24
    • 0030241688 scopus 로고    scopus 로고
    • Flexible scheduling in a machining center through genetic algorithms
    • Sakawa, M., Kato, K. and Mori, T., 1996, Flexible scheduling in a machining center through genetic algorithms. Computers and Industrial Engineering, 30, 931-940.
    • (1996) Computers and Industrial Engineering , vol.30 , pp. 931-940
    • Sakawa, M.1    Kato, K.2    Mori, T.3
  • 25
    • 0030398342 scopus 로고    scopus 로고
    • Parallel machine scheduling with release dates, due dates and family setup times
    • Schutten, J. M. J. and Leussink, R. A. M. 1996, Parallel machine scheduling with release dates, due dates and family setup times. International Journal of Production Economics, 46-47, 119-125.
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 119-125
    • Schutten, J.M.J.1    Leussink, R.A.M.2
  • 26
    • 0030215229 scopus 로고    scopus 로고
    • Single-machine scheduling with release dates, due dates and family setup times
    • Schutten, J. M. J., van de Velde, S.-L. and Zijm, W. H. M., 1996, Single-machine scheduling with release dates, due dates and family setup times. Management Science, 42, 1165-1174.
    • (1996) Management Science , vol.42 , pp. 1165-1174
    • Schutten, J.M.J.1    Van De Velde, S.-L.2    Zijm, W.H.M.3
  • 27
    • 0010842658 scopus 로고
    • A due date based dispatching rule for flexible manufacturing systems
    • Stoeva, S. P., 1990, A due date based dispatching rule for flexible manufacturing systems. International Journal of Production Research, 28, 1991-1999.
    • (1990) International Journal of Production Research , vol.28 , pp. 1991-1999
    • Stoeva, S.P.1
  • 29
    • 0025894230 scopus 로고
    • Job shop scheduling with tool constraints: A tabu search approach
    • Widmer, M., 1991, Job shop scheduling with tool constraints: a tabu search approach. Journal of Operational Research Society, 42, 75-82.
    • (1991) Journal of Operational Research Society , vol.42 , pp. 75-82
    • Widmer, M.1
  • 30
    • 0028766747 scopus 로고
    • Preemptive scheduling with releases dates, delivery times and sequence independent setup times
    • Zdrzalka, S., 1994, Preemptive scheduling with releases dates, delivery times and sequence independent setup times. European Journal of Operational Research, 76, 60-71.
    • (1994) European Journal of Operational Research , vol.76 , pp. 60-71
    • Zdrzalka, S.1
  • 31
    • 0010771889 scopus 로고    scopus 로고
    • A sequencing problem with family setup times
    • Zdrzalka, S., 1996, A sequencing problem with family setup times. Discrete Applied Mathematics, 66, 161-183.
    • (1996) Discrete Applied Mathematics , vol.66 , pp. 161-183
    • Zdrzalka, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.