메뉴 건너뛰기




Volumn 139, Issue 11, 2013, Pages

Quantifying performance for the integrated project delivery system as compared to established delivery systems

Author keywords

Contracting; Innovative delivery methods; Integrated project delivery; Performance metrics

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; CONTRACTING; CONTRACTUAL AGREEMENTS; DELIVERY METHODS; FINANCIAL PERFORMANCE; INTEGRATED PROJECT DELIVERIES; PERFORMANCE METRICS;

EID: 84886568744     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000744     Document Type: Article
Times cited : (264)

References (31)
  • 2
    • 77954795877 scopus 로고    scopus 로고
    • American Institute of Architects. California Council, Sacramento, CA.
    • American Institute of Architects. (2010). Integrated project delivery: Case studies, California Council, Sacramento, CA.
    • (2010) Integrated Project Delivery: Case Studies
  • 3
    • 84886565081 scopus 로고    scopus 로고
    • American Institute of Architects. AIA Minnesota, School of Architecture, Univ. of Minnesota, Minneapolis.
    • American Institute of Architects. (2011). " IPD case studies." AIA Minnesota, School of Architecture, Univ. of Minnesota, Minneapolis.
    • (2011) IPD Case Studies
  • 5
    • 84886557752 scopus 로고    scopus 로고
    • How to compute a firm's incidence rate for safety management
    • Bureau of Labor Statistics (BLS) (Oct. 20, 2011).
    • Bureau of Labor Statistics (BLS). (2012). " How to compute a firm's incidence rate for safety management." Injuries, illnesses and fatalities, 〈 http://www.bls.gov/iif/osheval.htm ⌠(Oct. 20, 2011).
    • (2012) Injuries, Illnesses and Fatalities
  • 6
    • 0242434228 scopus 로고    scopus 로고
    • Framework of success criteria for design/build projects
    • JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(2002)18:3(120)
    • Chan, A. P. C., Scott, D., and, Lam, E. W. M. (2002). " Framework of success criteria for design/build projects." J. Constr. Eng. Manage., 18 (3), 120-128. JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(2002)18:3(120)
    • (2002) J. Constr. Eng. Manage. , vol.18 , Issue.3 , pp. 120-128
    • Chan, A.P.C.1    Scott, D.2    Lam, E.W.M.3
  • 7
    • 84987961001 scopus 로고    scopus 로고
    • Last planner and integrated project delivery
    • 1555-1369
    • Cho, S., and, Ballard, G. (2011). " Last planner and integrated project delivery." Lean Constr. J., 67-78. 1555-1369
    • (2011) Lean Constr. J. , pp. 67-78
    • Cho, S.1    Ballard, G.2
  • 11
    • 84886452043 scopus 로고    scopus 로고
    • Construction Users Roundtable (CURT). " Collaboration, integrated information and the project lifecycle in building design, construction and operation
    • Cincinnati, OH
    • Construction Users Roundtable (CURT). (2004). " Collaboration, integrated information and the project lifecycle in building design, construction and operation." WP-1202, Cincinnati, OH.
    • (2004) WP-1202
  • 12
    • 84886500895 scopus 로고    scopus 로고
    • Construction strategy: CURT's path toward LEAN project delivery
    • Construction Users Roundtable (CURT)
    • Construction Users Roundtable (CURT). (2007). " Construction strategy: CURT's path toward LEAN project delivery." WP-1004A.
    • (2007) WP-1004A
  • 13
    • 33750116999 scopus 로고    scopus 로고
    • Construction delivery systems: A comparative analysis of their performance within school districts
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:11(1131)
    • Debella, D. C., and, Ries, R. (2006). " Construction delivery systems: A comparative analysis of their performance within school districts." J. Constr. Eng. Manage., 132 (11), 1131-1138. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:11(1131)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.11 , pp. 1131-1138
    • Debella, D.C.1    Ries, R.2
  • 14
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2003)129:4(382)
    • Ibbs, C. W., Kwak, Y. H., Ng, T., and, Odabasi, A. M. (2003). " Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 129 (4), 382-387. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2003)129:4(382)
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Odabasi, A.M.4
  • 15
    • 77955332881 scopus 로고    scopus 로고
    • Understanding construction industry experience and attitudes toward integrated project delivery
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000188
    • Kent, D. C., and, Becerik-Gerber, B. (2010). " Understanding construction industry experience and attitudes toward integrated project delivery." J. Constr. Eng. Manage., 136 (8), 815-825. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000188
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.8 , pp. 815-825
    • Kent, D.C.1    Becerik-Gerber, B.2
  • 16
    • 77955327823 scopus 로고    scopus 로고
    • Piloting evaluation metrics for sustainable high-performance building project delivery
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
    • Korkmaz, S., Riley, D., and, Horman, M. (2010). " Piloting evaluation metrics for sustainable high-performance building project delivery." J. Constr. Eng. Manage., 136 (8), 877-885. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.8 , pp. 877-885
    • Korkmaz, S.1    Riley, D.2    Horman, M.3
  • 18
    • 84874473983 scopus 로고    scopus 로고
    • Integrated project delivery: An example of relational contracting
    • 1555-1369
    • Matthews, O., and, Howell, G. A. (2005). " Integrated project delivery: An example of relational contracting." Lean Constr. J., 2 (1), 46-61. 1555-1369
    • (2005) Lean Constr. J. , vol.2 , Issue.1 , pp. 46-61
    • Matthews, O.1    Howell, G.A.2
  • 19
    • 33751274213 scopus 로고    scopus 로고
    • Quantitative measurement of successful performance from the project manager's perspective
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:12(1284)
    • Menches, C. L., and, Hanna, A. S. (2006). " Quantitative measurement of successful performance from the project manager's perspective." J. Constr. Eng. Manage, 132 (12), 1284-1293. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2006)132:12(1284)
    • (2006) J. Constr. Eng. Manage , vol.132 , Issue.12 , pp. 1284-1293
    • Menches, C.L.1    Hanna, A.S.2
  • 21
    • 84886558926 scopus 로고    scopus 로고
    • Toward use of key performance indicators in highway design and construction
    • Washington, DC.
    • Molenaar, K. R., and, Navarro, D. (2011). " Toward use of key performance indicators in highway design and construction." Transportation Research Board 90th Annual Meeting, Washington, DC.
    • (2011) Transportation Research Board 90th Annual Meeting
    • Molenaar, K.R.1    Navarro, D.2
  • 22
    • 0033101744 scopus 로고    scopus 로고
    • Public-sector design/build evolution and performance
    • JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(1999)15:2(54)
    • Molenaar, K. R., Songer, A. D., and, Barash, M. (1999). " Public-sector design/build evolution and performance." J. Constr. Eng. Manage., 15 (2), 54-62. JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(1999)15:2(54)
    • (1999) J. Constr. Eng. Manage. , vol.15 , Issue.2 , pp. 54-62
    • Molenaar, K.R.1    Songer, A.D.2    Barash, M.3
  • 25
    • 84886564174 scopus 로고    scopus 로고
    • Pioneers push paradigm shift
    • McGrawHill
    • Post, N. (2011). " Pioneers push paradigm shift." Engineering News Record, McGrawHill.
    • (2011) Engineering News Record
    • Post, N.1
  • 27
    • 43949099303 scopus 로고    scopus 로고
    • Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(387)
    • Rojas, E. M., and, Kell, I. (2008). " Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools." J. Constr. Eng. Manage., 134 (6), 387-397. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(387)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.6 , pp. 387-397
    • Rojas, E.M.1    Kell, I.2
  • 29
    • 0030282253 scopus 로고    scopus 로고
    • Selecting design-build: Public and private sector owner attitudes
    • JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(1996)12:6(47)
    • Songer, A. D., and, Molenaar, K. R. (1996). " Selecting design-build: Public and private sector owner attitudes." J. Constr. Eng. Manage., 12 (6), 47-53. JCEMD4 0733-9364 10.1061/(ASCE)0742-597X(1996)12:6(47)
    • (1996) J. Constr. Eng. Manage. , vol.12 , Issue.6 , pp. 47-53
    • Songer, A.D.1    Molenaar, K.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.