Volumn 2011, Issue , 2011, Pages 67-73

Last planner and integrated project delivery

Author keywords

Integrated project delivery; Last planner; Lean construction; Survey

Indexed keywords

PROJECT MANAGEMENT; SURVEYING; SURVEYS;

EID: 84987961001     PISSN: None     EISSN: 15551369     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (38)

References (19)
  • 1
    • 0035641671 scopus 로고    scopus 로고
    • Measurement validity: A shared standard for qualitative and quantitative research
    • Adcock, R., and Collier, D. (2001). Measurement validity: A shared standard for qualitative and quantitative research. American Political Science Review, 95(3).
    • (2001) American Political Science Review , vol.95 , Issue.3
    • Adcock, R.1    Collier, D.2
  • 2
    • 24544443628 scopus 로고    scopus 로고
    • The impact of project planning and Performance on project outcomes
    • Chile, October
    • Alarcon, L. F., and Cruz, J. C. (1997). “The impact of project planning and Performance on project outcomes”, Tenth World Productivity Congress. Santiago, Chile, October
    • (1997) Tenth World Productivity Congress. Santiago
    • Alarcon, L.F.1    Cruz, J.C.2
  • 3
    • 0036932457 scopus 로고    scopus 로고
    • Contributors to Lead time in Construction Supply Chains: Case of Pipe Supports used in power Plants.
    • Sandiego, CA, USA, Dec 8-11
    • Arbulu, R., Tommelein, I., Walsh, K., and Hershauer, J. (2002). “Contributors to Lead time in Construction Supply Chains: Case of Pipe Supports used in power Plants.” Proceedings of the 2002 Winter Simulation Conference. Sandiego, CA, USA, Dec 8-11
    • (2002) Proceedings of the 2002 Winter Simulation Conference
    • Arbulu, R.1    Tommelein, I.2    Walsh, K.3    Hershauer, J.4
  • 4
    • 0004011301 scopus 로고    scopus 로고
    • The last planner system of production control
    • Univ. of Birmingham, UK, 26 Mar 02010
    • Ballard, G. (2000). “The last planner system of production control” PhD. Diss. School of Civil Eng., Univ. of Birmingham, UK. Available at www.leanconstruction.org (26 Mar 02010)
    • (2000) Diss. School of Civil Eng
    • Ballard, G.1
  • 5
    • 84866126262 scopus 로고    scopus 로고
    • Rethinking project definition in terms of target costing
    • International Group for Lean Construction, Santiago, Chile
    • th annual conference, International Group for Lean Construction, Santiago, Chile.
    • (2006) th Annual Conference
    • Ballard, G.1
  • 7
    • 0001660022 scopus 로고    scopus 로고
    • Lean Construction Tools and Techniques
    • In Rick Best and Gerard De Valenche, Woburn, MA: Elsevier Science
    • Ballard, G., Iris Tommelein, Lauri Koskela, and Greg Howel (2002). “Lean Construction Tools and Techniques”, In Rick Best and Gerard De Valenche (Eds), Design and Construction building in Value. Woburn, MA: Elsevier Science. Pp. 227-255
    • (2002) Design and Construction Building in Value , pp. 227-255
    • Ballard, G.1    Tommelein, I.2    Koskela, L.3    Howel, G.4
  • 8
    • 67349244749 scopus 로고    scopus 로고
    • An update on last planner.
    • BlacKsburg, VA, USA
    • th, BlacKsburg, VA, USA, July 2003, pp. 329-341.
    • (2003) th , pp. 329-341
    • Ballard, G.1    Howell, G.2
  • 9
    • 84987619052 scopus 로고    scopus 로고
    • Competing Construction Management Paradigms
    • Ballard, G and Gregory A. Howell (2004). “Competing Construction Management Paradigms”, Lean Construction Journal, 1(1)38-45.
    • (2004) Lean Construction Journal , vol.1 , Issue.1 , pp. 38-45
    • Ballard, G.1    Howell, G.A.2
  • 10
    • 0003886750 scopus 로고    scopus 로고
    • The social research methods-qualitative and quantitative approaches
    • CA: Sage publication
    • Bernard, R. (2000). The social research methods-qualitative and quantitative approaches. CA: Sage publication. Lean Construction Journal 2011 page 77 www.leanconstructionjournal.orghttp://creativecommons.org/licenses/by nc-nd/3.0/
    • (2000) Lean Construction Journal , pp. 77
    • Bernard, R.1
  • 13
    • 78649271961 scopus 로고    scopus 로고
    • Construction Management Association of America, 9 Jan 2011
    • Chuck Thomson, Joel Darrington, Dennis Dunne, and Will Lichtig (2009). Managing Integrated Project Delivery. Construction Management Association of America Available at http://cmaanet.org/files/shared/ng_Integrated_Project_Delivery__11-19-09__2_.pdf (9 Jan 2011)
    • (2009) Managing Integrated Project Delivery
    • Thomson, C.1    Darrington, J.2    Dunne, D.3    Lichtig, W.4
  • 14
    • 77954795877 scopus 로고    scopus 로고
    • American Institute of Architects California Council, Sacramento, CA, USA
    • Cohen, Jonathan and FAIA (2010). Integrated Project Delivery: Case studies. American Institute of Architects California Council, Sacramento, CA, USA.
    • (2010) Integrated Project Delivery: Case Studies
    • Cohen, J.1
  • 16
    • 24944588677 scopus 로고    scopus 로고
    • Nested analysis as a mixed method strategy for comparative research
    • Lieberman E. (2005). Nested analysis as a mixed method strategy for comparative research. American Political Science review, 99(3)
    • (2005) American Political Science Review , vol.99 , Issue.3
    • Lieberman, E.1
  • 17
    • 84856640817 scopus 로고    scopus 로고
    • Improving Labor Productivity Through Production Control.
    • IGLC 16, 16-18 July, Manchester, UK
    • Liu, M., and Ballard, G. (2008). “Improving Labor Productivity Through Production Control.” Proc 16th Ann. Conf. Int’l Group of Lean Constr., IGLC 16, 16-18 July, Manchester, UK.
    • (2008) Proc 16Th Ann. Conf. Int’l Group of Lean Constr
    • Liu, M.1    Ballard, G.2
  • 18
    • 84855776190 scopus 로고    scopus 로고
    • 10
    • National Association of State Facility Association (NASFA), Construction Owners Association of America, Association of Higher Education Facilities Officers, Associated General Contractors in America, and American Institutes of Architects (2010a). “Integrated Project Delivery for Public and Private Owners” Available at thttp://www.agc.org/galleries/pro%jectd/IPD%20for%20Public%20and%20Private%20Oweners.pdf (10 Jan 2010)
    • (2010) Integrated Project Delivery for Public and Private Owners


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.