메뉴 건너뛰기




Volumn 26, Issue 2, 2012, Pages 183-190

RFID and CCTV-based material delivery monitoring for cable-stayed bridge construction

Author keywords

Cable stayed bridge; Database; Image; Material delivery; Radio frequency identification (RFID)

Indexed keywords

COMPLEX PROCESSES; COMPLEX STRUCTURAL COMPONENTS; CONSTRUCTION ENGINEERS; EFFECTIVE MANAGEMENT; FIELD ENGINEERS; IMAGE; IMAGE DATA; LARGE SCALE INFRASTRUCTURES; MONITORING SYSTEM; RADIO FREQUENCIES; RADIO FREQUENCY IDENTIFICATION TECHNOLOGY; RFID TECHNOLOGY; SERVER DATABASE; STRUCTURAL COMPONENT; SYSTEMATIC MANAGEMENT;

EID: 84859540968     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000134     Document Type: Article
Times cited : (22)

References (19)
  • 1
    • 0036028115 scopus 로고    scopus 로고
    • Integrating barcode and GIS for monitoring construction progress
    • DOI 10.1016/S0926-5805(01)00043-7, PII S0926580501000437
    • Cheng, M.-Y., and Chen, J.-C. (2002). Integrating barcode and GIS for monitoring construction progress. Autom. Constr., 11 (1), 23-33. 0926-5805 10.1016/S0926-5805(01)00043-7 (Pubitemid 32833463)
    • (2002) Automation in Construction , vol.11 , Issue.1 , pp. 23-33
    • Cheng, M.-Y.1    Chen, J.-C.2
  • 2
    • 39349114541 scopus 로고    scopus 로고
    • RFID+4D CAD for progress management of structural steel works in high-rise buildings
    • DOI 10.1061/(ASCE)0887-3801(2008)22:2(74)
    • Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). RFID+4D CAD for progress management of structural steel works in high-rise buildings. J. Comput. Civ. Eng., 22 (2), 74-89. 0887-3801 10.1061/(ASCE)0887-3801(2008)22:2(74) (Pubitemid 351264006)
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.1    Yoon, S.2    Choi, C.3    Cho, C.4
  • 3
    • 65249088014 scopus 로고    scopus 로고
    • Model for the 3D location of buried assets based on RFID technology
    • 0887-3801 10.1061/(ASCE)0887-3801(2009)23:3(148)
    • Dziadak, K., Kumar, B., and Sommerville, J. (2009). Model for the 3D location of buried assets based on RFID technology. J. Comput. Civ. Eng., 23 (3), 148-159. 0887-3801 10.1061/(ASCE)0887-3801(2009)23:3(148)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.3 , pp. 148-159
    • Dziadak, K.1    Kumar, B.2    Sommerville, J.3
  • 4
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
    • DOI 10.1016/j.autcon.2006.07.004, PII S0926580506000574
    • Ergen, E., Akinci, B., and Sacks, R. (2007). Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS. Autom. Constr., 16 (3), 354-367. 0926-5805 10.1016/j.autcon.2006.07.004 (Pubitemid 46205287)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 5
    • 42649086755 scopus 로고    scopus 로고
    • Assessing residual value of heavy construction equipment using predictive data mining model
    • DOI 10.1061/(ASCE)0887-3801(2008)22:3(181)
    • Fan, H., AbouRizk, S., Kim, H., and Zaiane, O. (2008). Assessing residual value of heavy construction equipment using predictive data mining model. J. Comput. Civ. Eng., 22 (3), 181-191. 0887-3801 10.1061/(ASCE)0887-3801(2008)22: 3(181) (Pubitemid 351598725)
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.3 , pp. 181-191
    • Fan, H.1    AbouRizk, S.2    Kim, H.3    Zaiane, O.4
  • 6
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • 0887-3801 10.1061/(ASCE)0887-3801(2009)23:6(391)
    • Golparvar-Fard, M., Pea-Mora, F., Arboleda, C. A., and Lee, S. (2009). Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. J. Comput. Civ. Eng., 23 (6), 391-404. 0887-3801 10.1061/(ASCE)0887-3801(2009)23:6(391)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.6 , pp. 391-404
    • Golparvar-Fard, M.1    Pea-Mora, F.2    Arboleda, C.A.3    Lee, S.4
  • 7
    • 33644672678 scopus 로고    scopus 로고
    • The application of active radio frequency identification technology for tool tracking on construction job sites
    • DOI 10.1016/j.autcon.2005.06.004, PII S0926580505000695
    • Goodrum, P. M., McLaren, M. A., and Durfee, A. (2006). The application of active radio frequency identification technology for tool tracking on construction job sites. Autom. Constr., 15 (3), 292-302. 0926-5805 10.1016/j.autcon.2005.06.004 (Pubitemid 43332713)
    • (2006) Automation in Construction , vol.15 , Issue.3 , pp. 292-302
    • Goodrum, P.M.1    McLaren, M.A.2    Durfee, A.3
  • 8
    • 85039444848 scopus 로고    scopus 로고
    • Wireless LAN medium access control (MAC) and physical layer (PHY) specifications
    • IEEE. . 802.11-2007, New York.
    • IEEE. (2007). Wireless LAN medium access control (MAC) and physical layer (PHY) specifications. IEEE 802.11-2007, New York.
    • (2007) IEEE
  • 10
    • 41749109303 scopus 로고    scopus 로고
    • Using a real-time integrated communication system to monitor the progress and quality of construction works
    • 0926-5805 10.1016/j.autcon.2008.02.003
    • Leung, S.-W., Mak, S., and Lee, B. L. P. (2008). Using a real-time integrated communication system to monitor the progress and quality of construction works. Autom. Constr., 17 (6), 749-757. 0926-5805 10.1016/j.autcon.2008.02.003
    • (2008) Autom. Constr. , vol.17 , Issue.6 , pp. 749-757
    • Leung, S.-W.1    Mak, S.2    Lee, B.L.P.3
  • 11
    • 34147106608 scopus 로고    scopus 로고
    • Positioning and tracking construction vehicles in highly dense urban areas and building construction sites
    • DOI 10.1016/j.autcon.2006.11.001, PII S092658050600118X
    • Lu, M., Chen, W., Shen, X., Lam, H.-C., and Liu, J. (2007). Positioning and tracking construction vehicles in highly dense urban areas and building construction sites. Autom. Constr., 16 (5), 647-656. 0926-5805 10.1016/j.autcon.2006.11.001 (Pubitemid 46575192)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 647-656
    • Lu, M.1    Chen, W.2    Shen, X.3    Lam, H.-C.4    Liu, J.5
  • 12
    • 73349132668 scopus 로고    scopus 로고
    • Effective monitoring of the concrete pouring operation in an RFID-based environment
    • 0887-3801 10.1061/(ASCE)CP.1943-5487.0000004
    • Moon, S., and Yang, B. (2010). Effective monitoring of the concrete pouring operation in an RFID-based environment. J. Comput. Civ. Eng., 24 (1), 108-116. 0887-3801 10.1061/(ASCE)CP.1943-5487.0000004
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 108-116
    • Moon, S.1    Yang, B.2
  • 13
    • 70350053404 scopus 로고    scopus 로고
    • Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction
    • 0733-9364 10.1061/(ASCE)CO.1943-7862.0000101
    • Park, T., Kim, M. K., Kim, C., and Kim, H. (2009). Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. J. Constr. Eng. Manage., 135 (11), 1261-1270. 0733-9364 10.1061/(ASCE)CO.1943-7862. 0000101
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.11 , pp. 1261-1270
    • Park, T.1    Kim, M.K.2    Kim, C.3    Kim, H.4
  • 14
    • 44149083743 scopus 로고    scopus 로고
    • Application of information technology for mass customization in the housing construction industry in Korea
    • 0926-5805 10.1016/j.autcon.2008.02.010
    • Shin, Y., An, S.-H., Cho, H.-H., Kim, G.-H., and Kang, K.-I. (2008). Application of information technology for mass customization in the housing construction industry in Korea. Autom. Constr., 17 (7), 831-838. 0926-5805 10.1016/j.autcon.2008.02.010
    • (2008) Autom. Constr. , vol.17 , Issue.7 , pp. 831-838
    • Shin, Y.1    An, S.-H.2    Cho, H.-H.3    Kim, G.-H.4    Kang, K.-I.5
  • 15
    • 33747373317 scopus 로고    scopus 로고
    • Tracking the location of materials on construction job sites
    • 0733-9364 10.1061/(ASCE)0733-9364(2006)132:9(911)
    • Song, J., Haas, C. T., and Caldas, C. (2006). Tracking the location of materials on construction job sites. J. Constr. Eng. Manage., 132 (9), 911-918. 0733-9364 10.1061/(ASCE)0733-9364(2006)132:9(911)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.9 , pp. 911-918
    • Song, J.1    Haas, C.T.2    Caldas, C.3
  • 16
    • 58149259941 scopus 로고    scopus 로고
    • Methodology for automating the identification and localization of construction components on industrial projects
    • 0887-3801 10.1061/(ASCE)0887-3801(2009)23:1(3)
    • Torrent, D. G., and Caldas, C. H. (2009). Methodology for automating the identification and localization of construction components on industrial projects. J. Comput. Civ. Eng., 23 (1), 3-13. 0887-3801 10.1061/(ASCE)0887- 3801(2009)23:1(3)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.1 , pp. 3-13
    • Torrent, D.G.1    Caldas, C.H.2
  • 17
    • 73349118434 scopus 로고    scopus 로고
    • Object recognition in construction-site images Using 3D CAD-based filtering
    • 0887-3801 10.1061/(ASCE)0887-3801(2010)24:1(56)
    • Wu, Y., Kim, H., Kim, C., and Han, S. H. (2010). Object recognition in construction-site images Using 3D CAD-based filtering. J. Comput. Civ. Eng., 24 (1), 56-64. 0887-3801 10.1061/(ASCE)0887-3801(2010)24:1(56)
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 56-64
    • Wu, Y.1    Kim, H.2    Kim, C.3    Han, S.H.4
  • 18
    • 58949088479 scopus 로고    scopus 로고
    • Automating progress measurement of construction projects
    • 0926-5805 10.1016/j.autcon.2008.09.004
    • Zhang, X., (2009). Automating progress measurement of construction projects. Autom. Constr., 18 (3), 294-301. 0926-5805 10.1016/j.autcon.2008.09. 004
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 294-301
    • Zhang, X.1
  • 19
    • 34250683114 scopus 로고    scopus 로고
    • Using hue, saturation, and value color space for hydraulic excavator idle time analysis
    • DOI 10.1061/(ASCE)0887-3801(2007)21:4(238)
    • Zou, J., and Kim, H. (2007). Using hue, saturation, and value color space for hydraulic excavator idle time analysis. J. Comput. Civ. Eng., 21 (4), 238-246. 0887-3801 10.1061/(ASCE)0887-3801(2007)21:4(238) (Pubitemid 46935005)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.4 , pp. 238-246
    • Zou, J.1    Kim, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.