메뉴 건너뛰기




Volumn 35, Issue , 2013, Pages 79-88

Automated construction sequencing and scheduling from functional requirements

Author keywords

Automated sequencing; Construction requirements; Functional requirements; Schedule generation; Sequencing logics

Indexed keywords

AUTOMATED SEQUENCING; CONSTRUCTION REQUIREMENTS; FUNCTIONAL REQUIREMENT; SCHEDULE GENERATION; SEQUENCING LOGICS;

EID: 84884499753     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2013.03.002     Document Type: Article
Times cited : (33)

References (26)
  • 3
    • 0034250305 scopus 로고    scopus 로고
    • Constraint-directed techniques for scheduling alternative activities
    • J.C. Beck, and M.S. Fox Constraint-directed techniques for scheduling alternative activities Artificial Intelligence 121 1-2 2000 211 250
    • (2000) Artificial Intelligence , vol.121 , Issue.12 , pp. 211-250
    • Beck, J.C.1    Fox, M.S.2
  • 5
    • 0036182335 scopus 로고    scopus 로고
    • A constraint-based method for project scheduling with time windows
    • DOI 10.1023/A:1013617802515
    • A. Cesta, A. Oddi, and S.F. Smith A constraint-based method for project scheduling with time windows Journal of Heuristics 8 1 2002 109 136 (Pubitemid 34172765)
    • (2002) Journal of Heuristics , vol.8 , Issue.1 , pp. 109-136
    • Cesta, A.1    Oddi, A.2    Smith, S.F.3
  • 7
    • 79955393962 scopus 로고    scopus 로고
    • PDM++: Planning framework from a construction requirements perspective
    • D.K.H. Chua, and K.W. Yeoh PDM++: planning framework from a construction requirements perspective Journal of Construction Engineering and Management 137 4 2011 266 274
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.4 , pp. 266-274
    • Chua, D.K.H.1    Yeoh, K.W.2
  • 9
    • 0034271995 scopus 로고    scopus 로고
    • Constraint propagation techniques for the disjunctive scheduling problem
    • U. Dorndorf, E. Pesch, and T. Phan-Huy Constraint propagation techniques for the disjunctive scheduling problem Artificial Intelligence 122 1 2000 189 240
    • (2000) Artificial Intelligence , vol.122 , Issue.1 , pp. 189-240
    • Dorndorf, U.1    Pesch, E.2    Phan-Huy, T.3
  • 10
    • 5244300270 scopus 로고    scopus 로고
    • Parametric constraint management in planning and scheduling: Computational basis
    • H. El-Bibany Parametric constraint management in planning and scheduling: computational basis Journal of Construction Engineering and Management 123 3 1997 348 353 (Pubitemid 127590576)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 348-353
    • El-Bibany, H.1
  • 11
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(18)
    • K. El-Rayes, and O. Moselhi Optimizing resource utilization for repetitive construction projects Journal of Construction Engineering and Management 127 1 2001 18 27 (Pubitemid 32158955)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 12
    • 0034848857 scopus 로고    scopus 로고
    • Institute of Electrical and Electronics Engineers Inc. Arlington, VA, United States
    • M.P.J. Fromherz Constraint-Based Scheduling vol. 4 2001 Institute of Electrical and Electronics Engineers Inc. Arlington, VA, United States 3231 3244
    • (2001) Constraint-Based Scheduling , vol.4 VOL. , pp. 3231-3244
    • Fromherz, M.P.J.1
  • 14
    • 4243532938 scopus 로고
    • Constraint logic programming: A survey
    • (Copyright 1994, IEE)
    • J. Jaffar, and M.J. Maher Constraint logic programming: a survey Journal of Logic Programming 19-20 1994 503 581 (Copyright 1994, IEE)
    • (1994) Journal of Logic Programming , vol.19-20 , pp. 503-581
    • Jaffar, J.1    Maher, M.J.2
  • 15
    • 47749155626 scopus 로고    scopus 로고
    • Automated generation of construction plans from primitive geometries
    • M. Kataoka Automated generation of construction plans from primitive geometries Journal of Construction Engineering and Management 134 8 2008 592 600
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.8 , pp. 592-600
    • Kataoka, M.1
  • 16
    • 0026142701 scopus 로고
    • Device representation-The significance of functional knowledge
    • A.M. Keuneke Device representation-the significance of functional knowledge IEEE Expert 6 2 1991 22 25
    • (1991) IEEE Expert , vol.6 , Issue.2 , pp. 22-25
    • Keuneke, A.M.1
  • 17
    • 0037302545 scopus 로고    scopus 로고
    • Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
    • P. Laborie Algorithms for propagating resource constraints in AI planning and scheduling: existing approaches and new results Artificial Intelligence 143 2 2003 151 188
    • (2003) Artificial Intelligence , vol.143 , Issue.2 , pp. 151-188
    • Laborie, P.1
  • 20
    • 33751284023 scopus 로고    scopus 로고
    • Modeling of functional construction requirements for constructability analysis
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1314), 006612QCO
    • Y. Song, and D.K.H. Chua Modeling of functional construction requirements for constructability analysis Journal of Construction Engineering and Management 132 12 2006 1314 1326 (Pubitemid 44794271)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1314-1326
    • Song, Y.1    Chua, D.K.H.2
  • 21
    • 0242334187 scopus 로고    scopus 로고
    • Efficient solution techniques for disjunctive temporal reasoning problems
    • I. Tsamardinos, and M.E. Pollack Efficient solution techniques for disjunctive temporal reasoning problems Artificial Intelligence 151 1-2 2003 43 89
    • (2003) Artificial Intelligence , vol.151 , Issue.12 , pp. 43-89
    • Tsamardinos, I.1    Pollack, M.E.2
  • 24
    • 33749826089 scopus 로고    scopus 로고
    • Generation of a construction planning from a 3D CAD model
    • DOI 10.1016/j.autcon.2005.10.010, PII S0926580505001548
    • B.d. Vries, and J.M.J. Harink Generation of a construction planning from a 3D CAD model Automation in Construction 16 1 2007 13 18 (Pubitemid 44559739)
    • (2007) Automation in Construction , vol.16 , Issue.1 , pp. 13-18
    • De Vries, B.1    Harink, J.M.J.2
  • 25
    • 84867655196 scopus 로고    scopus 로고
    • Constraint logic programming
    • A.C. Kakas, F. Sadri, Springer New York
    • M. Wallace Constraint logic programming A.C. Kakas, F. Sadri, Computational Logic: Logic Programming and Beyond 2002 Springer New York 512 532
    • (2002) Computational Logic: Logic Programming and beyond , pp. 512-532
    • Wallace, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.