메뉴 건너뛰기




Volumn , Issue , 2012, Pages 318-346

Construction project performance in developing countries

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84884469170     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.4324/9780203847350     Document Type: Chapter
Times cited : (12)

References (64)
  • 3
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time, quality, two best guesses and a phenomenon, it is time to accept other success criteria
    • Atkinson, R. (1999) Project Management: Cost, Time, Quality, Two Best Guesses and A Phenomenon, it is Time to Accept Other Success Criteria, International Journal of Project Management, 17(6): 337–42.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 4
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • Belassi, W. and Tukel, O.I. (1996) A New Framework for Determining Critical Success/Failure Factors in Projects, International Journal of Project Management, 14(3): 141–51.
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 5
    • 0030676877 scopus 로고    scopus 로고
    • Integrated performance measurement systems: An audit development guide
    • Bititci, U.M., Carrie, A.S. and McDevitt, L. (1997) Integrated Performance Measurement Systems: an audit development guide, The TQM Magazine, 9(1): 46–53.
    • (1997) The TQM Magazine , vol.9 , Issue.1 , pp. 46-53
    • Bititci, U.M.1    Carrie, A.S.2    McDevitt, L.3
  • 9
    • 23744495350 scopus 로고    scopus 로고
    • Measuring success for a construction project
    • Chan, A.P.C. (1997) Measuring Success for a Construction Project, The Australian Institute of Quantity Surveyors, 1(2): 55–9.
    • (1997) The Australian Institute of Quantity Surveyors , vol.1 , Issue.2 , pp. 55-59
    • Chan, A.1
  • 10
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • Chan, A.P.C. and Chan, A.P.L. (2004) Key Performance Indicators for Measuring Construction Success, Benchmarking: An International Journal, 11(2): 203–21.
    • (2004) Benchmarking: An International Journal , vol.11 , Issue.2 , pp. 203-221
    • Chan, A.1    Chan, A.2
  • 11
    • 0242434228 scopus 로고    scopus 로고
    • Framework of success criteria for design/build projects
    • Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002) Framework of Success Criteria for Design/Build Projects, Journal of Management in Engineering, 18(3): 120–8.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.3 , pp. 120-128
    • Chan, A.1    Scott, D.2    Lam, E.3
  • 14
    • 84920692624 scopus 로고    scopus 로고
    • Report, Gaborone, Botswana, DCEC
    • DCEC (Directorate of Corruption and Economic Crime) (2006) Report, Gaborone, Botswana, DCEC.
    • (2006)
  • 17
    • 46049106438 scopus 로고
    • Performance measured is performance gained
    • February
    • Evangelidis, K. (1992) Performance Measured is Performance Gained, The Treasurer, February: 45–7.
    • (1992) The Treasurer , pp. 45-47
    • Evangelidis, K.1
  • 19
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: Selection criteria and project success factor
    • Hatush, Z. and Skitmore, M. (1997) Evaluating Contractor Prequalification Data: selection criteria and project success factor, Construction Management and Economics, 15(2): 129–47
    • (1997) Construction Management and Economics , vol.15 , Issue.2 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 21
    • 0031461802 scopus 로고    scopus 로고
    • Content analysis in leadership research: Examples, procedures, and suggestions for future use
    • Insch, G.S., Moore, J.E. and Murphy, L.D. (1997) Content analysis in leadership research: Examples, procedures, and suggestions for future use. Leadership Quarterly, Vol. 8, No. 1, pp. 1–25.
    • (1997) Leadership Quarterly , vol.8 , Issue.1 , pp. 1-25
    • Insch, G.S.1    Moore, J.E.2    Murphy, L.D.3
  • 26
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: An exploratory re-examination
    • Lim, C.S. and Mohamed, M.Z. (1999) Criteria of Project Success: an exploratory re-examination, International Journal of Project Management, 17(4): 243–8.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.S.1    Mohamed, M.Z.2
  • 30
    • 0028732528 scopus 로고
    • Critical analysis of time and cost of management and traditional contracts
    • Naoum, S.G. (1994) Critical Analysis of Time and Cost of Management and Traditional Contracts, Journal of Construction Engineering & Management, 120(3): 687–705.
    • (1994) Journal of Construction Engineering & Management , vol.120 , Issue.3 , pp. 687-705
    • Naoum, S.G.1
  • 32
    • 23744513609 scopus 로고
    • Design of project management systems from top management’s perspective
    • Navarre, C. and Schaan, J.L. (1990) Design of Project Management Systems from Top Management’s Perspective. Project Management Journal, Vol. 21, No. 2, pp. 19–27.
    • (1990) Project Management Journal , vol.21 , Issue.2 , pp. 19-27
    • Navarre, C.1    Schaan, J.L.2
  • 35
    • 0027623833 scopus 로고
    • Checklist of critical success factors for building projects
    • Parfitt, M.K. and Sanvido, V.E. (1993) Checklist of Critical Success Factors for Building Projects, Journal of Management in Engineering, 9(3): 243–9.
    • (1993) Journal of Management in Engineering , vol.9 , Issue.3 , pp. 243-249
    • Parfitt, M.K.1    Sanvido, V.E.2
  • 36
    • 0011997327 scopus 로고
    • Determinants of cross-functional cooperation in the project implementation process
    • Pinto, M.B. and Pinto, J.K. (1991) Determinants of Cross-Functional Cooperation in the Project Implementation Process, Project Management Journal, 22(2): 13–20.
    • (1991) Project Management Journal , vol.22 , Issue.2 , pp. 13-20
    • Pinto, M.B.1    Pinto, J.K.2
  • 39
    • 84864470777 scopus 로고    scopus 로고
    • Impact of procurement on stakeholder management
    • E. Chinyio and P. Olomolaiye (eds), Oxford: Wiley-Blackwell
    • Rwelamila, P.D. (2010) Impact of Procurement on Stakeholder Management. In E. Chinyio and P. Olomolaiye (eds), Construction Stakeholder Management, Oxford: Wiley-Blackwell.
    • (2010) Construction Stakeholder Management
    • Rwelamila, P.D.1
  • 40
    • 84920696970 scopus 로고    scopus 로고
    • The significance of “ubuntu” in meeting project goals in africa
    • R. Fellows and D.E. Seymour (eds), Rotterdam: CIB Publications
    • Rwelamila, P.D. and Khumalo, R. (2002) The Significance of “ubuntu” in Meeting Project Goals in Africa. In R. Fellows and D.E. Seymour (eds), Perspectives on Culture in Construction, Rotterdam: CIB Publications.
    • (2002) Perspectives on Culture in Construction
    • Rwelamila, P.D.1    Khumalo, R.2
  • 41
    • 0028485493 scopus 로고
    • Hybrid value engineering: The challenge of construction project management in the 1990s
    • Rwelamila, P.D. and Savile, P.W. (1994) Hybrid Value Engineering: the Challenge of Construction Project Management in the 1990s. International Journal of Project Management, 12(3): 157–64.
    • (1994) International Journal of Project Management , vol.12 , Issue.3 , pp. 157-164
    • Rwelamila, P.D.1    Savile, P.W.2
  • 42
    • 0347059986 scopus 로고    scopus 로고
    • The role of contract type in the success of r&d defence project under increasing uncertainty
    • Sadeh, A., Dvir, D. and Shenhar, A. (2000) The Role of Contract Type in the Success of R&D Defence Project Under Increasing Uncertainty, Project Management Journal, 31(3): 14–21.
    • (2000) Project Management Journal , vol.31 , Issue.3 , pp. 14-21
    • Sadeh, A.1    Dvir, D.2    Shenhar, A.3
  • 44
  • 47
  • 51
    • 84864489281 scopus 로고    scopus 로고
    • Project management maturity in public sector organisations: The case of botswana
    • K. Carter, S. Ogunlana and A. Kaka (eds), Proceedings of the CIB W55/W65 Joint Symposium: 15–17 November, Dubai
    • Tembo E. and Rwelamila P.D. (2008) Project Management Maturity in Public Sector Organisations: the case of Botswana. In K. Carter, S. Ogunlana and A. Kaka (eds) Transformation Through Construction. Proceedings of the CIB W55/W65 Joint Symposium: 15–17 November, Dubai.
    • (2008) Transformation through Construction
    • Tembo, E.1    Rwelamila, P.D.2
  • 52
    • 9144261866 scopus 로고    scopus 로고
    • Department of the Environment, Transport and the Regions, London
    • The KPI Working Group (2000) KPI Report for the Minister for Construction, Department of the Environment, Transport and the Regions, London.
    • (2000) KPI Report for the Minister for Construction
  • 53
    • 0004274191 scopus 로고    scopus 로고
    • 7th edn, Harlow: Addison-Wesley Longman
    • Todaro, M.P. (2000) Economic Development, 7th edn, Harlow: Addison-Wesley Longman.
    • (2000) Economic Development
    • Todaro, M.P.1
  • 54
    • 76749158500 scopus 로고    scopus 로고
    • Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (kpi) for large-scale public sector projects
    • Toor, S.R. and Ogunlana, S. (2010) Beyond the ‘Iron Triangle’: Stakeholder perception of key performance indicators (KPI) for large-scale public sector projects. International Journal of Project Management, Vol. 28, Issue 3, 228–236.
    • (2010) International Journal of Project Management , vol.28 , Issue.3 , pp. 228-236
    • Toor, S.R.1    Ogunlana, S.2
  • 56
    • 84920681897 scopus 로고
    • Sectoral studies series, UNIDO, UNIDO/IS.512/ADD.1
    • United Nations Industrial Development Organisation (UNIDO) (1985) The Building Materials Industry: The sector in figures. Sectoral studies series, 16(2), UNIDO, UNIDO/IS.512/ADD.1.
    • (1985) The Building Materials Industry: The Sector in Figures , vol.16 , Issue.2
  • 59
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • Walker, D.H.T. (1995) An Investigation Into Construction Time Performance, Construction Management & Economics, 13(3): 263–74.
    • (1995) Construction Management & Economics , vol.13 , Issue.3 , pp. 263-274
    • Walker, D.1
  • 60
    • 0002461625 scopus 로고    scopus 로고
    • The contribution of the construction management team to good construction time performance – an australian experience
    • Walker, D.H.T. (1996) The Contribution of the Construction Management Team to Good Construction Time Performance – an Australian Experience, Journal of Construction Procurement, 2(2): 4–18.
    • (1996) Journal of Construction Procurement , vol.2 , Issue.2 , pp. 4-18
    • Walker, D.1
  • 64
    • 0025462150 scopus 로고
    • Project performance evaluation checklist for consulting engineers
    • Wuellner, W.W. (1990) Project Performance Evaluation Checklist for Consulting Engineers, Journal of Management in Engineering, 6(3): 270–81.
    • (1990) Journal of Management in Engineering , vol.6 , Issue.3 , pp. 270-281
    • Wuellner, W.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.