메뉴 건너뛰기




Volumn 40, Issue 12, 2013, Pages 3033-3044

A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem

Author keywords

Assembly line balancing; Fuzzy processing times; Genetic algorithms; Line efficiency

Indexed keywords

ASSEMBLY LINE BALANCING; ASSEMBLY LINE BALANCING PROBLEMS; FUZZY PROCESSING TIME; LINE EFFICIENCY; META HEURISTIC ALGORITHM; PROCESSING TIME; SOLUTION APPROACH; TRIANGULAR FUZZY MEMBERSHIP FUNCTIONS;

EID: 84881008324     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2013.07.012     Document Type: Article
Times cited : (43)

References (40)
  • 1
    • 84867602236 scopus 로고    scopus 로고
    • Enhancing efficiency of automobile assembly line using the Fuzzy logical and multi-objective genetic algorithm
    • AAJ Adham, and RBM Tahar Enhancing efficiency of automobile assembly line using the Fuzzy logical and multi-objective genetic algorithm IEEE International Conference on Fuzzy 2012 1 7
    • (2012) IEEE International Conference on Fuzzy , pp. 1-7
    • Adham, A.A.J.1    Tahar, R.B.M.2
  • 2
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • /2 2013 259 277
    • O Battaïa, and A. Dolgui A taxonomy of line balancing problems and their solution approaches International Journal of Production Economics 142 2013 259 277 /2 2013 259 277
    • (2013) International Journal of Production Economics , vol.142 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 3
    • 0022768294 scopus 로고
    • Survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32/8 1986 909 932 (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 4
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
    • C Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168/3 2006 694 715 (Pubitemid 41336587)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 5
    • 0024931651 scopus 로고
    • Identifying multiple solutions for assembly line balancing having stochastic task times
    • DOI 10.1016/0360-8352(89)90161-7
    • J. Betts, and KI. Mahmoud Identifying multiple solutions for assembly line balancing having stochastic task times Computers & Industrial Engineering 16/3 1989 427 445 (Pubitemid 20623029)
    • (1989) Computers and Industrial Engineering , vol.16 , Issue.3 , pp. 427-445
    • Betts, J.1    Mahmoud, K.I.2
  • 6
    • 34249995941 scopus 로고    scopus 로고
    • A classification of assembly line balancing problems
    • DOI 10.1016/j.ejor.2006.10.010, PII S0377221706010435
    • N Boysen, M Fliedner, and A. Scholl A classification of assembly line balancing problems European Journal of Operational Research 183/2 2007 674 693 (Pubitemid 46891133)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 7
    • 0036845392 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for assembly line balancing
    • DOI 10.1023/A:1020377910258
    • JF Conçalves, and JR. De Almeida A hybrid genetic algorithm for assembly line balancing Journal of Heuristics 8/6 2002 629 642 (Pubitemid 35338030)
    • (2002) Journal of Heuristics , vol.8 , Issue.6 , pp. 629-642
    • Goncalves, J.F.1    De Almeida, J.R.2
  • 10
    • 33646075952 scopus 로고    scopus 로고
    • A new-multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • R Gamberini, A Grassi, and B. Rimini A new-multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem International Journal of Production Economics 102/2 2006 226 243
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 11
    • 0030422390 scopus 로고    scopus 로고
    • Fuzzy assembly line balancing using genetic algorithms
    • M Gen, Y Tsujimura, and Y. Li Fuzzy assembly line balancing using genetic algorithms Computers & Industrial Engineering 31/3-4 1996 631 634 (Pubitemid 126651671)
    • (1996) Computers and Industrial Engineering , vol.31 , Issue.3-4 , pp. 631-634
    • Gen, M.1    Tsujimura, Y.2    Li, Y.3
  • 12
    • 84870545654 scopus 로고    scopus 로고
    • Balancing of simple assembly lines under variations of task processing times
    • E Gurevsky, O Battaïa, and A. Dolgui Balancing of simple assembly lines under variations of task processing times Annals of Operations Research 201/1 2012 265 286
    • (2012) Annals of Operations Research , vol.201 , Issue.1 , pp. 265-286
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 13
    • 79960565579 scopus 로고    scopus 로고
    • Bi-criteria assembly line balancing by considering flexible operation times
    • N Hamta, S Fatemi Ghomi, F Jolai, and U. Bahalke Bi-criteria assembly line balancing by considering flexible operation times Applied Mathematical Modelling 35/12 2011 5592 5608
    • (2011) Applied Mathematical Modelling , vol.351 , Issue.2 , pp. 5592-5608
    • Hamta, N.1    Fatemi Ghomi, S.2    Jolai, F.3    Bahalke, U.4
  • 14
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • NV. Hop A heuristic solution for fuzzy mixed-model line balancing problem European Journal of Operational Research 168/3 2006 798 810
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 798-810
    • Hop, N.V.1
  • 17
    • 0030192703 scopus 로고    scopus 로고
    • Genetic algorithms for assembly line balancing with various objectives
    • DOI 10.1016/0360-8352(96)00009-5
    • YK Kim, YJ Kim, and Y. Kim Genetic algorithms for assembly line balancing with various objectives Computers & Industrial Engineering 30/3 1996 397 409 (Pubitemid 126393347)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.SPEC. ISSUE 3 , pp. 397-409
    • Kim, Y.K.1    Kim, Y.J.2    Kim, Y.3
  • 18
    • 0015639656 scopus 로고
    • A cost-oriented approach to stochastic line balancing
    • JF Kottas, and HS. Lau A cost-oriented approach to stochastic line balancing AIIE T 5/2 1973 164 171
    • (1973) AIIE T , vol.52 , pp. 164-171
    • Kottas, J.F.1    Lau, H.S.2
  • 19
    • 0016962322 scopus 로고
    • A total operating cost model for paced lines with stochastic task times
    • JF Kottas, and HS. Lau A total operating cost model for paced lines with stochastic task times AIIE T 8/2 1976 234 240
    • (1976) AIIE T , vol.82 , pp. 234-240
    • Kottas, J.F.1    Lau, H.S.2
  • 20
    • 2442558733 scopus 로고
    • Ranking fuzzy numbers with integral value
    • TS Liou, and MJ. Wang Ranking fuzzy numbers with integral value Fuzzy Sets and Systems 50/3 25 1992 247 255
    • (1992) Fuzzy Sets and Systems , vol.503 , Issue.25 , pp. 247-255
    • Liou, T.S.1    Wang, M.J.2
  • 21
    • 13544275547 scopus 로고    scopus 로고
    • A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines
    • DOI 10.1016/j.ejor.2004.07.016, PII S0377221704004734, Multicriteria Scheduling
    • SA. Mansouri A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines European Journal of Operational Research 167/3 2005 696 716 (Pubitemid 40220086)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 696-716
    • Mansouri, S.A.1
  • 23
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
    • C Miralles, J GarcIa-Sabater, C Andres, and M. Cardos Branch and bound procedures for solving the assembly line worker assignment and balancing problem: application to sheltered work centres for disabled Discrete Applied Mathematics 156/3 2008 352 367
    • (2008) Discrete Applied Mathematics , vol.1563 , pp. 352-367
    • Miralles, C.1    Garcia-Sabater, J.2    Andres, C.3    Cardos, M.4
  • 25
    • 84866148241 scopus 로고    scopus 로고
    • An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II
    • /1 2013 418 426
    • O Mutlu, O Polat, and AA. Supciller An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II Computers & Operations Research 40 2013 418 426 /1 2013 418 426
    • (2013) Computers & Operations Research , vol.40 , pp. 418-426
    • Mutlu, O.1    Polat, O.2    Supciller, A.A.3
  • 26
    • 39449130408 scopus 로고    scopus 로고
    • Multi-objective balancing of assembly lines by population heuristics
    • DOI 10.1080/00207540600988089, PII 771182681
    • AC. Nearchou Multi-objective balancing of assembly lines by population heuristics International Journal of Production Research 46/8 2008 2275 2297 (Pubitemid 351272741)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2275-2297
    • Nearchou, A.C.1
  • 27
    • 56549085980 scopus 로고    scopus 로고
    • Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming goals
    • U Özcan, and B. Toklu Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming goals Computers & Operations Research 36/6 2009 1955 1965
    • (2009) Computers & Operations Research , vol.366 , pp. 1955-1965
    • Özcan, U.1    Toklu, B.2
  • 30
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.022, PII S0377221704004795, Balancing Assembly and Transfer Lines
    • A Scholl, and C. Becker State of the art exact and heuristic solution procedures for simple assembly line balancing European Journal of Operational Research 168/3 2006 666 693 (Pubitemid 41336586)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 31
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • D. Shin An efficient heuristic for solving stochastic assembly line balancing problems Computers & Industrial Engineering 18/3 1990 285 295
    • (1990) Computers & Industrial Engineering , vol.183 , pp. 285-295
    • Shin, D.1
  • 32
    • 25144442374 scopus 로고    scopus 로고
    • Stability analysis of an optimal balance for an assembly line with fixed cycle time
    • DOI 10.1016/j.ejor.2004.07.028, PII S0377221704004850, Balancing Assembly and Transfer Lines
    • Y Sotskov, A Dolgui, and MC. Portmann Stability analysis of an optimal balance for an assembly line with fixed cycle time European Journal of Operational Research 168/3 2006 783 797 (Pubitemid 41336592)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 783-797
    • Sotskov, Y.N.1    Dolgui, A.2    Portmann, M.-C.3
  • 33
    • 84864403256 scopus 로고    scopus 로고
    • Bees Algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem
    • 10.1007/s11590-011-0344-9
    • P Tapkan, L Özbakir, and A. Baykasoǧlou Bees Algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem Optimization Letters 2011 10.1007/s11590-011-0344-9
    • (2011) Optimization Letters
    • Tapkan, P.1    Özbakir, L.2    Baykasoǧlou, A.3
  • 34
    • 39449124682 scopus 로고    scopus 로고
    • A review of the current applications of genetic algorithms in assembly line balancing
    • DOI 10.1007/s10845-007-0045-5
    • SO Tasan, and S. Tunali A review of the current applications of genetic algorithms in assembly line balancing Journal of Intelligent Manufacturing 19 2008 49 69 /1 2008 49 69 (Pubitemid 351270143)
    • (2008) Journal of Intelligent Manufacturing , vol.19 , Issue.1 , pp. 49-69
    • Tasan, S.O.1    Tunali, S.2
  • 36
    • 0029368231 scopus 로고
    • Solving fuzzy assembly-line balancing problem with genetic algorithms
    • Y Tsujimura, M Gen, and E. Kubota Solving fuzzy assembly-line balancing problem with genetic algorithms Computers & Industrial Engineering 29/1-4 1995 543 547
    • (1995) Computers & Industrial Engineering , vol.2914 , pp. 543-547
    • Tsujimura, Y.1    Gen, M.2    Kubota, E.3
  • 37
    • 80053189489 scopus 로고    scopus 로고
    • A solution procedure for type e simple assembly line balancing problem
    • NC Wei, and IM. Chao A solution procedure for type E simple assembly line balancing problem Computers & Industrial Engineering 61/3 2011 824 830
    • (2011) Computers & Industrial Engineering , vol.613 , pp. 824-830
    • Wei, N.C.1    Chao, I.M.2
  • 38
    • 77249137445 scopus 로고    scopus 로고
    • Robust balancing of mixed model assembly line
    • W Xu, and T. Xiao Robust balancing of mixed model assembly line COMPEL 28/6 2009 1489 1502
    • (2009) COMPEL , vol.286 , pp. 1489-1502
    • Xu, W.1    Xiao, T.2
  • 39
    • 84862303222 scopus 로고    scopus 로고
    • Multi-objective fuzzy assembly line balancing using genetic algorithms
    • PTh Zacharia, and AC Nearchou Multi-objective fuzzy assembly line balancing using genetic algorithms Journal of Intelligent Manufacturing 23/ 3 2012 615 627
    • (2012) Journal of Intelligent Manufacturing , vol.233 , pp. 615-627
    • Zacharia, P.1    Nearchou, A.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.