메뉴 건너뛰기




Volumn 37, Issue 15, 1999, Pages 3359-3382

An optimization approach to capacity expansion in semiconductor manufacturing facilities

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; BATCH DATA PROCESSING; COMPUTATIONAL METHODS; COMPUTER WORKSTATIONS; DECISION THEORY; LINEAR EQUATIONS; MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING; PRODUCTION ENGINEERING; SIMULATED ANNEALING;

EID: 0033207649     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499190095     Document Type: Article
Times cited : (63)

References (31)
  • 1
    • 0026116456 scopus 로고
    • An algorithm for the manufacturing equipment selection problem
    • Bard, J. F. and Feo, T. A., 1991, An algorithm for the manufacturing equipment selection problem. IIE Transactions, 23(1), 83-92.
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 83-92
    • Bard, J.F.1    Feo, T.A.2
  • 2
    • 0023861277 scopus 로고
    • Multiproduct queuing networks with deterministic routing: Decomposition approach and the notion of interference
    • Bitran, G. R. and Tirupati, D., 1988, Multiproduct queuing networks with deterministic routing: decomposition approach and the notion of interference. Management Science, 34(1), 75-100.
    • (1988) Management Science , vol.34 , Issue.1 , pp. 75-100
    • Bitran, G.R.1    Tirupati, D.2
  • 3
    • 0001133960 scopus 로고
    • Capacity planning with discrete options in manufacturing networks
    • Bitran, G. R. and Tirupati, D., 1989a, Capacity planning with discrete options in manufacturing networks. Annals of Operations Research, 17, 119-136.
    • (1989) Annals of Operations Research , vol.17 , pp. 119-136
    • Bitran, G.R.1    Tirupati, D.2
  • 4
    • 0024702612 scopus 로고
    • Trade-off curves, targeting and balancing in manufacturing queueing networks
    • Bitran, G. R. and Tirupati, D., 1989b, Trade-off curves, targeting and balancing in manufacturing queueing networks. Operations Research, 37(4), 547-564.
    • (1989) Operations Research , vol.37 , Issue.4 , pp. 547-564
    • Bitran, G.R.1    Tirupati, D.2
  • 5
    • 0001475545 scopus 로고
    • Approximations for product departures for a single server station with batch processing in multi-product queues
    • Bitran, G. R. and Tirupati, D., 1989c, Approximations for product departures for a single server station with batch processing in multi-product queues. Management Science, 35(7), 851-878.
    • (1989) Management Science , vol.35 , Issue.7 , pp. 851-878
    • Bitran, G.R.1    Tirupati, D.2
  • 6
    • 85010553430 scopus 로고
    • DELPHI, A C-based manufacturing simulator
    • Sematech, Austin, TX; updated versions with Wright Williams & Kelly, Pleasanton, CA
    • Chance, F., 1993, DELPHI, A C-based manufacturing simulator. Version 8, Level 27, Sematech, Austin, TX; updated versions with Wright Williams & Kelly, Pleasanton, CA.
    • (1993) Version 8, Level , pp. 27
    • Chance, F.1
  • 8
    • 84987041250 scopus 로고
    • An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities
    • Deuermeyer, B. L., Curry, G. L. and Feldman, R., 1993, An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities. Production and Operations Management, 2(3), 195-220.
    • (1993) Production and Operations Management , vol.2 , Issue.3 , pp. 195-220
    • Deuermeyer, B.L.1    Curry, G.L.2    Feldman, R.3
  • 10
    • 0026367689 scopus 로고
    • A GRASP for a difficult single machine scheduling problem
    • Feo, T A., Venkatraman, K. and Bard, J.F., 1991, A GRASP for a difficult single machine scheduling problem. Computers & Operations Research, 18(8), 635-643.
    • (1991) Computers & Operations Research , vol.18 , Issue.8 , pp. 635-643
    • Feo, T.A.1    Venkatraman, K.2    Bard, J.F.3
  • 12
    • 0024770085 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation, part 1, graph partitioning
    • Johnson, D. S., Aragon, C. R., McGeoch L. A. and Schevon, C., 1989, Optimization by simulated annealing: an experimental evaluation, part 1, graph partitioning. Operations Research, 37(6), 865-892.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 865-892
    • Johnson, D.S.1    Aragon, C.R.2    Mc Geoch, L.A.3    Schevon, C.4
  • 13
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 15
    • 0023306720 scopus 로고
    • The production equipment requirements problem
    • Kusiak, A., 1987, The production equipment requirements problem. International Journal of Production Research, 25(3), 319-325.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 319-325
    • Kusiak, A.1
  • 16
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu, S. H., Ramaswamy, D. and Kumar, P. R., 1994, Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions Semiconductor Manufacturing, 7, 374-388.
    • (1994) IEEE Transactions Semiconductor Manufacturing , vol.7 , pp. 374-388
    • Lu, S.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 17
    • 0018011141 scopus 로고
    • A dynamic resource allocation model for a machine requirements problem
    • Miller, D. M. and Davis, R. P., 1978, A dynamic resource allocation model for a machine requirements problem. AIIE Transactions, 10(3), 237-243.
    • (1978) AIIE Transactions , vol.10 , Issue.3 , pp. 237-243
    • Miller, D.M.1    Davis, R.P.2
  • 18
    • 0029771094 scopus 로고    scopus 로고
    • Performance analysis of scheduling policies in reentrant manufacturing system
    • Narahari, Y. and Khan, L. M., 1996, Performance analysis of scheduling policies in reentrant manufacturing systems. Computers & Operations Research, 23(1), 37-51.
    • (1996) Computers & Operations Research , vol.23 , Issue.1 , pp. 37-51
    • Narahari, Y.1    Khan, L.M.2
  • 19
    • 0029341463 scopus 로고
    • The use of upstream and down stream information in scheduling semiconductor batch operations
    • Robinson, J. K., Fowler, J. W. and Bard, J. F., 1995, The use of upstream and down stream information in scheduling semiconductor batch operations. International Journal of Production Research, 33(7), 1849-1869.
    • (1995) International Journal of Production Research , vol.33 , Issue.7 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 21
    • 0342739288 scopus 로고
    • A model for manufacturing system selection
    • A. Kusiak (Ed.), Amsterdam: North-Holland
    • Sarin, S. C. and Chen, C. S., 1986, A model for manufacturing system selection. In A. Kusiak (Ed.) Flexible Manufacturing Systems: Methods and Studies (Amsterdam: North-Holland) 99-112.
    • (1986) Flexible Manufacturing Systems: Methods and Studies , pp. 99-112
    • Sarin, S.C.1    Chen, C.S.2
  • 25
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characterization, performance evaluation and production planning
    • Uzsoy, R., Lee, C.-Y. and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry. Part I: system characterization, performance evaluation and production planning. IIE Transactions on Scheduling & Logistics, 24(4), 47-60.
    • (1992) IIE Transactions on Scheduling & Logistics , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 28
    • 0026869951 scopus 로고
    • On the relationship between yield and cycle time in semiconductor wafer fabrication
    • Wein, L., 1992, On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Transaction on Semiconductor Manufacturing, 5(2), 156-158.
    • (1992) IEEE Transaction on Semiconductor Manufacturing , vol.5 , Issue.2 , pp. 156-158
    • Wein, L.1
  • 30
    • 0023315023 scopus 로고
    • Solving quadratic assignment problems by simulated annealing
    • Wilhelm, M. and Ward, T, 1987, Solving quadratic assignment problems by simulated annealing. IIE Transactions, 19(1), 107-119.
    • (1987) IIE Transactions , vol.19 , Issue.1 , pp. 107-119
    • Wilhelm, M.1    Ward, T.2
  • 31
    • 0000230214 scopus 로고
    • A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem
    • Zegordi, S. H., Itoh, K. and Enkawa, T, 1995, A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem. International Journal of Production Research, 33(5), 1449-1466.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1449-1466
    • Zegordi, S.H.1    Itoh, K.2    Enkawa, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.