-
1
-
-
0026116456
-
An algorithm for the manufacturing equipment selection problem
-
Bard, J. F. and Feo, T. A., 1991, An algorithm for the manufacturing equipment selection problem. IIE Transactions, 23(1), 83-92.
-
(1991)
IIE Transactions
, vol.23
, Issue.1
, pp. 83-92
-
-
Bard, J.F.1
Feo, T.A.2
-
2
-
-
0023861277
-
Multiproduct queuing networks with deterministic routing: Decomposition approach and the notion of interference
-
Bitran, G. R. and Tirupati, D., 1988, Multiproduct queuing networks with deterministic routing: decomposition approach and the notion of interference. Management Science, 34(1), 75-100.
-
(1988)
Management Science
, vol.34
, Issue.1
, pp. 75-100
-
-
Bitran, G.R.1
Tirupati, D.2
-
3
-
-
0001133960
-
Capacity planning with discrete options in manufacturing networks
-
Bitran, G. R. and Tirupati, D., 1989a, Capacity planning with discrete options in manufacturing networks. Annals of Operations Research, 17, 119-136.
-
(1989)
Annals of Operations Research
, vol.17
, pp. 119-136
-
-
Bitran, G.R.1
Tirupati, D.2
-
4
-
-
0024702612
-
Trade-off curves, targeting and balancing in manufacturing queueing networks
-
Bitran, G. R. and Tirupati, D., 1989b, Trade-off curves, targeting and balancing in manufacturing queueing networks. Operations Research, 37(4), 547-564.
-
(1989)
Operations Research
, vol.37
, Issue.4
, pp. 547-564
-
-
Bitran, G.R.1
Tirupati, D.2
-
5
-
-
0001475545
-
Approximations for product departures for a single server station with batch processing in multi-product queues
-
Bitran, G. R. and Tirupati, D., 1989c, Approximations for product departures for a single server station with batch processing in multi-product queues. Management Science, 35(7), 851-878.
-
(1989)
Management Science
, vol.35
, Issue.7
, pp. 851-878
-
-
Bitran, G.R.1
Tirupati, D.2
-
6
-
-
85010553430
-
DELPHI, A C-based manufacturing simulator
-
Sematech, Austin, TX; updated versions with Wright Williams & Kelly, Pleasanton, CA
-
Chance, F., 1993, DELPHI, A C-based manufacturing simulator. Version 8, Level 27, Sematech, Austin, TX; updated versions with Wright Williams & Kelly, Pleasanton, CA.
-
(1993)
Version 8, Level
, pp. 27
-
-
Chance, F.1
-
7
-
-
0005713838
-
-
Yorktown Heights, NY: IBM Research Division)
-
Connors, D. P., Fegin, G. E. and Yao, D. D., 1994, A Queueing Network Model for Semiconductor Manufacturing. (Yorktown Heights, NY: IBM Research Division).
-
(1994)
A Queueing Network Model for Semiconductor Manufacturing
-
-
Connors, D.P.1
Fegin, G.E.2
Yao, D.D.3
-
8
-
-
84987041250
-
An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities
-
Deuermeyer, B. L., Curry, G. L. and Feldman, R., 1993, An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities. Production and Operations Management, 2(3), 195-220.
-
(1993)
Production and Operations Management
, vol.2
, Issue.3
, pp. 195-220
-
-
Deuermeyer, B.L.1
Curry, G.L.2
Feldman, R.3
-
9
-
-
85010553434
-
Optimal design of stochastic production lines: A dynamic programming approach
-
Northwestern University, Evanston, IL
-
Donohue, K. L., Hopp, W. and Spearman, M., 1995, Optimal design of stochastic production lines: a dynamic programming approach. Working paper, Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL.
-
(1995)
Working Paper, Department of Industrial Engineering and Management Sciences
-
-
Donohue, K.L.1
Hopp, W.2
Spearman, M.3
-
10
-
-
0026367689
-
A GRASP for a difficult single machine scheduling problem
-
Feo, T A., Venkatraman, K. and Bard, J.F., 1991, A GRASP for a difficult single machine scheduling problem. Computers & Operations Research, 18(8), 635-643.
-
(1991)
Computers & Operations Research
, vol.18
, Issue.8
, pp. 635-643
-
-
Feo, T.A.1
Venkatraman, K.2
Bard, J.F.3
-
12
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation, part 1, graph partitioning
-
Johnson, D. S., Aragon, C. R., McGeoch L. A. and Schevon, C., 1989, Optimization by simulated annealing: an experimental evaluation, part 1, graph partitioning. Operations Research, 37(6), 865-892.
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 865-892
-
-
Johnson, D.S.1
Aragon, C.R.2
Mc Geoch, L.A.3
Schevon, C.4
-
13
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
15
-
-
0023306720
-
The production equipment requirements problem
-
Kusiak, A., 1987, The production equipment requirements problem. International Journal of Production Research, 25(3), 319-325.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 319-325
-
-
Kusiak, A.1
-
16
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
-
Lu, S. H., Ramaswamy, D. and Kumar, P. R., 1994, Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions Semiconductor Manufacturing, 7, 374-388.
-
(1994)
IEEE Transactions Semiconductor Manufacturing
, vol.7
, pp. 374-388
-
-
Lu, S.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
17
-
-
0018011141
-
A dynamic resource allocation model for a machine requirements problem
-
Miller, D. M. and Davis, R. P., 1978, A dynamic resource allocation model for a machine requirements problem. AIIE Transactions, 10(3), 237-243.
-
(1978)
AIIE Transactions
, vol.10
, Issue.3
, pp. 237-243
-
-
Miller, D.M.1
Davis, R.P.2
-
18
-
-
0029771094
-
Performance analysis of scheduling policies in reentrant manufacturing system
-
Narahari, Y. and Khan, L. M., 1996, Performance analysis of scheduling policies in reentrant manufacturing systems. Computers & Operations Research, 23(1), 37-51.
-
(1996)
Computers & Operations Research
, vol.23
, Issue.1
, pp. 37-51
-
-
Narahari, Y.1
Khan, L.M.2
-
19
-
-
0029341463
-
The use of upstream and down stream information in scheduling semiconductor batch operations
-
Robinson, J. K., Fowler, J. W. and Bard, J. F., 1995, The use of upstream and down stream information in scheduling semiconductor batch operations. International Journal of Production Research, 33(7), 1849-1869.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.7
, pp. 1849-1869
-
-
Robinson, J.K.1
Fowler, J.W.2
Bard, J.F.3
-
21
-
-
0342739288
-
A model for manufacturing system selection
-
A. Kusiak (Ed.), Amsterdam: North-Holland
-
Sarin, S. C. and Chen, C. S., 1986, A model for manufacturing system selection. In A. Kusiak (Ed.) Flexible Manufacturing Systems: Methods and Studies (Amsterdam: North-Holland) 99-112.
-
(1986)
Flexible Manufacturing Systems: Methods and Studies
, pp. 99-112
-
-
Sarin, S.C.1
Chen, C.S.2
-
23
-
-
84958179889
-
-
MS Thesis, Department of Mechanical Engineering, University of Texas, Austin
-
Srinivasan, K., 1995, Capacity Expansion with Discrete Options in Semiconductor Manufacturing Systems, MS Thesis, Department of Mechanical Engineering, University of Texas, Austin.
-
(1995)
Capacity Expansion with Discrete Options in Semiconductor Manufacturing Systems
-
-
Srinivasan, K.1
-
24
-
-
0029478868
-
Correlation between yield and waiting time: A quantitative study
-
Austin, Texas (2-4 October)
-
Srinivasan, K., Sandell, R. and Brown, S., 1995, Correlation between yield and waiting time: a quantitative study. Proceedings of the International Electronics Manufacturing Technology Symposium, Austin, Texas (2-4 October).
-
(1995)
Proceedings of the International Electronics Manufacturing Technology Symposium
-
-
Srinivasan, K.1
Sandell, R.2
Brown, S.3
-
25
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part I: System characterization, performance evaluation and production planning
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry. Part I: system characterization, performance evaluation and production planning. IIE Transactions on Scheduling & Logistics, 24(4), 47-60.
-
(1992)
IIE Transactions on Scheduling & Logistics
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
28
-
-
0026869951
-
On the relationship between yield and cycle time in semiconductor wafer fabrication
-
Wein, L., 1992, On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Transaction on Semiconductor Manufacturing, 5(2), 156-158.
-
(1992)
IEEE Transaction on Semiconductor Manufacturing
, vol.5
, Issue.2
, pp. 156-158
-
-
Wein, L.1
-
30
-
-
0023315023
-
Solving quadratic assignment problems by simulated annealing
-
Wilhelm, M. and Ward, T, 1987, Solving quadratic assignment problems by simulated annealing. IIE Transactions, 19(1), 107-119.
-
(1987)
IIE Transactions
, vol.19
, Issue.1
, pp. 107-119
-
-
Wilhelm, M.1
Ward, T.2
-
31
-
-
0000230214
-
A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem
-
Zegordi, S. H., Itoh, K. and Enkawa, T, 1995, A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem. International Journal of Production Research, 33(5), 1449-1466.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1449-1466
-
-
Zegordi, S.H.1
Itoh, K.2
Enkawa, T.3
|