Volumn 139, Issue 7, 2013, Pages 755-767

Contractor selection model for highway projects using integrated simulation and analytic network process

Author keywords

Analytic network process (ANP); Contractor selection; Highway contractors; Monte Carlo simulation

Indexed keywords

ANALYTIC NETWORK PROCESS; CONTRACTOR SELECTION; HIGHWAY PROJECTS; INTEGRATED SIMULATIONS; OPTIMUM SOLUTION; QUALITATIVE CRITERIA; SELECTION MODEL; SINGLE PLATFORM;

EID: 84878827910     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000647     Document Type: Article
Times cited : (63)

References (32)
  • 1
    • 39349099541 scopus 로고    scopus 로고
    • Best-value model based on project specific characteristics
    • (a). JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:3(179)
    • Abdelrahman, M., Zayed, T., and, Elyamany, A. (2008 a). " Best-value model based on project specific characteristics." J. Constr. Eng. Manage., 134 (3), 179-188. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:3(179)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.3 , pp. 179-188
    • Abdelrahman, M.1    Zayed, T.2    Elyamany, A.3
  • 3
    • 11944252554 scopus 로고    scopus 로고
    • Performance modeling for contractor selection
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:2(52)
    • Alarcón, L. F., and, Mourgues, C. (2002). " Performance modeling for contractor selection." J. Manage. Eng., 18 (2), 52-60. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:2(52)
    • (2002) J. Manage. Eng. , vol.18 , Issue.2 , pp. 52-60
    • Alarcón, L.F.1    Mourgues, C.2
  • 4
    • 33646167815 scopus 로고    scopus 로고
    • Condition rating model for underground infrastructure sustainable water mains
    • JPCFEV 0887-3828 10.1061/(ASCE)0887-3828(2006)20:2(126)
    • Al-Barqawi, H., and, Zayed, T. (2006). " Condition rating model for underground infrastructure sustainable water mains." J. Perform. Constr. Facil., 20 (2), 126-135. JPCFEV 0887-3828 10.1061/(ASCE)0887-3828(2006)20:2(126)
    • (2006) J. Perform. Constr. Facil. , vol.20 , Issue.2 , pp. 126-135
    • Al-Barqawi, H.1    Zayed, T.2
  • 5
    • 56549108548 scopus 로고    scopus 로고
    • Infrastructure management: Integrated AHP/ANN model to evaluate municipal water mains performance
    • JITSE4 1076-0342 10.1061/(ASCE)1076-0342(2008)14:4(305)
    • Al-Barqawi, H., and, Zayed, T. (2008). " Infrastructure management: Integrated AHP/ANN model to evaluate municipal water mains performance." J. Infrastruct. Syst., 14 (4), 305-318. JITSE4 1076-0342 10.1061/(ASCE)1076- 0342(2008)14:4(305)
    • (2008) J. Infrastruct. Syst. , vol.14 , Issue.4 , pp. 305-318
    • Al-Barqawi, H.1    Zayed, T.2
  • 6
    • 0032000792 scopus 로고    scopus 로고
    • A neural network application to subcontractor rating in construction firms
    • IPMAEL 0263-7863 10.1016/S0263-7863(97)00007-0
    • Albino, V., and, Garavelli, A. C. (1998). " A neural network application to subcontractor rating in construction firms." Int. J. Project Manage., 16 (1), 9-14. IPMAEL 0263-7863 10.1016/S0263-7863(97)00007-0
    • (1998) Int. J. Project Manage. , vol.16 , Issue.1 , pp. 9-14
    • Albino, V.1    Garavelli, A.C.2
  • 7
    • 38649142787 scopus 로고    scopus 로고
    • Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES)
    • AUCOES 0926-5805 10.1016/j.autcon.2007.08.004
    • Arslan, G., Kivrak, S., Birgonul, M. T., and, Dikmen, I. (2008). " Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES)." Autom. Constr., 17 (4), 480-488. AUCOES 0926-5805 10.1016/j.autcon.2007.08.004
    • (2008) Autom. Constr. , vol.17 , Issue.4 , pp. 480-488
    • Arslan, G.1    Kivrak, S.2    Birgonul, M.T.3    Dikmen, I.4
  • 8
    • 47049122304 scopus 로고    scopus 로고
    • Contractor selection: Fuzzy-control approach
    • CJCEB8 0315-1468 10.1139/L07-127
    • Bendaña, R., Caño, A., and, Pilar de la Cruz, M. (2008). " Contractor selection: Fuzzy-control approach." Can. J. Civ. Eng., 35 (5), 473-486. CJCEB8 0315-1468 10.1139/L07-127
    • (2008) Can. J. Civ. Eng. , vol.35 , Issue.5 , pp. 473-486
    • Bendaña, R.1    Caño, A.2    Pilar De La Cruz, M.3
  • 9
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytic network process
    • 0144-6193 10.1080/0144619042000202852
    • Cheng, E., and, Li, H. (2004). " Contractor selection using the analytic network process." Constr. Manage. Econ., 22 (10), 1021-1032. 0144-6193 10.1080/0144619042000202852
    • (2004) Constr. Manage. Econ. , vol.22 , Issue.10 , pp. 1021-1032
    • Cheng, E.1    Li, H.2
  • 10
    • 70349349045 scopus 로고    scopus 로고
    • Monte Carlo simulation approach to support alliance team selection
    • 0144-6193 10.1061/(ASCE)CO.1943-7862.0000074
    • El Asmar, M., Hanna, A., and, Chang, C. (2009). " Monte Carlo simulation approach to support alliance team selection." Constr. Manage. Econ., 135 (10), 1087-1095. 0144-6193 10.1061/(ASCE)CO.1943-7862.0000074
    • (2009) Constr. Manage. Econ. , vol.135 , Issue.10 , pp. 1087-1095
    • El Asmar, M.1    Hanna, A.2    Chang, C.3
  • 11
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • 0144-6193 10.1080/014461900407356
    • Fong, P. S., and, Choi, S. K. (2000). " Final contractor selection using the analytical hierarchy process." Constr. Manage. Econ., 18 (5), 547-557. 0144-6193 10.1080/014461900407356
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.5 , pp. 547-557
    • Fong, P.S.1    Choi, S.K.2
  • 12
    • 0029708514 scopus 로고    scopus 로고
    • Best value contracting: Breaking the low-bid paradigm." AACE International, Vancouver, Canada, VE&C.5.1-VE&C.5.4
    • Gransberg, D. D., and, Ellicott, M. A. (1996). " Best value contracting: Breaking the low-bid paradigm." AACE Transactions, AACE International, Vancouver, Canada, VE&C.5.1-VE&C.5.4.
    • (1996) AACE Transactions
    • Gransberg, D.D.1    Ellicott, M.A.2
  • 13
    • 0036959801 scopus 로고    scopus 로고
    • Quality based prequalification of contractors
    • 03611981 0361-1981 10.3141/1813-32
    • Hancher, D. E., and, Lambert, S. E. (2002). " Quality based prequalification of contractors." J. Transp. Res. Board, 1813 (0361-1981), 260-274. 0361-1981 10.3141/1813-32
    • (2002) J. Transp. Res. Board , vol.1813 , pp. 260-274
    • Hancher, D.E.1    Lambert, S.E.2
  • 14
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • 0144-6193 10.1080/014461997373088
    • Hatush, Z., and, Skitmore, M. (1997). " Criteria for contractor selection." Constr. Manage. Econ., 15 (1), 19-38. 0144-6193 10.1080/014461997373088
    • (1997) Constr. Manage. Econ. , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 15
    • 0032023054 scopus 로고    scopus 로고
    • Contractor selection using multicriteria utility theory: An additive model
    • BUSCBC 0360-1323 10.1016/S0360-1323(97)00016-4
    • Hatush, Z., and, Skitmore, M. (1998). " Contractor selection using multicriteria utility theory: An additive model." Build. Environ., 33 (2-3), 105-115. BUSCBC 0360-1323 10.1016/S0360-1323(97)00016-4
    • (1998) Build. Environ. , vol.33 , Issue.23 , pp. 105-115
    • Hatush, Z.1    Skitmore, M.2
  • 16
    • 0028516227 scopus 로고
    • Evaluating prequalification criteria in contractor selection
    • BUSCBC 0360-1323 10.1016/0360-1323(94)90003-5
    • Holt, G., Olomolaiye, P., and, Harris, F. (1994). " Evaluating prequalification criteria in contractor selection." Build. Environ., 29 (4), 437-448. BUSCBC 0360-1323 10.1016/0360-1323(94)90003-5
    • (1994) Build. Environ. , vol.29 , Issue.4 , pp. 437-448
    • Holt, G.1    Olomolaiye, P.2    Harris, F.3
  • 17
    • 0013229112 scopus 로고
    • A review of contractor selection practices in the U.K. construction industry
    • BUSCBC 0360-1323 10.1016/0360-1323(95)00008-T
    • Holt, G., Olomolaiye, P., and, Harris, F. (1995). " A review of contractor selection practices in the U.K. construction industry." Build. Environ., 30 (4), 533-561. BUSCBC 0360-1323 10.1016/0360-1323(95)00008-T
    • (1995) Build. Environ. , vol.30 , Issue.4 , pp. 533-561
    • Holt, G.1    Olomolaiye, P.2    Harris, F.3
  • 18
    • 80054917822 scopus 로고    scopus 로고
    • Evaluating qualification-based selection system: A simulation approach
    • 0144-6193 10.1061/(ASCE)CO.1943-7862.0000013
    • Lo, W., and, Yan, M. (2009). " Evaluating qualification-based selection system: A simulation approach." Constr. Manage. Econ., 135 (6), 458-465. 0144-6193 10.1061/(ASCE)CO.1943-7862.0000013
    • (2009) Constr. Manage. Econ. , vol.135 , Issue.6 , pp. 458-465
    • Lo, W.1    Yan, M.2
  • 19
    • 84860498580 scopus 로고    scopus 로고
    • A multi-criteria approach to contractor selection
    • 0969-9988 10.1046/j.1365-232X.2002.00228.x
    • Mahdi, I. M., Riley, M., Fereig, S., and, Alex, A. P. (2002). " A multi-criteria approach to contractor selection." J. Eng. Constr. Archit. Manage., 9 (1), 29-37. 0969-9988 10.1046/j.1365-232X.2002.00228.x
    • (2002) J. Eng. Constr. Archit. Manage. , vol.9 , Issue.1 , pp. 29-37
    • Mahdi, I.M.1    Riley, M.2    Fereig, S.3    Alex, A.P.4
  • 20
    • 0025385269 scopus 로고
    • Bid evaluation for the U.K. public sector construction contracts
    • PCIEAT 0020-3262 10.1680/iicep.1990.4529
    • Merna, A., and, Smith, N. J. (1990). " Bid evaluation for the U.K. public sector construction contracts." Proc. Inst. Civ. Eng., 88 (1), 91-105. PCIEAT 0020-3262 10.1680/iicep.1990.4529
    • (1990) Proc. Inst. Civ. Eng. , vol.88 , Issue.1 , pp. 91-105
    • Merna, A.1    Smith, N.J.2
  • 21
    • 12344265089 scopus 로고    scopus 로고
    • Quality-based contractor rating model for qualification and bidding purposes
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:1(38)
    • Minchin, R. E., Jr., and, Smith, G. R. (2005). " Quality-based contractor rating model for qualification and bidding purposes." J. Manage. Eng., 21 (1), 38-43. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:1(38)
    • (2005) J. Manage. Eng. , vol.21 , Issue.1 , pp. 38-43
    • Minchin, Jr.R.E.1    Smith, G.R.2
  • 22
    • 79959281873 scopus 로고    scopus 로고
    • Multi-attribute decision making in contractor selection under hybrid uncertainty
    • Nureize, A., and, Watada, J. (2011). " Multi-attribute decision making in contractor selection under hybrid uncertainty." J. Adv. Comput. Intell. Intell. Inf., 15 (4), 465-472.
    • (2011) J. Adv. Comput. Intell. Intell. Inf. , vol.15 , Issue.4 , pp. 465-472
    • Nureize, A.1    Watada, J.2
  • 23
    • 0025220842 scopus 로고
    • QUALIFIER-1: Contractor prequalification model
    • JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1990)4:1(77)
    • Russell, J., and, Skibniewski, M. J. (1990). " QUALIFIER-1: Contractor prequalification model." J. Comput. Civ. Eng., 4 (1), 77-90. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1990)4:1(77)
    • (1990) J. Comput. Civ. Eng. , vol.4 , Issue.1 , pp. 77-90
    • Russell, J.1    Skibniewski, M.J.2
  • 24
    • 0025398528 scopus 로고
    • QUALIFIER-2: Knowledge-based system for contractor prequalification
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990)116:1(157)
    • Russell, J., Skibniewski, M. J., and, Cozier, D. R. (1990). " QUALIFIER-2: Knowledge-based system for contractor prequalification." J. Constr. Eng. Manage., 116 (1), 157-171. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(1990)116:1(157)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 157-171
    • Russell, J.1    Skibniewski, M.J.2    Cozier, D.R.3
  • 25
    • 21844510082 scopus 로고
    • How to make a decision: The analytic hierarchy process
    • INFAC4 0092-2102 10.1287/inte.24.6.19
    • Saaty, T. (1994). " How to make a decision: The analytic hierarchy process." Interfaces, 24 (6), 19-43. INFAC4 0092-2102 10.1287/inte.24.6.19
    • (1994) Interfaces , vol.24 , Issue.6 , pp. 19-43
    • Saaty, T.1
  • 27
    • 0033358348 scopus 로고    scopus 로고
    • A methodological framework for evaluating environmentally conscious manufacturing programs
    • CINDDL 0360-8352 10.1016/S0360-8352(99)00166-7
    • Sarkis, J. (1999). " A methodological framework for evaluating environmentally conscious manufacturing programs." Comput. Ind. Eng., 36 (4), 793-810. CINDDL 0360-8352 10.1016/S0360-8352(99)00166-7
    • (1999) Comput. Ind. Eng. , vol.36 , Issue.4 , pp. 793-810
    • Sarkis, J.1
  • 28
    • 12344271940 scopus 로고    scopus 로고
    • A fuzzy decision framework for contractor selection
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:1(62)
    • Singh, D., and, Tiong, R. (2005). " A fuzzy decision framework for contractor selection." J. Constr. Eng. Manage., 131 (1), 62-70. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:1(62)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 62-70
    • Singh, D.1    Tiong, R.2
  • 29
    • 33747347789 scopus 로고    scopus 로고
    • Contractor selection criteria: Investigation of opinions of Singapore construction practitioners
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:9(998)
    • Singh, D., and, Tiong, R. (2006). " Contractor selection criteria: Investigation of opinions of Singapore construction practitioners." J. Constr. Eng. Manage., 132 (9), 998-1008. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2006)132:9(998)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.9 , pp. 998-1008
    • Singh, D.1    Tiong, R.2
  • 30
    • 0942289097 scopus 로고    scopus 로고
    • A decision model proposal for construction contractor selection in Turkey
    • BUSCBC 0360-1323 10.1016/j.buildenv.2003.09.009
    • Topcu, Y. (2004). " A decision model proposal for construction contractor selection in Turkey." Build. Environ., 39 (4), 469-481. BUSCBC 0360-1323 10.1016/j.buildenv.2003.09.009
    • (2004) Build. Environ. , vol.39 , Issue.4 , pp. 469-481
    • Topcu, Y.1
  • 31
    • 33845786002 scopus 로고    scopus 로고
    • Fuzzy approach to prequalifying construction contractors
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(40)
    • Yawei, L., Nie, X., and, Chen, S. (2007). " Fuzzy approach to prequalifying construction contractors." J. Constr. Eng. Manage., 133 (1), 40-49. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(40)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.1 , pp. 40-49
    • Yawei, L.1    Nie, X.2    Chen, S.3
  • 32
    • 57849118192 scopus 로고    scopus 로고
    • Contractor selection of construction in a competitive environment
    • 1611-1699 10.3846/1611-1699.2008.9.181-187
    • Zavadskas, E., Kazimieras, T. Z., and, Tamosaitieme, J. (2008). " Contractor selection of construction in a competitive environment." J. Bus. Econ. Manage., 9 (3), 181-187. 1611-1699 10.3846/1611-1699.2008.9.181-187
    • (2008) J. Bus. Econ. Manage. , vol.9 , Issue.3 , pp. 181-187
    • Zavadskas, E.1    Kazimieras, T.Z.2    Tamosaitieme, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.