-
1
-
-
20644459696
-
Design/build selection process-Art or science
-
0274-9696.
-
Abi-Karam, T. (2005). " Design/build selection process-Art or science.." Cost Eng. 0274-9696, 47 (5), 14-19.
-
(2005)
Cost Eng.
, vol.47
, Issue.5
, pp. 14-19
-
-
Abi-Karam, T.1
-
2
-
-
0033101635
-
Framework for evaluating bids of construction contractors
-
0742-597X, (),. 10.1061/(ASCE)0742-597X(1999)15:2(72)
-
Alsugair, A. M. (1999). " Framework for evaluating bids of construction contractors.." J. Manage. Eng. 0742-597X, 15 (2), 72-78. 10.1061/(ASCE)0742-597X(1999)15:2(72)
-
(1999)
J. Manage. Eng.
, vol.15
, Issue.2
, pp. 72-78
-
-
Alsugair, A.M.1
-
3
-
-
0029378035
-
Monte Carlo simulation as tool for process reengineering
-
0742-597X, (),. 10.1061/(ASCE)0742-597X(1995)11:5(46)
-
Back, W. E., and Bell, L. C. (1995). " Monte Carlo simulation as tool for process reengineering.." J. Manage. Eng. 0742-597X, 11 (5), 46-53. 10.1061/(ASCE)0742-597X(1995)11:5(46)
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.5
, pp. 46-53
-
-
Back, W.E.1
Bell, L.C.2
-
4
-
-
0042647197
-
Construction resource models by Monte Carlo simulation
-
0144-6193.
-
Baxendale, T. (1984). " Construction resource models by Monte Carlo simulation.." Constr. Manage. Econom. 0144-6193, 2 (3), 201-217.
-
(1984)
Constr. Manage. Econom.
, vol.2
, Issue.3
, pp. 201-217
-
-
Baxendale, T.1
-
5
-
-
32944469606
-
Comparing procurement methods for design-build projects
-
" 0733-9364, (),. 10.1061/(ASCE)0733-9364(2006)132:3(230)
-
El Wardani, M. A., Messner, J. I., and Horman, M. J. (2005). " Comparing procurement methods for design-build projects.." J. Constr. Eng. Manage. 0733-9364, 132 (3), 230-238. 10.1061/(ASCE)0733-9364(2006)132:3(230)
-
(2005)
J. Constr. Eng. Manage.
, vol.132
, Issue.3
, pp. 230-238
-
-
El Wardani, M.A.1
Messner, J.I.2
Horman, M.J.3
-
6
-
-
0032207592
-
Comparison of US project delivery systems
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1998)124:6(435)
-
Konchar, M., and Sanvido, V. (1998). " Comparison of US project delivery systems.." J. Constr. Eng. Manage. 0733-9364, 124 (6), 435-444. 10.1061/(ASCE)0733-9364(1998)124:6(435)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
7
-
-
1642436831
-
Monte Carlo simulation for schedule risks
-
New Orleans.
-
McCabe, B. (2003). " Monte Carlo simulation for schedule risks.." Proc., 2003 Winter Simulation Conf., New Orleans.
-
(2003)
Proc., 2003 Winter Simulation Conf.
-
-
McCabe, B.1
-
8
-
-
9144248650
-
Engineering the procurement process to achieve best value
-
1532-6748, (),. 10.1061/(ASCE)1532-6748(2003)3:3(137)
-
Molenaar, K. R., and Johnson, D. E. (2003). " Engineering the procurement process to achieve best value.." Leadership Manage. Eng. 1532-6748, 3 (3), 137-141. 10.1061/(ASCE)1532-6748(2003)3:3(137)
-
(2003)
Leadership Manage. Eng.
, vol.3
, Issue.3
, pp. 137-141
-
-
Molenaar, K.R.1
Johnson, D.E.2
-
9
-
-
70349361740
-
-
Construction Institute, ASCE, Reston, Va.
-
Molenaar, K. R., and Yakowenko, G. (2007). Alternative project delivery, procurement, and contracting methods for highways, Construction Institute, ASCE, Reston, Va.
-
(2007)
Alternative Project Delivery, Procurement, and Contracting Methods for Highways
-
-
Molenaar, K.R.1
Yakowenko, G.2
-
10
-
-
3242721188
-
Targeting optimum value in public sector projects through best value'-focused contractor selection
-
" 0969-9988, (),. 10.1108/09699980310509390
-
Palaneeswaran, E., Kumaraswamy, M., and Ng, T. (2003). " Targeting optimum value in public sector projects through best value'-focused contractor selection.." Eng., Constr., Archit. Manage. 0969-9988, 10 (6), 418-431. 10.1108/09699980310509390
-
(2003)
Eng., Constr., Archit. Manage.
, vol.10
, Issue.6
, pp. 418-431
-
-
Palaneeswaran, E.1
Kumaraswamy, M.2
Ng, T.3
-
11
-
-
0034271075
-
Contractor selection for design/build projects
-
DOI 10.1061/(ASCE)0733-9364(2000)126:5(331)
-
Palaneeswaran, E., Kumaraswamy, M., and Ng, T. (2000). " Contractor selection for design/build projects.." Eng., Constr., Archit. Manage. 0969-9988, 126 (5), 331-330. 10.1061/(ASCE)0733-9364(2000)126:5(331) (Pubitemid 30936150)
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.5
, pp. 331-339
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
12
-
-
33746190783
-
Modeling cost escalation in large infrastructure projects
-
DOI 10.1061/(ASCE)0733-9364(2006)132:8(853)
-
Touran, A., and Lopez, R. (2006). " Modeling cost escalation in large infrastructure projects.." J. Constr. Eng. Manage. 0733-9364, 132 (8), 853-860. 10.1061/(ASCE)0733-9364(2006)132:8(853) (Pubitemid 44090932)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.8
, pp. 853-860
-
-
Touran, A.1
Lopez, R.2
|