메뉴 건너뛰기




Volumn 137, Issue 1, 2011, Pages 30-38

New method for measuring the safety risk of construction activities: Task demand assessment

Author keywords

Construction safety; Risk assessment methodology; Safety risk assessment; Task demands

Indexed keywords

ACCIDENT POTENTIAL; ACTUAL OPERATION; ANALYSIS AND DESIGN; CONCRETE PAVING; CONSTRUCTION ACTIVITIES; CONSTRUCTION OPERATIONS; CONSTRUCTION SAFETY; KEY ISSUES; OPERATION PARAMETERS; PRODUCTION VARIABLES; RISK ASSESSMENT METHODOLOGY; RISK FACTORS; SAFETY MANAGEMENT; SAFETY RISK ASSESSMENTS; SAFETY RISKS; TASK DEMAND; TASK DEMANDS;

EID: 78650351818     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000246     Document Type: Article
Times cited : (64)

References (37)
  • 1
    • 13944256209 scopus 로고    scopus 로고
    • Physiological demands during construction work
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2002)128:5(427)
    • Abdelhamid, T. S., and Everett, J. G. (2002). " Physiological demands during construction work." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (5), 427-437. 10.1061/(ASCE)0733-9364(2002)128:5(427)
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.5 , pp. 427-437
    • Abdelhamid, T.S.1    Everett, J.G.2
  • 2
    • 33646197919 scopus 로고    scopus 로고
    • Comparative injury and fatality risk analysis of building trades
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:5(533)
    • Baradan, S., and Usmen, M. A. (2006). " Comparative injury and fatality risk analysis of building trades." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (5), 533-539. 10.1061/(ASCE)0733-9364(2006)132:5(533)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 533-539
    • Baradan, S.1    Usmen, M.A.2
  • 3
    • 0035333663 scopus 로고    scopus 로고
    • Technological intervention to eliminate back injury risks for nailing
    • DOI 10.1061/(ASCE)0733-9364(2001)127:3(245), Reportnr 22175
    • Bernold, L. E., Lorenc, S. J., and Davis, M. L. (2001). " Technological intervention to eliminate back injury risks for nailing." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (3), 245-250. 10.1061/(ASCE)0733- 9364(2001)127:3(245) (Pubitemid 32508544)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 245-250
    • Bernold, L.E.1    Lorenc, S.J.2    Davis, M.L.3
  • 4
    • 33646174810 scopus 로고
    • Risk management and assessment
    • Van Nostrand Reinhold, New York.
    • Brauer, R. L. (1994). " Risk management and assessment." Safety and health for engineers, Van Nostrand Reinhold, New York, 543-572.
    • (1994) Safety and Health for Engineers , pp. 543-572
    • Brauer, R.L.1
  • 5
    • 0029892524 scopus 로고    scopus 로고
    • PATH: A work sampling-based approach to ergonomic job analysis for construction and other non-repetitive work
    • DOI 10.1016/0003-6870(95)00078-X
    • Buchholz, B., Paquet, V., Punnett, D., Lee, D., and Moir, S. (1996). " PATH: A work sampling-based approach to ergonomic job analysis for construction and other non-repetitive work." Appl. Ergon ZZZZZZ 0003-6870, 27 (3), 177-187. 10.1016/0003-6870(95)00078-X (Pubitemid 26168112)
    • (1996) Applied Ergonomics , vol.27 , Issue.3 , pp. 177-187
    • Buchholz, B.1    Paquet, V.2    Punnett, L.3    Lee, D.4    Moir, S.5
  • 6
    • 64449084500 scopus 로고    scopus 로고
    • Work fatigue and physiological symptoms in different occupations of high-elevation construction workers
    • ZZZZZZ 0003-6870, 10.1016/j.apergo.2008.04.017
    • Chang, F., Sun, Y., Chuang, K., and Hsu, D. (2009). " Work fatigue and physiological symptoms in different occupations of high-elevation construction workers." Appl. Ergon ZZZZZZ 0003-6870, 40 (4), 591-596. 10.1016/j.apergo.2008.04.017
    • (2009) Appl. Ergon , vol.40 , Issue.4 , pp. 591-596
    • Chang, F.1    Sun, Y.2    Chuang, K.3    Hsu, D.4
  • 7
    • 18744367509 scopus 로고    scopus 로고
    • Modified method time measurements for ergonomic planning production systems in the manufacturing industry
    • DOI 10.1080/00207540050204911
    • Christmansson, M., Falck, A.-C., Ampazis, J., Forsman, M., Rasmusson, L., and Kadefors, R. (2000). " Modified method time measurements for ergonomic planning of production systems in the manufacturing industry." Int. J. Prod. Res. IJPRB8 0020-7543, 38 (17), 4051-4059. 10.1080/00207540050204911 (Pubitemid 35401886)
    • (2000) International Journal of Production Research , vol.38 , Issue.17 SPEC. , pp. 4051-4059
    • Christmansson, M.1    Falck, A.-C.2    Amprazis, J.3    Forsman, M.4    Rasmusson, L.5    Kadefors, R.6
  • 8
    • 35148887144 scopus 로고    scopus 로고
    • The development of the Quick Exposure Check (QEC) for assessing exposure to risk factors for work-related musculoskeletal disorders
    • DOI 10.1016/j.apergo.2007.03.002, PII S0003687007000257
    • David, G., Woods, V., Li, G., and Buckle, P. (2008). " The development of the quick exposure check (QEC) for assessing exposure to risk factors for work-related musculoskeletal disorders." Appl. Ergon ZZZZZZ 0003-6870, 39 (1), 57-69. 10.1016/j.apergo.2007.03.002 (Pubitemid 47534196)
    • (2008) Applied Ergonomics , vol.39 , Issue.1 , pp. 57-69
    • David, G.1    Woods, V.2    Li, G.3    Buckle, P.4
  • 9
    • 18944398270 scopus 로고    scopus 로고
    • Ergonomic methods for assessing exposure to risk factors for work-related musculoskeletal disorders
    • DOI 10.1093/occmed/kqi082
    • David, G. C. (2005). " Ergonomic methods for assessing exposure to risk factors for work-related musculoskeletal disorders." Occup. Med. (Chic. Ill), 55 (3), 190-199. 10.1093/occmed/kqi082 0096-0659 (Pubitemid 40704163)
    • (2005) Occupational Medicine , vol.55 , Issue.3 , pp. 190-199
    • David, G.C.1
  • 10
    • 0033101229 scopus 로고    scopus 로고
    • Overexertion injuries in construction
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:2(109)
    • Everett, J. (1999). " Overexertion injuries in construction." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (2), 109-114. 10.1061/(ASCE)0733- 9364(1999)125:2(109)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.2 , pp. 109-114
    • Everett, J.1
  • 11
    • 18044379728 scopus 로고    scopus 로고
    • Behavior-based safety and occupational risk management
    • DOI 10.1177/0145445504273287
    • Geller, E. S. (2005). " Behavior-based safety and occupational risk management." Behav. Modif ZZZZZZ 0145-4455, 29 (3), 539-561. 10.1177/0145445504273287 (Pubitemid 40604818)
    • (2005) Behavior Modification , vol.29 , Issue.3 , pp. 539-561
    • Geller, E.S.1
  • 12
    • 70349324675 scopus 로고    scopus 로고
    • Activity-based safety risk quantification for concrete formwork construction
    • JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000071
    • Hallowell, M. R., and Gambatese, J. A. (2009). " Activity-based safety risk quantification for concrete formwork construction." J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 990-998. 10.1061/(ASCE)CO.1943-7862. 0000071
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 990-998
    • Hallowell, M.R.1    Gambatese, J.A.2
  • 14
    • 40949115266 scopus 로고
    • Development of NASA-TLX (task load index): Results of empirical and theoretical research
    • P. A. Hancock and N. Meshkati, eds., North Holland, Amsterdam, The Netherlands, 10.1016/S0166-4115(08)62386-9
    • Hart, S. G., and Staveland, L. E. (1988). " Development of NASA-TLX (task load index): Results of empirical and theoretical research." Human mental workload, P. A. Hancock, and, N. Meshkati, eds., North Holland, Amsterdam, The Netherlands, 139-183. 10.1016/S0166-4115(08)62386-9
    • (1988) Human Mental Workload , pp. 139-183
    • Hart, S.G.1    Staveland, L.E.2
  • 15
    • 0027805668 scopus 로고
    • Interaction between subcycles: One key to improved methods
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1993)119:4(714)
    • Howell, G. A., Laufer, A., and Ballard, G. (1993). " Interaction between subcycles: One key to improved methods." J. Constr. Eng. Manage. JCEMD4 0733-9364, 119, 714. 10.1061/(ASCE)0733-9364(1993)119:4(714)
    • (1993) J. Constr. Eng. Manage. , vol.119 , pp. 714
    • Howell, G.A.1    Laufer, A.2    Ballard, G.3
  • 17
    • 13944263258 scopus 로고    scopus 로고
    • Risk assessment in construction
    • DOI 10.1061/(ASCE)0733-9364(2003)129:5(492)
    • Jannadi, O., and Almishari, S. (2003). " Risk assessment in construction." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (5), 492-500. 10.1061/(ASCE)0733-9364(2003)129:5(492) (Pubitemid 40265436)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 492-500
    • Jannadi, O.A.1    Almishari, S.2
  • 18
    • 0345227091 scopus 로고
    • An ergonomic model for workplace assessment
    • Vol., Human Factors Association of Canada, Toronoto.
    • Kadefors, R. (1994). " An ergonomic model for workplace assessment." 12th Triennial Congress of the Int. Ergonomics Association, Vol. 5, Human Factors Association of Canada, Toronoto, 210-212.
    • (1994) 12th Triennial Congress of the Int. Ergonomics Association , vol.5 , pp. 210-212
    • Kadefors, R.1
  • 19
    • 0002979807 scopus 로고    scopus 로고
    • Evaluation of working situations using the cube model approach
    • Vol., Finnish Institute of Occupational Health, Helsinki.
    • Kadefors, R. (1997). " Evaluation of working situations using the cube model approach." Proc., 13th Triennial Congress of the Int. Ergonomics Association, Vol. 4, Finnish Institute of Occupational Health, Helsinki, 174-176.
    • (1997) Proc., 13th Triennial Congress of the Int. Ergonomics Association , vol.4 , pp. 174-176
    • Kadefors, R.1
  • 20
    • 0017606427 scopus 로고
    • Correcting working postures in industry: A practical method for analysis
    • ZZZZZZ 0003-6870, 10.1016/0003-6870(77)90164-8
    • Karhu, O., Kansi, P., and Kuorinka, I. (1977). " Correcting working postures in industry: A practical method for analysis." Appl. Ergon ZZZZZZ 0003-6870, 8, 199-201. 10.1016/0003-6870(77)90164-8
    • (1977) Appl. Ergon , vol.8 , pp. 199-201
    • Karhu, O.1    Kansi, P.2    Kuorinka, I.3
  • 23
    • 13944273770 scopus 로고    scopus 로고
    • Predictive tool for estimating accident risk
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(431)
    • Lee, S., and Halpin, D. (2003). " Predictive tool for estimating accident risk." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 431-436. 10.1061/(ASCE)0733-9364(2003)129:4(431) (Pubitemid 40265457)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 431-436
    • Lee, S.1    Halpin, D.W.2
  • 24
    • 0033134617 scopus 로고    scopus 로고
    • Current techniques for assessing physical exposure to work-related musculoskeletal risks, with emphasis on posture-based methods
    • DOI 10.1080/001401399185388
    • Li, G., and Buckle, P. (1999). " Current techniques for assessing physical exposure to work-related musculoskeletal risks, with emphasis on posture-based methods." Ergonomics ERGOAX 0014-0139, 42, 674-695. 10.1080/001401399185388 (Pubitemid 29176413)
    • (1999) Ergonomics , vol.42 , Issue.5 , pp. 674-695
    • Li, G.1    Buckle, P.2
  • 25
    • 0032677122 scopus 로고    scopus 로고
    • General-purpose systems for effective construction simulation
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:4(265)
    • Martinez, J. C., and Ioannou, P. G. (1999). " General-purpose systems for effective construction simulation." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (4), 265-276. 10.1061/(ASCE)0733-9364(1999)125:4(265)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 265-276
    • Martinez, J.C.1    Ioannou, P.G.2
  • 26
    • 77956780554 scopus 로고
    • An eclectic and critical review of four primary mental workload assessment methods: A guide for developing a comprehensive model
    • P. A. Hancock and N. Meshkati, eds., Elsevier, North-Holland, Amsterdam, The Netherlands, 10.1016/S0166-4115(08)62391-2
    • Meshkati, N., and Loewenthal, A. (1988). " An eclectic and critical review of four primary mental workload assessment methods: A guide for developing a comprehensive model." Human mental workload, P. A. Hancock, and, N. Meshkati, eds., Elsevier, North-Holland, Amsterdam, The Netherlands, 251-267. 10.1016/S0166-4115(08)62391-2
    • (1988) Human Mental Workload , pp. 251-267
    • Meshkati, N.1    Loewenthal, A.2
  • 27
    • 69149099610 scopus 로고    scopus 로고
    • Cognitive approach to construction safety: Task demand-capability model
    • JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000060
    • Mitropoulos, P., Cupido, G., and Namboodiri, M. (2009). " Cognitive approach to construction safety: Task demand-capability model." J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (9), 881-889. 10.1061/(ASCE)CO.1943-7862. 0000060
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.9 , pp. 881-889
    • Mitropoulos, P.1    Cupido, G.2    Namboodiri, M.3
  • 29
    • 78650325098 scopus 로고    scopus 로고
    • National Safety Council. "." 〈〉 (May 2009).
    • National Safety Council. (2009). " Occupational safety terms and concepts." 〈 http://www.nsc.org/resources/issues/safetyknow/safety- terms.aspx 〉 (May 2009).
    • (2009) Occupational Safety Terms and Concepts
  • 31
    • 77956721038 scopus 로고
    • The subjective workload assessment technique: A scaling procedure for measuring mental workload
    • P. A. Hancock and N. Meshkati, eds., Elsevier, North-Holland, Amsterdam, The Netherlands, 10.1016/S0166-4115(08)62387-0
    • Reid, G. B., and Nygren, T. E. (1988). " The subjective workload assessment technique: A scaling procedure for measuring mental workload." Human mental workload, P. A. Hancock, and, N. Meshkati, eds., Elsevier, North-Holland, Amsterdam, The Netherlands, 185-218. 10.1016/S0166-4115(08)62387- 0
    • (1988) Human Mental Workload , pp. 185-218
    • Reid, G.B.1    Nygren, T.E.2
  • 32
    • 62749196468 scopus 로고    scopus 로고
    • Risk assessment and analysis of workload in an industrialized construction process
    • A. ".".
    • Rwamamara, R. A. (2007). " Risk assessment and analysis of workload in an industrialized construction process." Construction Information Quarterly, 9 (2), 80-85.
    • (2007) Construction Information Quarterly , vol.9 , Issue.2 , pp. 80-85
    • Rwamamara, R.1
  • 33
    • 33644629525 scopus 로고    scopus 로고
    • Ergonomic assessment of suspended scaffolds
    • ZZZZZZ 0169-8141, 10.1016/j.ergon.2005.11.006
    • Saurin, A. T., and Guimarães, L. B. (2006). " Ergonomic assessment of suspended scaffolds." Int. J. Ind. Ergonom. ZZZZZZ 0169-8141, 36 (3), 229-237. 10.1016/j.ergon.2005.11.006
    • (2006) Int. J. Ind. Ergonom. , vol.36 , Issue.3 , pp. 229-237
    • Saurin, A.T.1    Guimarães, L.B.2
  • 34
    • 0027608008 scopus 로고
    • A cube model for the classification of work with hand tools and the formulation of functional requirements
    • DOI 10.1016/0003-6870(93)90009-X
    • Sperling, L., Dalhman, S., Kilbom, A., and Kadefors, R. (1993). " A cube model for the classification of work with hand tools and the formulation of functional requirements." Appl. Ergon ZZZZZZ 0003-6870, 24, 212-220. 10.1016/0003-6870(93)90009-X (Pubitemid 23215028)
    • (1993) Applied Ergonomics , vol.24 , Issue.3 , pp. 212-220
    • Sperling, L.1    Dahlman, S.2    Wikstrom, L.3    Kilbom, A.4    Kadefors, R.5
  • 35
    • 37249022830 scopus 로고    scopus 로고
    • Safety risk identification and assessment for Beijing olympic Venues construction
    • DOI 10.1061/(ASCE)0742-597X(2008)24:1(40)
    • Sun, Y., Fang, D., Wang, S., Dai, M., and Lv, X. (2008). " Safety risk identification and assessment for Beijing Olympic venues construction." J. Manage. Eng. JMENEA 0742-597X, 24 (1), 40-47. 10.1061/(ASCE)0742-597X(2008)24:1(40) (Pubitemid 350274459)
    • (2008) Journal of Management in Engineering , vol.24 , Issue.1 , pp. 40-47
    • Sun, Y.1    Fang, D.2    Wang, S.3    Dai, M.4    Lv, X.5
  • 36
    • 33644667825 scopus 로고    scopus 로고
    • Simulation-based safety evaluation model integrated with network schedule
    • DOI 10.1016/j.autcon.2005.06.015, PII S0926580505000804
    • Wang, W. C., Liu, J. J., and Chou, C. C. (2006). " Simulation based safety evaluation model integrated with network schedule." Autom. Constr. AUCOES 0926-5805, 15 (3), 341-354. 10.1016/j.autcon.2005.06.015 (Pubitemid 43332717)
    • (2006) Automation in Construction , vol.15 , Issue.3 , pp. 341-354
    • Wang, W.-C.1    Liu, J.-J.2    Chou, S.-C.3
  • 37
    • 33646753383 scopus 로고    scopus 로고
    • Scheduling-based risk estimation and safety planning for construction projects
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:6(626)
    • Yi, K., and Langford, D. (2006). " Scheduling-based risk estimation and safety planning for construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (6), 626-635. 10.1061/(ASCE)0733-9364(2006)132:6(626)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.6 , pp. 626-635
    • Yi, K.1    Langford, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.