메뉴 건너뛰기




Volumn 18, Issue , 2013, Pages 162-181

A novel integrated approach to project-level Automated Machine Control/Guidance systems in construction projects

Author keywords

Administrative process re engineering; Automated Machine Control; Multi agent system; Real time simulation

Indexed keywords

ADMINISTRATIVE PROCESS; AUTOMATED MACHINES; CONSTRUCTION PROJECTS; DIGITAL TERRAIN MODEL; MULTI AGENT SYSTEM (MAS); MULTIAGENT ARCHITECTURE; OPTIMAL APPLICATIONS; REAL TIME SIMULATIONS;

EID: 84878336739     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (14)

References (32)
  • 3
    • 0002816429 scopus 로고    scopus 로고
    • Distributed problem solving and planning
    • G. Weiss (Ed.), Cambridge: MIT Press
    • Durfee, E. (1999). Distributed Problem Solving and Planning. In G. Weiss (Ed.), Multi-Agent Systems and Applications (pp. 121-164). Cambridge: MIT Press.
    • (1999) Multi-Agent Systems and Applications , pp. 121-164
    • Durfee, E.1
  • 6
    • 84863295559 scopus 로고    scopus 로고
    • Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity
    • Phoenix
    • Hammad, A., & Zhang, C. (2011). Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity. Winter Simulation Conference. Phoenix.
    • (2011) Winter Simulation Conference
    • Hammad, A.1    Zhang, C.2
  • 7
    • 37249053771 scopus 로고    scopus 로고
    • Simulation of concrete paving operations on interstate-74
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(2)
    • Hassan, M. M., & Gruber, S. (2008). Simulation of Concrete Paving Operations on Interstate-74. Journal of Construction Engineering and Management, 134(2), 2-9. (Pubitemid 350265372)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 2-9
    • Hassan, M.M.1    Gruber, S.2
  • 8
    • 84878336612 scopus 로고    scopus 로고
    • (February 13). Retrieved from Hobby Engine
    • Hobby Engine. (2013, February 13). Retrieved from Hobby Engine: Http://www.hobbyengine.com.hk/catalog/product.php?cid=31
    • (2013)
  • 9
    • 84878285228 scopus 로고    scopus 로고
    • Status of NCHRP Project 10-77, Use of automatic machine guidance within the transportation industry
    • Jahren, C. T. (2011). Status of NCHRP Project 10-77, Use of Automatic Machine Guidance within the Transportation Industry. Subcommittee on Construction Annual Meeting.
    • (2011) Subcommittee on Construction Annual Meeting
    • Jahren, C.T.1
  • 11
    • 84878328775 scopus 로고    scopus 로고
    • JCMMRI. Japan Construction Methods and Machinery Research Institute. Retrieved from
    • JCMMRI. (2012). Japan Construction Methods and Machinery Research Institute. Retrieved from http://www.jcmanet.or.jp/english/cmi.html
    • (2012)
  • 13
    • 36348997718 scopus 로고    scopus 로고
    • Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms
    • DOI 10.1139/L07-029
    • Lu, M., Dai, F., & Chen, W. (2007). Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization. Canadian Journal of Civil Engineering, 34, 912-922. (Pubitemid 350141828)
    • (2007) Canadian Journal of Civil Engineering , vol.34 , Issue.8 , pp. 912-922
    • Lu, M.1    Dai, F.2    Chen, W.3
  • 16
    • 77956615844 scopus 로고    scopus 로고
    • The use of computing technology in highway construction as a total jobsite management tool
    • Perkinson, C. L., Bayraktar, M. E., & Ahmad, I. (2010). The use of computing technology in highway construction as a total jobsite management tool. Automation in Construction, 19(7), 884-897.
    • (2010) Automation in Construction , vol.19 , Issue.7 , pp. 884-897
    • Perkinson, C.L.1    Bayraktar, M.E.2    Ahmad, I.3
  • 21
    • 60749134419 scopus 로고    scopus 로고
    • A framework for real-time simulation of heavy construction operations
    • S. J. Mason, R. R. Hill, L. Monch, O. Rose, T. Jefferson, & W. Fowler (Ed.). Piscataway, New Jersey
    • Song, L., Ramos, F., & Arnold, K. (2008). A framework for real-time simulation of heavy construction operations. In S. J. Mason, R. R. Hill, L. Monch, O. Rose, T. Jefferson, & W. Fowler (Ed.), Proceeding of the 2008 Winter Simulation Conference, (pp. 2387-2395). Piscataway, New Jersey.
    • (2008) Proceeding of the 2008 Winter Simulation Conference , pp. 2387-2395
    • Song, L.1    Ramos, F.2    Arnold, K.3
  • 22
    • 84874704354 scopus 로고    scopus 로고
    • Improving highway project delivery
    • Washington, D.C
    • Torres, H. N., & Ruiz, M. (2011). Improving Highway Project Delivery. TRB Annual Meeting. Washington, D.C.
    • (2011) TRB Annual Meeting
    • Torres, H.N.1    Ruiz, M.2
  • 23
    • 84878337170 scopus 로고    scopus 로고
    • (February 13). Retrieved from Ubisence
    • Ubisense. (2013, February 13). Retrieved from Ubisence: http://www.ubisense.net/en/
    • (2013)
  • 28
    • 0035278717 scopus 로고    scopus 로고
    • Simulation of concrete batch plant production
    • DOI 10.1061/(ASCE)0733-9364(2001)127:2(132)
    • Zayed, M. T., & Halpin, D. (2001). Simulation of Concrete Batch Plant Production. Journal of Construction Engineering and Management, 127(2), 132-141. (Pubitemid 32297261)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.2 , pp. 132-141
    • Zayed, T.M.1    Halpin, D.2
  • 29
    • 84869464934 scopus 로고    scopus 로고
    • Multi-agent approach for real-time collision avoidance and path re-planning on construction sites
    • In Press
    • Zhang, C., & Hammad, A. (2012). Multi-agent approach for real-time collision avoidance and path re-planning on construction sites. Journal of Computing in Civil Engineering, (In Press and available on http://ascelibrary. org/doi/abs/10.1061/%28ASCE%29CP.1943-5487.0000181).
    • (2012) Journal of Computing in Civil Engineering
    • Zhang, C.1    Hammad, A.2
  • 30
    • 70350157044 scopus 로고    scopus 로고
    • Collaborative multi-agent systems for construction equipment based on real-time field data capturing
    • Zhang, C., Hammad, A., & Albahnassi, H. (2009). Collaborative multi-agent systems for construction equipment based on real-time field data capturing. ITcon, 14, 204-228, http://www.itcon.org/2009/16.
    • (2009) ITcon , vol.14 , pp. 204-228
    • Zhang, C.1    Hammad, A.2    Albahnassi, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.