메뉴 건너뛰기




Volumn 19, Issue 7, 2010, Pages 884-897

The use of computing technology in highway construction as a total jobsite management tool

Author keywords

GPS; Information technology; Site automation and data collection

Indexed keywords

BENEFITS AND COSTS; COMPUTING TECHNOLOGY; CONSTRUCTION CONTRACTORS; GPS; GPS DATA; HEAVY CONSTRUCTION; HIGHWAY CONSTRUCTION; ICT INFRASTRUCTURES; ICT USE; INFORMATION AND COMMUNICATIONS TECHNOLOGY; JOBSITE MANAGEMENT; MANAGEMENT APPLICATIONS; ORGANIZATIONAL RESTRUCTURING; REAL-TIME GPS; SITE AUTOMATION;

EID: 77956615844     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2010.06.002     Document Type: Article
Times cited : (28)

References (40)
  • 1
  • 6
    • 0029666716 scopus 로고    scopus 로고
    • What can real-time positioning do for construction?
    • Yvan J. Beliveau What can real-time positioning do for construction? Automation in Construction 5 1996 79 89
    • (1996) Automation in Construction , vol.5 , pp. 79-89
    • Beliveau, Y.J.1
  • 7
    • 0031188352 scopus 로고    scopus 로고
    • Building a consortium for advanced positioning systems
    • Y. Beliveau Building a consortium for advanced positioning systems Journal of Management in Engineering 1997 26 29
    • (1997) Journal of Management in Engineering , pp. 26-29
    • Beliveau, Y.1
  • 12
    • 0002481047 scopus 로고
    • The new industrial engineering: Information technology and business process redesign
    • Davenport, and Short The new industrial engineering: information technology and business process redesign Sloan Management Review 31 4 1990 11 27
    • (1990) Sloan Management Review , vol.31 , Issue.4 , pp. 11-27
    • Davenport1    Short2
  • 13
    • 84986099170 scopus 로고    scopus 로고
    • Organizational design: The continuing influence of information technology
    • C. Dibrell, and T. Miller Organizational design: the continuing influence of information technology Management Design 40 6 2002 620 627
    • (2002) Management Design , vol.40 , Issue.6 , pp. 620-627
    • Dibrell, C.1    Miller, T.2
  • 15
    • 0031288381 scopus 로고    scopus 로고
    • Business process change and organizational performance: Exploring an antecedent model
    • S. Guha, V. Grover, W. Kettinger, and J. Teng Business process change and organizational performance: exploring an antecedent model Journal of Management Information Systems 14 1 1997 119 154
    • (1997) Journal of Management Information Systems , vol.14 , Issue.1 , pp. 119-154
    • Guha, S.1    Grover, V.2    Kettinger, W.3    Teng, J.4
  • 20
    • 0026494564 scopus 로고
    • The balanced scorecard: Measures that drive performance
    • R. Kaplan, and D. Norton The balanced scorecard: measures that drive performance Harvard Business Review 1992 71 79 January-February
    • (1992) Harvard Business Review , pp. 71-79
    • Kaplan, R.1    Norton, D.2
  • 23
    • 0035420949 scopus 로고    scopus 로고
    • Evaluation of IT cost in construction
    • P. Love, and Z. Irani Evaluation of IT cost in construction Automation in Construction 10 2001 649 658
    • (2001) Automation in Construction , vol.10 , pp. 649-658
    • Love, P.1    Irani, Z.2
  • 24
    • 14544298334 scopus 로고    scopus 로고
    • Researching the investment of information technology in construction: An examination of evaluation practices
    • P. Love, Z. Irani, and D. Edwards Researching the investment of information technology in construction: an examination of evaluation practices Automation in Construction 14 2005 569 582
    • (2005) Automation in Construction , vol.14 , pp. 569-582
    • Love, P.1    Irani, Z.2    Edwards, D.3
  • 27
    • 0037332784 scopus 로고    scopus 로고
    • Monitoring labor inputs: Automated-data-collection model and enabling technologies
    • R. Navon, and E. Goldschmidt Monitoring labor inputs: automated-data-collection model and enabling technologies Automation in Construction 12 2002 185 199
    • (2002) Automation in Construction , vol.12 , pp. 185-199
    • Navon, R.1    Goldschmidt, E.2
  • 30
    • 14544298805 scopus 로고    scopus 로고
    • Automated project performance control of construction projects
    • R. Navon Automated project performance control of construction projects Automation in Construction 14 2005 467 476
    • (2005) Automation in Construction , vol.14 , pp. 467-476
    • Navon, R.1
  • 32
    • 0003982844 scopus 로고    scopus 로고
    • 2nd Ed. Open University Press New York
    • J. Pallant SPSS Survival Manual 2nd Ed. 2004 Open University Press New York
    • (2004) SPSS Survival Manual
    • Pallant, J.1
  • 34
    • 0343193299 scopus 로고    scopus 로고
    • High-precision application of GPS in the field of real-time equipment positioning
    • F. Peyret, D. Betaille, and G. Hintzy High-precision application of GPS in the field of real-time equipment positioning Automation in Construction 9 2000 299 314
    • (2000) Automation in Construction , vol.9 , pp. 299-314
    • Peyret, F.1    Betaille, D.2    Hintzy, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.