-
5
-
-
0029470507
-
Real-time position measurement integrated with CAD: Technologies and their protocols
-
Yvan J. Beliveau, Michael J. Williams, Gerald M. King, and Anthony R. Niles Real-time position measurement integrated with CAD: technologies and their protocols Journal of Construction Engineering and Management 121 4 1995 346 354
-
(1995)
Journal of Construction Engineering and Management
, vol.121
, Issue.4
, pp. 346-354
-
-
Beliveau, Y.J.1
Williams, M.J.2
King, G.M.3
Niles, A.R.4
-
6
-
-
0029666716
-
What can real-time positioning do for construction?
-
Yvan J. Beliveau What can real-time positioning do for construction? Automation in Construction 5 1996 79 89
-
(1996)
Automation in Construction
, vol.5
, pp. 79-89
-
-
Beliveau, Y.J.1
-
7
-
-
0031188352
-
Building a consortium for advanced positioning systems
-
Y. Beliveau Building a consortium for advanced positioning systems Journal of Management in Engineering 1997 26 29
-
(1997)
Journal of Management in Engineering
, pp. 26-29
-
-
Beliveau, Y.1
-
9
-
-
70350047126
-
Stringless Portland cement concrete paving
-
J.K. Cable, E.J. Jaselkis, R.C. Walters, L. Li, and C.R. Bauer Stringless Portland cement concrete paving Journal of Construction Engineering and Management, ASCE 135 11 2009 1253 1260
-
(2009)
Journal of Construction Engineering and Management, ASCE
, vol.135
, Issue.11
, pp. 1253-1260
-
-
Cable, J.K.1
Jaselkis, E.J.2
Walters, R.C.3
Li, L.4
Bauer, C.R.5
-
10
-
-
33745325795
-
Using global positioning system to improve materials-locating processes on industrial projects
-
C.H. Caldas, D.G. Torrent, and C.T. Haas Using global positioning system to improve materials-locating processes on industrial projects Journal of Construction Engineering and Management, ASCE 132 7 2006 741 749
-
(2006)
Journal of Construction Engineering and Management, ASCE
, vol.132
, Issue.7
, pp. 741-749
-
-
Caldas, C.H.1
Torrent, D.G.2
Haas, C.T.3
-
12
-
-
0002481047
-
The new industrial engineering: Information technology and business process redesign
-
Davenport, and Short The new industrial engineering: information technology and business process redesign Sloan Management Review 31 4 1990 11 27
-
(1990)
Sloan Management Review
, vol.31
, Issue.4
, pp. 11-27
-
-
Davenport1
Short2
-
13
-
-
84986099170
-
Organizational design: The continuing influence of information technology
-
C. Dibrell, and T. Miller Organizational design: the continuing influence of information technology Management Design 40 6 2002 620 627
-
(2002)
Management Design
, vol.40
, Issue.6
, pp. 620-627
-
-
Dibrell, C.1
Miller, T.2
-
15
-
-
0031288381
-
Business process change and organizational performance: Exploring an antecedent model
-
S. Guha, V. Grover, W. Kettinger, and J. Teng Business process change and organizational performance: exploring an antecedent model Journal of Management Information Systems 14 1 1997 119 154
-
(1997)
Journal of Management Information Systems
, vol.14
, Issue.1
, pp. 119-154
-
-
Guha, S.1
Grover, V.2
Kettinger, W.3
Teng, J.4
-
20
-
-
0026494564
-
The balanced scorecard: Measures that drive performance
-
R. Kaplan, and D. Norton The balanced scorecard: measures that drive performance Harvard Business Review 1992 71 79 January-February
-
(1992)
Harvard Business Review
, pp. 71-79
-
-
Kaplan, R.1
Norton, D.2
-
21
-
-
0011423681
-
AutoPave: Towards an automated paving system for asphalt pavement compaction operations
-
B. Krishnamurthy, H. Tserng, R. Schmitt, J. Russell, H. Bahia, and A. Hanna AutoPave: towards an automated paving system for asphalt pavement compaction operations Automation in Construction 8 1998 165 180
-
(1998)
Automation in Construction
, vol.8
, pp. 165-180
-
-
Krishnamurthy, B.1
Tserng, H.2
Schmitt, R.3
Russell, J.4
Bahia, H.5
Hanna, A.6
-
22
-
-
1342322290
-
Open System for Road Information Support
-
A. Ligier, J. Fliender, J. Kajanen, and F. Peyret Open System for Road Information Support Proc., Int. Symp. on Automation and Robotics in Construction, Krakow, Poland 2001 205 210
-
(2001)
Proc., Int. Symp. on Automation and Robotics in Construction, Krakow, Poland
, pp. 205-210
-
-
Ligier, A.1
Fliender, J.2
Kajanen, J.3
Peyret, F.4
-
23
-
-
0035420949
-
Evaluation of IT cost in construction
-
P. Love, and Z. Irani Evaluation of IT cost in construction Automation in Construction 10 2001 649 658
-
(2001)
Automation in Construction
, vol.10
, pp. 649-658
-
-
Love, P.1
Irani, Z.2
-
24
-
-
14544298334
-
Researching the investment of information technology in construction: An examination of evaluation practices
-
P. Love, Z. Irani, and D. Edwards Researching the investment of information technology in construction: an examination of evaluation practices Automation in Construction 14 2005 569 582
-
(2005)
Automation in Construction
, vol.14
, pp. 569-582
-
-
Love, P.1
Irani, Z.2
Edwards, D.3
-
27
-
-
0037332784
-
Monitoring labor inputs: Automated-data-collection model and enabling technologies
-
R. Navon, and E. Goldschmidt Monitoring labor inputs: automated-data-collection model and enabling technologies Automation in Construction 12 2002 185 199
-
(2002)
Automation in Construction
, vol.12
, pp. 185-199
-
-
Navon, R.1
Goldschmidt, E.2
-
30
-
-
14544298805
-
Automated project performance control of construction projects
-
R. Navon Automated project performance control of construction projects Automation in Construction 14 2005 467 476
-
(2005)
Automation in Construction
, vol.14
, pp. 467-476
-
-
Navon, R.1
-
32
-
-
0003982844
-
-
2nd Ed. Open University Press New York
-
J. Pallant SPSS Survival Manual 2nd Ed. 2004 Open University Press New York
-
(2004)
SPSS Survival Manual
-
-
Pallant, J.1
-
34
-
-
0343193299
-
High-precision application of GPS in the field of real-time equipment positioning
-
F. Peyret, D. Betaille, and G. Hintzy High-precision application of GPS in the field of real-time equipment positioning Automation in Construction 9 2000 299 314
-
(2000)
Automation in Construction
, vol.9
, pp. 299-314
-
-
Peyret, F.1
Betaille, D.2
Hintzy, G.3
-
35
-
-
0033707986
-
The computer integrated road construction project
-
F. Peyret, J. Jurasz, A. Carrel, E. Zekri, and B. Gorham The computer integrated road construction project Automation in Construction 9 2000 447 461
-
(2000)
Automation in Construction
, vol.9
, pp. 447-461
-
-
Peyret, F.1
Jurasz, J.2
Carrel, A.3
Zekri, E.4
Gorham, B.5
-
37
-
-
77956614267
-
The ROI of Adopting Technology
-
B. Swearingen, and R. Pew The ROI of Adopting Technology Presented at the Third Annual Trimble Dimensions User Conference, Las Vegas, NV, November 5-7, 2007 2007
-
(2007)
Presented at the Third Annual Trimble Dimensions User Conference, Las Vegas, NV, November 5-7, 2007
-
-
Swearingen, B.1
Pew, R.2
-
38
-
-
77956619220
-
Facilitating the link between point-of-production workers and corporate ICT systems in construction
-
A. Thorpe, M. Ward, S. Bowden, and A. Price Facilitating the link between point-of-production workers and corporate ICT systems in construction Proc. of the 22nd Int.Conf. on Information Technology in Construction, CIB W78, Dresden, Germany 2005
-
(2005)
Proc. of the 22nd Int.Conf. on Information Technology in Construction, CIB W78, Dresden, Germany
-
-
Thorpe, A.1
Ward, M.2
Bowden, S.3
Price, A.4
|