-
1
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
R. Akella, and P. Kumar Optimal control of production rate in a failure prone manufacturing system IEEE Transactions on Automatic Control 31 2 1986 116 126
-
(1986)
IEEE Transactions on Automatic Control
, vol.31
, Issue.2
, pp. 116-126
-
-
Akella, R.1
Kumar, P.2
-
2
-
-
0032627437
-
Integrated production maintenance and quality model for imperfect processes
-
M. Ben-Daya Integrated production maintenance and quality model for imperfect processes IIE Transactions 31 6 1999 491 501
-
(1999)
IIE Transactions
, vol.31
, Issue.6
, pp. 491-501
-
-
Ben-Daya, M.1
-
3
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
M. Ben-Daya The economic production lot-sizing problem with imperfect production processes and imperfect maintenance International Journal of Production Economics 76 3 2002 257 264
-
(2002)
International Journal of Production Economics
, vol.76
, Issue.3
, pp. 257-264
-
-
Ben-Daya, M.1
-
4
-
-
27444445374
-
Integrated inventory control and inspection policies with deterministic demand
-
M. Ben-Daya, S. Noman, and M. Hariga Integrated inventory control and inspection policies with deterministic demand Computers & Operations Research 33 6 2006 1625 1638
-
(2006)
Computers & Operations Research
, vol.33
, Issue.6
, pp. 1625-1638
-
-
Ben-Daya, M.1
Noman, S.2
Hariga, M.3
-
5
-
-
34548668647
-
Integrated inventory and inspection policies for stochastic demand
-
M. Ben-Daya, and S. Noman Integrated inventory and inspection policies for stochastic demand European Journal of Operational Research 185 1 2008 159 169
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.1
, pp. 159-169
-
-
Ben-Daya, M.1
Noman, S.2
-
6
-
-
0004271456
-
-
Prentice-Hall, Upper Saddle River, NJ
-
D.H. Besterfield Quality Control 2009 Prentice-Hall, Upper Saddle River, NJ
-
(2009)
Quality Control
-
-
Besterfield, D.H.1
-
7
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
T. Bielecki, and P. Kumar Optimality of zero-inventory policies for unreliable manufacturing systems Operations Research 36 4 1988 532 541
-
(1988)
Operations Research
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.2
-
8
-
-
0025481509
-
Manufacturing flow control and preventing maintenance: A stochastic control approach
-
E.K. Boukas, and A. Haurie Manufacturing flow control and preventing maintenance: a stochastic control approach IEEE Transactions on Automatic Control 35 9 1990 1024 1031
-
(1990)
IEEE Transactions on Automatic Control
, vol.35
, Issue.9
, pp. 1024-1031
-
-
Boukas, E.K.1
Haurie, A.2
-
9
-
-
0034313014
-
An application of robust control technique to manufacturing systems with uncertain processing time
-
E. Boukas, P. Shi, and R. Agarwal An application of robust control technique to manufacturing systems with uncertain processing time Optimal Control Applications and Methods 21 6 2000 257 268
-
(2000)
Optimal Control Applications and Methods
, vol.21
, Issue.6
, pp. 257-268
-
-
Boukas, E.1
Shi, P.2
Agarwal, R.3
-
10
-
-
84870295031
-
Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay
-
B. Bouslah, A. Gharbi, R. Pellerin, and A. Hajji Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay International Journal of Production Research 51 1 2013 264 280
-
(2013)
International Journal of Production Research
, vol.51
, Issue.1
, pp. 264-280
-
-
Bouslah, B.1
Gharbi, A.2
Pellerin, R.3
Hajji, A.4
-
11
-
-
46149086146
-
Production lot sizing with process deterioration and machine breakdown under inspection schedule
-
T. Chakraborty, B. Giri, and K. Chaudhuri Production lot sizing with process deterioration and machine breakdown under inspection schedule Omega 37 2 2009 257 271
-
(2009)
Omega
, vol.37
, Issue.2
, pp. 257-271
-
-
Chakraborty, T.1
Giri, B.2
Chaudhuri, K.3
-
13
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
P. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging Engineering Optimization 35 4 2003 427 437
-
(2003)
Engineering Optimization
, vol.35
, Issue.4
, pp. 427-437
-
-
Chiu, P.1
-
14
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
S.W. Chiu, S.L. Wang, and Y.S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2 2007 664 676
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.S.P.3
-
15
-
-
0016031910
-
A new prior distribution for attributes sampling
-
W. Chiu A new prior distribution for attributes sampling Technometrics 16 1 1974 93 102
-
(1974)
Technometrics
, vol.16
, Issue.1
, pp. 93-102
-
-
Chiu, W.1
-
16
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
K.J. Chung Bounds for production lot sizing with machine breakdowns Computers & Industrial Engineering 32 1 1997 139 144
-
(1997)
Computers & Industrial Engineering
, vol.32
, Issue.1
, pp. 139-144
-
-
Chung, K.J.1
-
18
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
-
A. Gharbi, and J. Kenne Production and preventive maintenance rates control for a manufacturing system: an experimental design approach International Journal of Production Economics 65 3 2000 275 287
-
(2000)
International Journal of Production Economics
, vol.65
, Issue.3
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.2
-
19
-
-
0041417619
-
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
-
A. Gharbi, and J.P. Kenne Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems IIE Transactions 35 10 2003 941 952
-
(2003)
IIE Transactions
, vol.35
, Issue.10
, pp. 941-952
-
-
Gharbi, A.1
Kenne, J.P.2
-
20
-
-
19944389627
-
Computational aspects of an extended EMQ model with variable production rate
-
B. Giri, and T. Dohi Computational aspects of an extended EMQ model with variable production rate Computers & Operations Research 32 12 2005 3143 3161
-
(2005)
Computers & Operations Research
, vol.32
, Issue.12
, pp. 3143-3161
-
-
Giri, B.1
Dohi, T.2
-
21
-
-
9644264287
-
Optimal design of unreliable production-inventory systems with variable production rate
-
B. Giri, W. Yun, and T. Dohi Optimal design of unreliable production-inventory systems with variable production rate European Journal of Operational Research 162 2 2005 372 386
-
(2005)
European Journal of Operational Research
, vol.162
, Issue.2
, pp. 372-386
-
-
Giri, B.1
Yun, W.2
Dohi, T.3
-
23
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
H. Groenevelt, L. Pintelon, and A. Seidmann Production batching with machine breakdowns and safety stocks Operations Research 40 5 1992 959 971
-
(1992)
Operations Research
, vol.40
, Issue.5
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
24
-
-
84946645276
-
The compound hypergeometric distribution and a system of single sampling inspection plans based on prior distributions and costs
-
A. Hald The compound hypergeometric distribution and a system of single sampling inspection plans based on prior distributions and costs Technometrics 2 3 1960 275 340
-
(1960)
Technometrics
, vol.2
, Issue.3
, pp. 275-340
-
-
Hald, A.1
-
25
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek, and M.K. Salameh Production lot sizing with the reworking of imperfect quality items produced Production Planning & Control 12 6 2001 584 590
-
(2001)
Production Planning & Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
26
-
-
4043067882
-
Capacity and production managment in a single product manufacturing system
-
J.Q. Hu, P. Vakili, and L. Huang Capacity and production managment in a single product manufacturing system Annals of Operations Research 125 1 2004 191 204
-
(2004)
Annals of Operations Research
, vol.125
, Issue.1
, pp. 191-204
-
-
Hu, J.Q.1
Vakili, P.2
Huang, L.3
-
27
-
-
79955475463
-
A review of the extensions of a modified EOQ model for imperfect quality items
-
M. Khan, M.Y. Jaber, A.L. Guiffrida, and S. Zolfaghari A review of the extensions of a modified EOQ model for imperfect quality items International Journal of Production Economics 132 1 2011 1 12
-
(2011)
International Journal of Production Economics
, vol.132
, Issue.1
, pp. 1-12
-
-
Khan, M.1
Jaber, M.Y.2
Guiffrida, A.L.3
Zolfaghari, S.4
-
28
-
-
0028698197
-
Economic production lot size model with variable production rate and imperfect quality
-
M. Khouja, and A. Mehrez Economic production lot size model with variable production rate and imperfect quality The Journal of the Operational Research Society 45 12 1994 1405 1417
-
(1994)
The Journal of the Operational Research Society
, vol.45
, Issue.12
, pp. 1405-1417
-
-
Khouja, M.1
Mehrez, A.2
-
29
-
-
0031141332
-
An extended EMQ model for a failure prone machine with general lifetime distribution
-
C.H. Kim, and Y. Hong An extended EMQ model for a failure prone machine with general lifetime distribution International Journal of Production Economics 49 3 1997 215 223
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.3
, pp. 215-223
-
-
Kim, C.H.1
Hong, Y.2
-
31
-
-
36248994722
-
Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines
-
P. Lavoie, J.P. Kenné, and A. Gharbi Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines International Journal of Production Research 45 24 2007 5667 5685
-
(2007)
International Journal of Production Research
, vol.45
, Issue.24
, pp. 5667-5685
-
-
Lavoie, P.1
Kenné, J.P.2
Gharbi, A.3
-
32
-
-
74449083649
-
A comparative study of pull control mechanisms for unreliable homogenous transfer lines
-
P. Lavoie, A. Gharbi, and J.P. Kenné A comparative study of pull control mechanisms for unreliable homogenous transfer lines International Journal of Production Economics 124 1 2010 241 251
-
(2010)
International Journal of Production Economics
, vol.124
, Issue.1
, pp. 241-251
-
-
Lavoie, P.1
Gharbi, A.2
Kenné, J.P.3
-
34
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production systems
-
H.L. Lee, and M.J. Rosenblatt Simultaneous determination of production cycle and inspection schedules in a production systems Management Science 33 9 1987 1125 1136
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
35
-
-
56749174474
-
An analytical approach for performance evaluation and optimization of a two-stage production-distribution system
-
J. Li, A. Sava, and X. Xie An analytical approach for performance evaluation and optimization of a two-stage production-distribution system International Journal of Production Research 47 2 2009 403 414
-
(2009)
International Journal of Production Research
, vol.47
, Issue.2
, pp. 403-414
-
-
Li, J.1
Sava, A.2
Xie, X.3
-
36
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
G.L. Liao, Y.H. Chen, and S.H. Sheu Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance European Journal of Operational Research 195 2 2009 348 357
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.2
, pp. 348-357
-
-
Liao, G.L.1
Chen, Y.H.2
Sheu, S.H.3
-
37
-
-
0002257388
-
Green purchasing strategies: Trends and implications
-
H. Min, and W.P. Galle Green purchasing strategies: trends and implications Journal of Supply Chain Management 33 3 1997 10 17
-
(1997)
Journal of Supply Chain Management
, vol.33
, Issue.3
, pp. 10-17
-
-
Min, H.1
Galle, W.P.2
-
39
-
-
38749093302
-
Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay
-
I. Mourani, S. Hennequin, and X. Xie Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay International Journal of Production Economics 112 1 2008 26 36
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 26-36
-
-
Mourani, I.1
Hennequin, S.2
Xie, X.3
-
41
-
-
33646518571
-
Response surface analysis of a multi-product batch processing facility using a simulation metamodel
-
J.H. Noguera, and E.F. Watson Response surface analysis of a multi-product batch processing facility using a simulation metamodel International Journal of Production Economics 102 2 2006 333 343
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.2
, pp. 333-343
-
-
Noguera, J.H.1
Watson, E.F.2
-
43
-
-
0024067268
-
Joint determination of optimal inventory and quality control policy
-
M.H. Peters, H. Schneider, and K. Tang Joint determination of optimal inventory and quality control policy Management Science 34 8 1988 991 1004
-
(1988)
Management Science
, vol.34
, Issue.8
, pp. 991-1004
-
-
Peters, M.H.1
Schneider, H.2
Tang, K.3
-
44
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
E.L. Porteus Optimal lot sizing, process quality improvement and setup cost reduction Operations Research 34 1 1986 137 144
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
45
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1 1986 48 55
-
(1986)
IIE Transactions
, vol.18
, Issue.1
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
46
-
-
0033874992
-
Economic production quantity model for items with imperfect quality
-
M. Salameh, and M. Jaber Economic production quantity model for items with imperfect quality International Journal of Production Economics 64 1-3 2000 59 64
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.13
, pp. 59-64
-
-
Salameh, M.1
Jaber, M.2
-
47
-
-
70249126214
-
An economic production lot size model in an imperfect production system
-
S.S. Sana An economic production lot size model in an imperfect production system European Journal of Operational Research 201 1 2010 158 170
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.1
, pp. 158-170
-
-
Sana, S.S.1
|