메뉴 건너뛰기




Volumn 18, Issue , 2013, Pages 119-147

Use of embedded RFID tags in concrete element supply chains

Author keywords

Construction; Information technology; Logistics; Mobile technology; Radio identification; Supply chain

Indexed keywords

BUILDING INFORMATION MODELLING; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; LOCATION MANAGEMENT; MOBILE TECHNOLOGY; PRECAST CONCRETE COMPONENTS; RADIO IDENTIFICATIONS; REAL-TIME INFORMATION;

EID: 84876946866     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (36)

References (50)
  • 2
    • 84862005367 scopus 로고    scopus 로고
    • Management of building supported on virtual interactive models: Construction planning and preventive maintenance
    • Sampaio, A.Z., A.R.G., 2012. Management of building supported on virtual interactive models: construction planning and preventive maintenance. ITcon Vol. 17, pg. 121-133, http://www.itcon.org/2012/8.
    • (2012) ITcon , vol.17 , pp. 121-133
    • Sampaio, A.Z.A.R.G.1
  • 3
    • 10244234065 scopus 로고    scopus 로고
    • RFID technologies: Supply-chain applications and implementation issues
    • Angeles, R., 2005. Rfid Technologies: Supply-Chain Applications and Implementation Issues. Information Systems Management 22, 51-65. (Pubitemid 39618345)
    • (2005) Information Systems Management , vol.22 , Issue.1 , pp. 51-65
    • Angeles, R.1
  • 4
    • 29144449983 scopus 로고    scopus 로고
    • Intelligent wireless web services for construction-A review of the enabling technologies
    • DOI 10.1016/j.autcon.2005.03.002, PII S0926580505000555
    • Aziz, Z., Anumba, C.J., Ruikar, D., Carrillo, P., Bouchlaghem, D., 2006. Intelligent wireless web services for construction - A review of the enabling technologies. Automation in Construction 15, 113-123. (Pubitemid 41817141)
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 113-123
    • Aziz, Z.1    Anumba, C.J.2    Ruikar, D.3    Carrillo, P.4    Bouchlaghem, D.5
  • 6
    • 2042431225 scopus 로고    scopus 로고
    • Knowledge management strategy for construction: Key IT and contextual issues
    • Carrillo, P.M., Anumba, C.J., Kamara, J.M., 2000. Knowledge management strategy for construction: key IT and contextual issues. Proceedings of CIT 155-65.
    • (2000) Proceedings of CIT , pp. 155-165
    • Carrillo, P.M.1    Anumba, C.J.2    Kamara, J.M.3
  • 7
    • 33749255209 scopus 로고    scopus 로고
    • Environmental effects on RFID tag antennas
    • IEEE MTT-S International
    • Dobkin, D.M., Weigand, S.M., 2005. Environmental effects on RFID tag antennas. Microwave Symposium Digest. IEEE MTT-S International 12-17.
    • (2005) Microwave Symposium Digest. , pp. 12-17
    • Dobkin, D.M.1    Weigand, S.M.2
  • 8
    • 67449155894 scopus 로고    scopus 로고
    • Construction defect management using a telematic digital workbench
    • Dong, A., Maher, M.L., Kim, M.J., Gu, N., Wang, X., 2009. Construction defect management using a telematic digital workbench. Automation in Construction 18, 814-824.
    • (2009) Automation in Construction , vol.18 , pp. 814-824
    • Dong, A.1    Maher, M.L.2    Kim, M.J.3    Gu, N.4    Wang, X.5
  • 10
    • 34948881720 scopus 로고    scopus 로고
    • Life-cycle data management of engineered-to-order components using radio frequency identification
    • DOI 10.1016/j.aei.2006.09.004, PII S1474034606000504
    • Ergen, E., Akinci, B., Sacks, R., 2007. Life-cycle data management of engineered-to-order components using radio frequency identification. Advanced Engineering Informatics 21, 356-366. (Pubitemid 47532786)
    • (2007) Advanced Engineering Informatics , vol.21 , Issue.4 , pp. 356-366
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 14
    • 0242652022 scopus 로고    scopus 로고
    • Design science in information systems research
    • Hevner, A.R., March, S.T., Park, J., Ram, S., 2004. Design science in information systems research. MIS quarterly 28, 75-105.
    • (2004) MIS Quarterly , vol.28 , pp. 75-105
    • Hevner, A.R.1    March, S.T.2    Park, J.3    Ram, S.4
  • 16
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • (May)
    • Irizarry, Javier, Ebrahim P. Karan, and Farzad Jalaei. 2013. "Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management." Automation in Construction 31 (0) (May): 241-254.
    • (2013) Automation in Construction , vol.31 , Issue.0 , pp. 241-254
    • Javier, I.1    Karan, E.P.2    Jalaei, F.3
  • 17
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radio frequency identification in the construction process
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(680)
    • Jaselskis, E., El-Misalami, T., 2003. Implementing radio frequency identification in the construction process. Journal of Construction Engineering and Management 129, 680-688. (Pubitemid 40265428)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 18
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction A study of seven building projects
    • Josephson, P., 1999. The causes and costs of defects in construction A study of seven building projects. Automation in Construction 8, 681-687.
    • (1999) Automation in Construction , vol.8 , pp. 681-687
    • Josephson, P.1
  • 20
    • 79960175707 scopus 로고    scopus 로고
    • Development of construction logistics system using radio frequency identification
    • Kaneko, T., Hamada, K., Kondo, T., 2007. Development of construction logistics system using radio frequency identification. Proceedings of ISARC 55-62.
    • (2007) Proceedings of ISARC , pp. 55-62
    • Kaneko, T.1    Hamada, K.2    Kondo, T.3
  • 21
    • 35348869297 scopus 로고    scopus 로고
    • Pervasive 2D barcodes for camera phone applications
    • DOI 10.1109/MPRV.2007.80
    • Kato, H., Tan, K.T., 2007. Pervasive 2D Barcodes for Camera Phone Applications. Pervasive Computing, IEEE 6, 76 -85. (Pubitemid 47594398)
    • (2007) IEEE Pervasive Computing , vol.6 , Issue.4 , pp. 76-85
    • Kato, H.1    Tan, K.T.2
  • 22
    • 14544274600 scopus 로고    scopus 로고
    • The application of PDA as mobile computing system on construction management
    • DOI 10.1016/j.autcon.2004.09.003, PII S0926580504001268, 20th International Symposium on Automation and Robotics in Construction: The Future Site
    • Kimoto, K., Endo, K., Iwashita, S., Fujiwara, M., 2005. The application of PDA as mobile computing system on construction management. Automation in Construction 14, 500-511. (Pubitemid 40305012)
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 500-511
    • Kimoto, K.1    Endo, K.2    Iwashita, S.3    Fujiwara, M.4
  • 23
    • 59049091711 scopus 로고    scopus 로고
    • RFID-based building maintenance system
    • Ko, C.H., 2009. RFID-based building maintenance system. Automation in Construction 18, 275-284.
    • (2009) Automation in Construction , vol.18 , pp. 275-284
    • Ko, C.H.1
  • 25
    • 41749109303 scopus 로고    scopus 로고
    • Using a real-time integrated communication system to monitor the progress and quality of construction works
    • Leung, S., Mak, S., Lee, B.L.P., 2008. Using a real-time integrated communication system to monitor the progress and quality of construction works. Automation in Construction 17, 749 - 757.
    • (2008) Automation in Construction , vol.17 , pp. 749-757
    • Leung, S.1    Mak, S.2    Lee, B.L.P.3
  • 26
    • 34948868259 scopus 로고    scopus 로고
    • Dynamic mobile RFID-based supply chain control and management system in construction
    • DOI 10.1016/j.aei.2006.09.003, PII S1474034606000528
    • Lin, Y.-C., Wang, L.-C., Lin, P., 2007. Dynamic mobile RFID-based supply chain control and management system in construction. Advanced Engineering Informatics 21, 377-390. (Pubitemid 47532788)
    • (2007) Advanced Engineering Informatics , vol.21 , Issue.4 , pp. 377-390
    • Wang, L.-C.1    Lin, Y.-C.2    Lin, P.H.3
  • 27
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • Love, P.E.D., 2002. Auditing the indirect consequences of rework in construction: a case based approach. Managerial Auditing Journal 17, 138-146.
    • (2002) Managerial Auditing Journal , vol.17 , pp. 138-146
    • Love, P.E.D.1
  • 28
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P.E.D., Li, H., 2000. Quantifying the causes and costs of rework in construction. Construction Management and Economics 18, 479-490.
    • (2000) Construction Management and Economics , vol.18 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 30
    • 39749100579 scopus 로고    scopus 로고
    • RFID research: An academic literature review (1995-2005) and future research directions
    • DOI 10.1016/j.ijpe.2007.05.004, PII S0925527307001934
    • Ngai, E.W.T., Moon, K.K.L., Riggins, F.J., Yi, C.Y., 2008. RFID research: An academic literature review (1995-2005) and future research directions. International Journal of Production Economics 112, 510-520. (Pubitemid 351291705)
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 510-520
    • Ngai, E.W.T.1    Moon, K.K.L.2    Riggins, F.J.3    Yi, C.Y.4
  • 33
    • 29444454640 scopus 로고    scopus 로고
    • Antenna design for UHF RFID tags: A review and a practical application
    • DOI 10.1109/TAP.2005.859919
    • Rao, K.V.S., Nikitin, P.V., Lam, S.F., 2005. Antenna design for UHF RFID tags: A review and a practical application. Antennas and Propagation, IEEE Transactions on 53, 3870-3876. (Pubitemid 43009920)
    • (2005) IEEE Transactions on Antennas and Propagation , vol.53 , Issue.12 , pp. 3870-3876
    • Rao, K.V.S.1    Nikitin, P.V.2    Lam, S.F.3
  • 34
    • 32444435813 scopus 로고    scopus 로고
    • Radio frequency identification (RFID)
    • DOI 10.1016/j.cose.2005.12.003, PII S016740480500204X
    • Roberts, C.M., 2006. Radio frequency identification (RFID). Computers & Security 25, 18-26. (Pubitemid 43227228)
    • (2006) Computers and Security , vol.25 , Issue.1 , pp. 18-26
    • Roberts, C.M.1
  • 35
    • 77957819564 scopus 로고    scopus 로고
    • A literature review on the impact of RFID technologies on supply chain management
    • November
    • Sarac, Aysegul, Nabil Absi, and Stéphane Dauzère- Pérès. "A Literature Review on the Impact of RFID Technologies on Supply Chain Management." International Journal of Production Economics 128, no. 1 (November 2010): 77-95.
    • (2010) International Journal of Production Economics , vol.128 , Issue.1 , pp. 77-95
    • Aysegul, S.1    Absi, N.2    Dauzère-Pérès, S.3
  • 36
    • 84863705534 scopus 로고    scopus 로고
    • Influence of RFID technology on automated management of construction materials and components
    • June
    • Sardroud, M., Javad. "Influence of RFID Technology on Automated Management of Construction Materials and Components." Scientia Iranica 19, no. 3 (June 2012): 381-392.
    • (2012) Scientia Iranica , vol.19 , Issue.3 , pp. 381-392
    • Javad, S.M.1
  • 38
    • 70349416434 scopus 로고    scopus 로고
    • Utilization of ubiquitous computing for construction AR technology
    • Shin, D.H., 2009. Utilization of ubiquitous computing for construction AR technology. Automation in Construction 18, 1063-1069.
    • (2009) Automation in Construction , vol.18 , pp. 1063-1069
    • Shin, D.H.1
  • 40
    • 74349091937 scopus 로고    scopus 로고
    • Futuristic construction communication infrastructures: Secure and safe with no wires
    • Strachan, R., 2009. Futuristic construction communication infrastructures: Secure and safe with no wires. Electronic Journal of Information Technology in Construction 14, 526-539.
    • (2009) Electronic Journal of Information Technology in Construction , vol.14 , pp. 526-539
    • Strachan, R.1
  • 41
    • 58149259941 scopus 로고    scopus 로고
    • Methodology for automating the identification and localization of construction components on industrial projects
    • Torrent, D., Caldas, C., 2009. Methodology for automating the identification and localization of construction components on industrial projects. Journal of Computing in Civil Engineering 23. pp. 3-13.
    • (2009) Journal of Computing in Civil Engineering , vol.23 , pp. 3-13
    • Torrent, D.1    Caldas, C.2
  • 42
    • 33748192059 scopus 로고    scopus 로고
    • Construction automation based on parts and packets unification
    • DOI 10.1016/j.autcon.2005.10.013, PII S0926580505001585, Knowledge Enabled Information System Applications in Construction
    • Umetani, T., Arai, T., Mae, Y., Inoue, K., Maeda, J., 2006. Construction automation based on parts and packets unification. Automation in Construction 15, 777-784. (Pubitemid 44311011)
    • (2006) Automation in Construction , vol.15 , Issue.6 , pp. 777-784
    • Umetani, T.1    Arai, T.2    Mae, Y.3    Inoue, K.4    Maeda, J.-i.5
  • 47
    • 38649110133 scopus 로고    scopus 로고
    • Enhancing construction quality inspection and management using RFID technology
    • Wang, L.-C., 2008. Enhancing construction quality inspection and management using RFID technology. Automation in Construction 17, 467-479.
    • (2008) Automation in Construction , vol.17 , pp. 467-479
    • Wang, L.-C.1
  • 48
    • 34948868259 scopus 로고    scopus 로고
    • Dynamic mobile RFID-based supply chain control and management system in construction
    • DOI 10.1016/j.aei.2006.09.003, PII S1474034606000528
    • Wang, L.-C., Lin, Y.-C., Lin, P.H., 2007. Dynamic mobile RFID-based supply chain control and management system in construction. Advanced Engineering Informatics 21, 377-390. (Pubitemid 47532788)
    • (2007) Advanced Engineering Informatics , vol.21 , Issue.4 , pp. 377-390
    • Wang, L.-C.1    Lin, Y.-C.2    Lin, P.H.3
  • 49
    • 67349159070 scopus 로고    scopus 로고
    • Developing a precast production management system using RFID technology
    • Yin, S.Y.L., Tserng, H.P., Wang, J.C., Tsai, S.C., 2009. Developing a precast production management system using RFID technology. Automation in Construction 18, 677-691.
    • (2009) Automation in Construction , vol.18 , pp. 677-691
    • Yin, S.Y.L.1    Tserng, H.P.2    Wang, J.C.3    Tsai, S.C.4
  • 50
    • 84862026653 scopus 로고    scopus 로고
    • Building information modelling (BIM) implementation and remote construction projects: Issues
    • Yusuf Arayici, C.E., 2012. Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and Critiques. ITcon Vol. 17, pg. 75-92, http://www.itcon.org/2012/5.
    • (2012) Challenges and Critiques. ITcon , vol.17 , pp. 75-92
    • Yusuf Arayici, C.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.