메뉴 건너뛰기




Volumn 64, Issue 4, 2013, Pages 895-901

A heuristic approach for U-shaped assembly line balancing to improve labor productivity

Author keywords

Assembly line balancing; Critical path method; Heuristics; Labor productivity; U shaped line

Indexed keywords

ASSEMBLY LINE BALANCING; CRITICAL PATH METHOD; HEURISTICS; LABOR PRODUCTIVITY; U-SHAPED;

EID: 84876143626     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2013.01.001     Document Type: Article
Times cited : (54)

References (52)
  • 1
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layout and their impact on labor productivity: An experimental study
    • G.R. Aase, J.R. Olson, and M.J. Schniederjans U-shaped assembly line layout and their impact on labor productivity: An experimental study European Journal of Operational Research 156 2004 698 711
    • (2004) European Journal of Operational Research , vol.156 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Schniederjans, M.J.3
  • 3
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • DOI 10.1080/00207540600943985, PII 770289077
    • S. Agrawal, and M.K. Tiwari A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem International Journal of Production Research 46 6 2008 1405 1429 (Pubitemid 350161678)
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 5
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • R.G. Askin, and M. Zhou A parallel station heuristic for the mixed-model production line balancing problem International Journal of Production Research 35 1997 3095 3105 (Pubitemid 127549656)
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 7
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • 10.1016/j.ijpe.2012.10.020
    • O. Battaïa, and A. Dolgui A taxonomy of line balancing problems and their solution approaches International Journal of Production Economics 2012 10.1016/j.ijpe.2012.10.020
    • (2012) International Journal of Production Economics
    • Battaïa, O.1    Dolgui, A.2
  • 8
    • 33751255097 scopus 로고    scopus 로고
    • Ant algorithm for a time and space constrained assembly line balancing problem
    • J. Bautista, and J. Pereira Ant algorithm for a time and space constrained assembly line balancing problem European Journal of Operation Research 177 2006 2016 2032
    • (2006) European Journal of Operation Research , vol.177 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 9
    • 55149094562 scopus 로고    scopus 로고
    • A dynamic programming based heuristic for the assembly line balancing problem
    • J. Bautista, and J. Pereira A dynamic programming based heuristic for the assembly line balancing problem European Journal of Operation Research 194 2009 787 794
    • (2009) European Journal of Operation Research , vol.194 , pp. 787-794
    • Bautista, J.1    Pereira, J.2
  • 10
    • 0022503543 scopus 로고
    • Efficient heuristic method for the simple assembly line balance problem
    • I. Baybars An efficient heuristic method for the simple assembly line balancing problem International Journal of Production Research 24 1986 149 166 (Pubitemid 16487259)
    • (1986) International Journal of Production Research , vol.24 , Issue.1 , pp. 149-166
    • Baybars Ilker1
  • 11
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
    • C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 2006 694 715 (Pubitemid 41336587)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 13
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem: A heuristic procedure
    • DOI 10.1016/j.ejor.2004.10.031, PII S0377221705004753
    • W.C. Chiang, and T.L. Urban The stochastic U-shaped balancing problem: A heuristic procedure European Journal of Operational Research 175 2006 1767 1781 (Pubitemid 44436754)
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.-C.1    Urban, T.L.2
  • 14
    • 25144474660 scopus 로고    scopus 로고
    • A special case of transfer lines balancing by graph approach
    • DOI 10.1016/j.ejor.2004.07.025, PII S0377221704004825, Balancing Assembly and Transfer Lines
    • A. Dolgui, N. Guschinsky, and G. Levin A special case of transfer lines balancing by graph approach European Journal of Operational Research 168 2006 732 746 (Pubitemid 41336589)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 732-746
    • Dolgui, A.1    Guschinsky, N.2    Levin, G.3
  • 15
    • 0035840757 scopus 로고    scopus 로고
    • Balancing of U-type assembly systems using simulated annealing
    • DOI 10.1080/00207540110051905
    • E. Erel, I. Sabuncuogl, and B.A. Aksu Balancing of U-type assembly line system using simulated annealing International Journal of Production Research 39 13 2001 3003 3015 (Pubitemid 35165557)
    • (2001) International Journal of Production Research , vol.39 , Issue.13 , pp. 3003-3015
    • Erel, E.1    Sabuncuoglu, I.2    Aksu, B.A.3
  • 16
    • 0037448813 scopus 로고    scopus 로고
    • An enumerative heuristic and reduction methods for the assembly line balancing problem
    • DOI 10.1016/S0377-2217(02)00204-7, PII S0377221702002047
    • K. Fleszer, and K.S. Hindi An enumerative heuristic and reduction method for the assembly line balancing problem European Journal of Operation Research 145 2003 606 620 (Pubitemid 35411809)
    • (2003) European Journal of Operational Research , vol.145 , Issue.3 , pp. 606-620
    • Fleszar, K.1    Hindi, K.S.2
  • 17
    • 13444306204 scopus 로고    scopus 로고
    • A shortest route formulation of simple U-type assembly line balancing problem
    • DOI 10.1016/j.apm.2004.10.003, PII S0307904X04001441
    • H. Gokcen, K. Agpak, C. Gencer, and E. Kizilkaya A shortest route formulation of simple U-type assembly line balancing problem Applied Mathematical Modeling 29 2005 373 380 (Pubitemid 40205319)
    • (2005) Applied Mathematical Modelling , vol.29 , Issue.4 , pp. 373-380
    • Gokcen, H.1    Agpak, K.2    Gencer, C.3    Kizilkaya, E.4
  • 18
    • 67651160370 scopus 로고    scopus 로고
    • Comparison of exact and heuristic methods for a transfer line balancing problem
    • O. Guschinskaya, and A. Dolgui Comparison of exact and heuristic methods for a transfer line balancing problem International Journal of Production Economics 120 2009 276 286
    • (2009) International Journal of Production Economics , vol.120 , pp. 276-286
    • Guschinskaya, O.1    Dolgui, A.2
  • 19
  • 20
    • 82755160654 scopus 로고    scopus 로고
    • A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints
    • A. Hamzadayi, and G. Yildiz A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints Computers & Industrial Engineering 62 2012 206 215
    • (2012) Computers & Industrial Engineering , vol.62 , pp. 206-215
    • Hamzadayi, A.1    Yildiz, G.2
  • 21
    • 25144466582 scopus 로고
    • Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren
    • K. Hautsch, H. John, and H. Schürgers Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren REFA-Nachrichten 25 1972 451 464
    • (1972) REFA-Nachrichten , vol.25 , pp. 451-464
    • Hautsch, K.1    John, H.2    Schürgers, H.3
  • 23
    • 0042558831 scopus 로고
    • Branching and bounding: Eine allgemeine methode zur lösung kambinato-rischer problem
    • G. Jaeschke Branching and bounding: eine allgemeine methode zur lösung kambinato-rischer problem Abauf- und Planungsforschung 5 1964 133 155
    • (1964) Abauf- Und Planungsforschung , vol.5 , pp. 133-155
    • Jaeschke, G.1
  • 25
    • 0036467014 scopus 로고    scopus 로고
    • A knowledge based design methodology for manufacturing assembly lines
    • DOI 10.1016/S0360-8352(01)00067-5, PII S0360835201000675
    • A. Khan, and A.J. Day A knowledge based design methodology for manufacturing assembly lines Computer and Industrial Engineering 41 2002 441 467 (Pubitemid 34040917)
    • (2002) Computers and Industrial Engineering , vol.41 , Issue.4 , pp. 441-467
    • Khan, A.1    Day, A.J.2
  • 26
    • 33750001537 scopus 로고    scopus 로고
    • A Petri net approach for simple assembly line balancing problems
    • DOI 10.1007/s00170-005-0154-2
    • O. Kilincci, and G.M. Bayhan A petri net approach for simple assembly line balancing problems International Journal of Advance Manufacturing Technology 30 2006 1165 1173 (Pubitemid 44570100)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.11-12 , pp. 1165-1173
    • Kilincci, O.1    Bayhan, G.M.2
  • 27
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • DOI 10.1016/j.ejor.2004.07.032, PII S0377221704004898, Balancing Assembly and Transfer Lines
    • Y.K. Kim, Y.J. Kim, and Y. Kim An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines European Journal of Operation Research 168 2006 838 852 (Pubitemid 41336596)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 28
    • 0242333183 scopus 로고    scopus 로고
    • Expert enhanced coloured stochastic petri net and its application in assembly/disassembly
    • S. Kumar, R. Kumar, R. Shankar, and M.K. Tiwari Expert enhanced coloured stochastic petri net and its application in assembly/disassembly International Journal of Production Research 41 12 2003 2727 2762
    • (2003) International Journal of Production Research , vol.41 , Issue.12 , pp. 2727-2762
    • Kumar, S.1    Kumar, R.2    Shankar, R.3    Tiwari, M.K.4
  • 30
    • 11144304066 scopus 로고    scopus 로고
    • A bidirectional heuristic for stochastic assembly line balancing type II problem
    • DOI 10.1007/s00170-003-1833-5
    • S.B. Liu, H.L. Ong, and H.C. Huang A bidirectional heuristic for stochastic assembly line balancing type II problem International Journal of Advance Manufacturing Technology 25 2005 71 77 (Pubitemid 40034730)
    • (2005) International Journal of Advanced Manufacturing Technology , vol.25 , Issue.1-2 , pp. 71-77
    • Liu, S.B.1    Ong, H.L.2    Huang, H.C.3
  • 32
    • 0002134614 scopus 로고    scopus 로고
    • Balancing U-lines in a multiple U-line facility
    • PII S0377221797001690
    • J. Miltenburg Balancing U-lines in a multiple U-line facility European Journal of Operational Research 109 1 1998 1 23 (Pubitemid 128393226)
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 33
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • DOI 10.1016/S0925-5273(00)00064-5, PII S0925527300000645
    • J. Miltenburg U-shaped production lines: A review of theory and practice International Journal of Production Economics 70 3 2001 201 214 (Pubitemid 32272149)
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 34
    • 0036538669 scopus 로고    scopus 로고
    • Balancing and scheduling mixed-model U-shaped production lines
    • J. Miltenburg Balancing and scheduling mixed-model U-shaped production lines International Journal of Flexible Manufacturing System 14 2002 123 155 (Pubitemid 34434092)
    • (2002) International Journal of Flexible Manufacturing Systems , vol.14 , Issue.2 , pp. 123-155
    • Miltenburg, J.1
  • 35
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • G.J. Miltenburg, and J. Wijngaad The U-line line balancing problem Management Science 40 10 1994 1378 1388
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, G.J.1    Wijngaad, J.2
  • 36
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press Norcross, GA
    • Y. Modern Toyota production system 1983 Industrial Engineering and Management Press Norcross, GA
    • (1983) Toyota Production System
    • Modern, Y.1
  • 37
    • 0003449926 scopus 로고
    • 2nd ed. Industrial Engineering Press, Institute of Industrial Engineers Norcross GA
    • Y. Monden Toyota production system 2nd ed. 1993 Industrial Engineering Press, Institute of Industrial Engineers Norcross GA
    • (1993) Toyota Production System
    • Monden, Y.1
  • 38
    • 38849099717 scopus 로고    scopus 로고
    • Optimal allocation of heterogeneous workers in a U-shaped production line
    • DOI 10.1016/j.cie.2007.08.007, PII S0360835207001969
    • K. Nakade, and R. Nishiwaki Optimal allocation of heterogeneous workers in a U-shaped production line Computers & Industrial Engineering 54 2008 432 440 (Pubitemid 351199796)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 432-440
    • Nakade, K.1    Nishiwaki, R.2
  • 39
    • 0037061531 scopus 로고    scopus 로고
    • A management design approach to a simple flexible assembly system
    • DOI 10.1016/S0925-5273(01)00193-1, PII S0925527301001931
    • N. Nakase, T. Yamada, and M. Matsui A management design approach to a simple flexible assembly system International Journal of Production Economic 76 2002 281 292 (Pubitemid 34249510)
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 281-292
    • Nakase, N.1    Yamada, T.2    Matsui, M.3
  • 41
    • 0006102920 scopus 로고
    • A comparison of heuristic algorithms for cost-oriented assembly line balancing
    • O. Rosenberg, and H. Ziegler A comparison of heuristic algorithms for cost-oriented assembly line balancing Mathematical Methods of Operations Research 36 1992 477 495
    • (1992) Mathematical Methods of Operations Research , vol.36 , pp. 477-495
    • Rosenberg, O.1    Ziegler, H.2
  • 43
    • 84876149616 scopus 로고
    • Productivity Press Portland
    • K. Sekine One-pipe flow 1992 Productivity Press Portland
    • (1992) One-pipe Flow
    • Sekine, K.1
  • 44
    • 10444289741 scopus 로고    scopus 로고
    • A genetic algorithm based approach to the mixed model assembly line balancing problem of type-2
    • A.S. Simaria, and P.M. Vilarinho A genetic algorithm based approach to the mixed model assembly line balancing problem of type-2 Computer and Industrial Engineering 47 2004 391 407
    • (2004) Computer and Industrial Engineering , vol.47 , pp. 391-407
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 49
    • 0032070937 scopus 로고    scopus 로고
    • Optimal balancing of U-shaped assembly line
    • T.L. Urban Optimal balancing of U-shaped assembly line Management Science 44 5 1998 430 454
    • (1998) Management Science , vol.44 , Issue.5 , pp. 430-454
    • Urban, T.L.1
  • 52
    • 71849104220 scopus 로고    scopus 로고
    • A new bidirectional heuristic for the assembly line balancing problem
    • D.H. Yeh, and N.H.H. Kao A new bidirectional heuristic for the assembly line balancing problem Computer & Industrial Engineering 57 2009 1155 1160
    • (2009) Computer & Industrial Engineering , vol.57 , pp. 1155-1160
    • Yeh, D.H.1    Kao, N.H.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.