메뉴 건너뛰기




Volumn 28, Issue 1, 2009, Pages 28-40

The application of single-pass heuristics for U-lines

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL STUDIES;

EID: 70249132133     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2009.05.001     Document Type: Article
Times cited : (15)

References (37)
  • 1
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood (IL)
    • Hall R.W. Zero inventories (1983), Dow Jones-Irwin, Homewood (IL)
    • (1983) Zero inventories
    • Hall, R.W.1
  • 2
    • 0003449926 scopus 로고
    • Industrial Engineering Press, Institute of Industrial Engineers, Norcross (GA)
    • Monden Y. Toyota production system. 2nd ed. (1993), Industrial Engineering Press, Institute of Industrial Engineers, Norcross (GA)
    • (1993) Toyota production system. 2nd ed.
    • Monden, Y.1
  • 6
    • 0024765174 scopus 로고
    • Fast, effective algorithms for simple assembly line balancing problems
    • Hackman S.T., Magazine M.J., and Wee T.S. Fast, effective algorithms for simple assembly line balancing problems. Operations Research 37 6 (1989) 916-924
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 916-924
    • Hackman, S.T.1    Magazine, M.J.2    Wee, T.S.3
  • 7
    • 0000313704 scopus 로고
    • Assembly-line balancing-dynamic programming with precedence constraints
    • Held M., Karp R.M., and Shareshian R. Assembly-line balancing-dynamic programming with precedence constraints. Operations Research 11 (1963) 442-459
    • (1963) Operations Research , vol.11 , pp. 442-459
    • Held, M.1    Karp, R.M.2    Shareshian, R.3
  • 8
    • 0026487247 scopus 로고
    • Eureka: A hybrid system for assembly line balancing
    • Hoffmann T.R. Eureka: A hybrid system for assembly line balancing. Management Science 8 1 (1992) 39-47
    • (1992) Management Science , vol.8 , Issue.1 , pp. 39-47
    • Hoffmann, T.R.1
  • 9
    • 0023963644 scopus 로고
    • Optimally balancing large assembly lines with 'Fable'
    • Johnson R.V. Optimally balancing large assembly lines with 'Fable'. Management Science 34 1 (1988) 240-253
    • (1988) Management Science , vol.34 , Issue.1 , pp. 240-253
    • Johnson, R.V.1
  • 10
    • 0020103084 scopus 로고
    • On dynamic programming for assembly line balancing
    • Kao E.P., and Queyranne M. On dynamic programming for assembly line balancing. Operations Research 30 2 (1982) 375-390
    • (1982) Operations Research , vol.30 , Issue.2 , pp. 375-390
    • Kao, E.P.1    Queyranne, M.2
  • 11
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 (1986) 909-932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 12
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • Talbot F.B., Patterson J.H., and Gehrlein W.V. A comparative evaluation of heuristic line balancing techniques. Management Science 32 4 (1986) 430-454
    • (1986) Management Science , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 13
    • 0024641634 scopus 로고
    • A comparative literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S., and Gagnon R.J. A comparative literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27 4 (1989) 637-670
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 14
  • 17
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems
    • Baykasoǧlu A. Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. Journal of Intelligent Manufacturing 17 (2006) 217-232
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 217-232
    • Baykasoǧlu, A.1
  • 19
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem: A heuristic procedure
    • Chiang W.C., and Urban T.L. The stochastic U-line balancing problem: A heuristic procedure. European Journal of Operational Research 175 3 (2006) 1767-1781
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.C.1    Urban, T.L.2
  • 22
    • 28244475042 scopus 로고    scopus 로고
    • A goal programming approach to simple U-line balancing problem
    • Gökçen H., and Aǧpak K. A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171 2 (2006) 577-585
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 577-585
    • Gökçen, H.1    Aǧpak, K.2
  • 23
  • 24
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
    • Kim Y.K., Kim S.J., and Kim J.Y. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Production Planning & Control 11 8 (2000) 754-764
    • (2000) Production Planning & Control , vol.11 , Issue.8 , pp. 754-764
    • Kim, Y.K.1    Kim, S.J.2    Kim, J.Y.3
  • 25
    • 25144469836 scopus 로고    scopus 로고
    • An endossymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • Kim Y.K., Kim J.Y., and Kim Y.H. An endossymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research 168 3 (2006) 838-852
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.H.3
  • 30
    • 0032070937 scopus 로고    scopus 로고
    • Optimal balancing of U-shaped assembly lines
    • Urban T.L. Optimal balancing of U-shaped assembly lines. Management Science 44 5 (1998) 738-741
    • (1998) Management Science , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.L.1
  • 31
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban T.L., and Chiang W.C. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research 168 3 (2006) 771-782
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 771-782
    • Urban, T.L.1    Chiang, W.C.2
  • 32
    • 0021202885 scopus 로고
    • An integer programming algorithm with network cuts for solving the assembly line balancing problem
    • Talbot F.B., and Patterson J.H. An integer programming algorithm with network cuts for solving the assembly line balancing problem. Management Science 30 1 (1984) 85-99
    • (1984) Management Science , vol.30 , Issue.1 , pp. 85-99
    • Talbot, F.B.1    Patterson, J.H.2
  • 34
    • 0001108060 scopus 로고
    • Assembly line balancing using the ranked positional weight technique
    • Helgeson W.B., and Birnie D.P. Assembly line balancing using the ranked positional weight technique. Journal of Industrial Engineering 12 6 (1961) 394-398
    • (1961) Journal of Industrial Engineering , vol.12 , Issue.6 , pp. 394-398
    • Helgeson, W.B.1    Birnie, D.P.2
  • 35
    • 0000416102 scopus 로고
    • Assembly line balancing by linear programming
    • Bowman E.H. Assembly line balancing by linear programming. Operations Research 8 3 (1960) 385-389
    • (1960) Operations Research , vol.8 , Issue.3 , pp. 385-389
    • Bowman, E.H.1
  • 37
    • 0042558831 scopus 로고
    • Eine allgemeinen methode zur losung kombinatorisher probleme
    • Jaeschke G. Eine allgemeinen methode zur losung kombinatorisher probleme. Ablanf-und Planung-forschung 5 (1964) 133-153
    • (1964) Ablanf-und Planung-forschung , vol.5 , pp. 133-153
    • Jaeschke, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.