메뉴 건너뛰기




Volumn 346, Issue , 2009, Pages 53-63

Monitoring of construction performance using daily progress photograph logs and 4d as-planned models

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION ACTIVITIES; CONSTRUCTION PERFORMANCE; CONSTRUCTION PROJECTS; CONSTRUCTION SITES; DATA COLLECTION; EARLY DETECTION; GEOMETRIC REPRESENTATION; IMAGE PROCESSING TECHNIQUE; IN-FIELD; LOCATION BASED; NEW TECHNOLOGIES; PROJECT MANAGERS; SCHEDULE DELAY; TRAFFIC LIGHT;

EID: 70350161838     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41052(346)6     Document Type: Conference Paper
Times cited : (29)

References (25)
  • 2
    • 49349100565 scopus 로고    scopus 로고
    • El-Omari S. and Moselhi O. (2008). Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. J. of Automation in Const 18 (1), 1-9.
    • El-Omari S. and Moselhi O. (2008). "Integrating 3D laser scanning and photogrammetry for progress measurement of construction work". J. of Automation in Const 18 (1), 1-9.
  • 3
    • 70350060197 scopus 로고    scopus 로고
    • Golparvar-Fard M., Peña-Mora F., Arboleda C. and Lee S. (2009). Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs., ASCE J. of Computing in Civil Eng., Special Ed. on Graphical 3D Visualization in AEC, in press.
    • Golparvar-Fard M., Peña-Mora F., Arboleda C. and Lee S. (2009). "Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs.", ASCE J. of Computing in Civil Eng., Special Ed. on Graphical 3D Visualization in AEC, in press.
  • 7
    • 42949120546 scopus 로고    scopus 로고
    • Kiziltas S., Akinci B., Ergen E. and Tang, P.O. (2008). Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management, ITcon, 13, Sp. Issue Sensors in Const. and Infrastructure Mgmt, 134-154.
    • Kiziltas S., Akinci B., Ergen E. and Tang, P.O. (2008). "Technological assessment and process implications of field data capture technologies for construction and facility/infrastructure management", ITcon, 13, Sp. Issue Sensors in Const. and Infrastructure Mgmt, 134-154.
  • 8
    • 27644443966 scopus 로고    scopus 로고
    • Kiziltas S. and Akinci B. (2005). The need for prompt schedule update by utilizing reality capture technologies: A case study, Proc., Construction Research Congress, San Diego, CA.
    • Kiziltas S. and Akinci B. (2005). "The need for prompt schedule update by utilizing reality capture technologies: A case study", Proc., Construction Research Congress, San Diego, CA.
  • 9
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D in commercial construction
    • Koo B. and Fischer M. (2000). Feasibility study of 4D in commercial construction. J. of Construction Eng. and Mgmt. 126 (4), 251-260.
    • (2000) J. of Construction Eng. and Mgmt , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 10
    • 19744372812 scopus 로고    scopus 로고
    • The design and implementation of a generic sparse bundle adjustment software package based on the Levenberg - Marquardt algorithm
    • 340, Inst. of Computer Science-FORTH, Heraklion, Crete, Greece
    • Lourakis M. and Argyros A. (2004). "The design and implementation of a generic sparse bundle adjustment software package based on the Levenberg - Marquardt algorithm" (Technical Report 340). Inst. of Computer Science-FORTH, Heraklion, Crete, Greece.
    • (2004) Technical Report
    • Lourakis, M.1    Argyros, A.2
  • 11
    • 3042535216 scopus 로고    scopus 로고
    • Distinctive image features from scale-invariant keypoints
    • Lowe D. (2004). "Distinctive image features from scale-invariant keypoints". Int Journal of Computer Vision, 60 (2), 91-110.
    • (2004) Int Journal of Computer Vision , vol.60 , Issue.2 , pp. 91-110
    • Lowe, D.1
  • 14
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research in automated project performance control (APPC)
    • Navon R. and Sacks R. (2007). "Assessing research in automated project performance control (APPC)." J. of Automation in Construction, 16 (4), 474-484.
    • (2007) J. of Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 17
    • 33747360709 scopus 로고    scopus 로고
    • Poku S. and Arditi D. (2006). Construction scheduling and progress control using geographical information systems. J. of Computing in Civil Eng., 20 (5), 351-360.
    • Poku S. and Arditi D. (2006). "Construction scheduling and progress control using geographical information systems". J. of Computing in Civil Eng., 20 (5), 351-360.
  • 18
    • 50649097874 scopus 로고    scopus 로고
    • Savarese S. and Fei-Fei L. (2007).:3D generic object categorization, localization and pose estimation. IEEE Intern. Conf. in Computer Vision (ICCV). - Brazil, October, 2007.
    • Savarese S. and Fei-Fei L. (2007).:3D generic object categorization, localization and pose estimation". IEEE Intern. Conf. in Computer Vision (ICCV). - Brazil, October, 2007.
  • 20
    • 77954006739 scopus 로고    scopus 로고
    • Photo tourism: Exploring photo collections in 3D. Proa
    • Snavely N., Seitz S., and Szeliski R. (2006). "Photo tourism: exploring photo collections in 3D." Proa, ACM Transactions on Graphics, 25 (3), 835-846.
    • (2006) ACM Transactions on Graphics , vol.25 , Issue.3 , pp. 835-846
    • Snavely, N.1    Seitz, S.2    Szeliski, R.3
  • 23
    • 39449095825 scopus 로고    scopus 로고
    • Soibelman L., Wu J., Caldas C., Brilakis I. and Lin K.Y. (2008). Management and analysis of unstructured construction data types. J. of Advanced Engineering Informatics, 22, 15-27.
    • Soibelman L., Wu J., Caldas C., Brilakis I. and Lin K.Y. (2008). "Management and analysis of unstructured construction data types." J. of Advanced Engineering Informatics, 22, 15-27.
  • 24
    • 33751274763 scopus 로고    scopus 로고
    • Su Y., Hashash Y., and Liu L.Y. (2006). Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. J. of Const Eng. Mgmt, 132(12), 1234-1241.
    • Su Y., Hashash Y., and Liu L.Y. (2006). "Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation". J. of Const Eng. Mgmt, 132(12), 1234-1241.
  • 25
    • 33644518998 scopus 로고    scopus 로고
    • Framework for real-time three-dimensional modelling of infrastructure
    • Transportation Research Board Natl Research Council, Washington
    • Teizer I, Kim C., Haas C., Liapi K., and Caldas C. (2005). "Framework for real-time three-dimensional modelling of infrastructure". Geology and Properties of Earth Materials 2005, Transportation Research Board Natl Research Council, Washington, 177-186.
    • (2005) Geology and Properties of Earth Materials 2005 , pp. 177-186
    • Teizer, I.1    Kim, C.2    Haas, C.3    Liapi, K.4    Caldas, C.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.