1
-
-
0031705846
-
Factors affecting contractors risk of cost overburden
-
Akincl, B., and Filscher, M. (1998). " Factors affecting contractors risk of cost overburden.. " J. Manage. Eng., 14 (1), 67-76.
-
(1998)
J. Manage. Eng.
, vol.14
, Issue.1
, pp. 67-76
-
-
Akincl, B.1
Filscher, M.2
-
2
-
-
0031079503
-
Risk analysis and management in construction
-
Akintoye, A. S., and Macleod, M. J. (1997). " Risk analysis and management in construction.. " Int. J. Proj. Manage., 15 (1), 31-38.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.1
, pp. 31-38
-
-
Akintoye, A.S.1
MacLeod, M.J.2
-
5
-
-
0242411261
-
Risk response techniques employed currently for major projects
-
Baker, S. (1999). " Risk response techniques employed currently for major projects.. " Constr. Manage. Econom., 17, 205-213.
-
(1999)
Constr. Manage. Econom.
, vol.17
, pp. 205-213
-
-
Baker, S.1
-
6
-
-
0033165127
-
Survey of risk management in major U.K. Companies
-
Baker, S., Ponniah, D., and Smith, S. (1999). " Survey of risk management in major U.K. Companies.. " J. Profl. Issues Eng. Educ. Pract., 125 (3), 94-102.
-
(1999)
J. Profl. Issues Eng. Educ. Pract.
, vol.125
, Issue.3
, pp. 94-102
-
-
Baker, S.1
Ponniah, D.2
Smith, S.3
-
7
-
-
0031999506
-
The evaluation of risk management in public sector capital projects
-
Baldry, D. (1998). " The evaluation of risk management in public sector capital projects.. " Int. J. Proj. Manage., 16 (1), 35-41.
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.1
, pp. 35-41
-
-
Baldry, D.1
-
8
-
-
0033117140
-
Decentralised site management-A case study
-
Barber, P., Tomkins, C., and Graves, A. (1999). " Decentralised site management-A case study.. " Int. J. Proj. Manage., 17 (2), 113-120.
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.2
, pp. 113-120
-
-
Barber, P.1
Tomkins, C.2
Graves, A.3
-
9
-
-
0346044625
-
Innovation and learning in complex offshore construction projects
-
Barlow, J. (2000). " Innovation and learning in complex offshore construction projects.. " Res. Policy, 29, 973-989.
-
(2000)
Res. Policy
, vol.29
, pp. 973-989
-
-
Barlow, J.1
-
11
-
-
0033886897
-
Cost plus incentive fee contracting-Experiences and structuring
-
Berends, T. C. (2000). " Cost plus incentive fee contracting-Experiences and structuring.. " Int. J. Proj. Manage., 18, 165-171.
-
(2000)
Int. J. Proj. Manage.
, vol.18
, pp. 165-171
-
-
Berends, T.C.1
-
12
-
-
12144255380
-
The allocation of risk in PPP/PFI construction projects in the UK
-
Bing, L., Akintoye, A., Edwards, P. J., and Hardcastle, C. (2005). " The allocation of risk in PPP/PFI construction projects in the UK.. " Int. J. Proj. Manage., 23, 25-35.
-
(2005)
Int. J. Proj. Manage.
, vol.23
, pp. 25-35
-
-
Bing, L.1
Akintoye, A.2
Edwards, P.J.3
Hardcastle, C.4
-
13
-
-
0036165171
-
Incentive mechanisms for project success
-
Bower, D., Ashby, G., Gerald, K., and Smyk, W. (2002). " Incentive mechanisms for project success.. " J. Manage. Eng., 18 (1), 37-43.
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.1
, pp. 37-43
-
-
Bower, D.1
Ashby, G.2
Gerald, K.3
Smyk, W.4
-
14
-
-
0000665914
-
Motivation, commitment and the use of incentives in partnerships and alliances
-
Bresnen, M., and Marshall, N. (2000). " Motivation, commitment and the use of incentives in partnerships and alliances.. " Constr. Manage. Econom., 18, 587-98.
-
(2000)
Constr. Manage. Econom.
, vol.18
, pp. 587-98
-
-
Bresnen, M.1
Marshall, N.2
-
16
-
-
13944259748
-
Integrated methodology for project risk management
-
Cano, P. E., and Cruz, P. E. (2002). " Integrated methodology for project risk management.. " J. Constr. Eng. Manage., 128 (6), 473-485.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.6
, pp. 473-485
-
-
Cano, P.E.1
Cruz, P.E.2
-
17
-
-
11944263989
-
-
American Bar Association.
-
Carr, F., Hurtado, K., Lancaster, C., Markert, C., and Tucker, P. (1999). Partnering in construction-A practical guide to project success, American Bar Association.
-
(1999)
Partnering in Construction-A Practical Guide to Project Success
-
-
Carr, F.1
Hurtado, K.2
Lancaster, C.3
Markert, C.4
Tucker, P.5
-
18
-
-
0031258020
-
Project risk analysis and management-PRAM the generic process
-
Chapman, C. (1997). " Project risk analysis and management-PRAM the generic process.. " Int. J. Proj. Manage., 15 (5), 273-281.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.5
, pp. 273-281
-
-
Chapman, C.1
-
19
-
-
0344267707
-
Contractual risk and liability sharing in hydropower construction
-
Charoenngam, C., and Yeh, C. (1999). " Contractual risk and liability sharing in hydropower construction.. " Int. J. Proj. Manage., 17 (1), 29-37.
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.1
, pp. 29-37
-
-
Charoenngam, C.1
Yeh, C.2
-
20
-
-
0000023947
-
The characteristics and current status of China's construction industry
-
Chen, J. J. (1998). " The characteristics and current status of China's construction industry.. " Constr. Manage. Econom., 16, 711-719.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 711-719
-
-
Chen, J.J.1
-
21
-
-
36248963416
-
-
China Three Gorges Project Corporation (CTGPC).
-
China Three Gorges Project Corporation (CTGPC). (2002). Three Gorges Project Management System, Yichang, China.
-
(2002)
Three Gorges Project Management System
-
-
-
22
-
-
16844361812
-
-
Committee of Sponsoring Organizations of the Treadway Commission (COSO).
-
Committee of Sponsoring Organizations of the Treadway Commission (COSO). (2004). Enterprise risk management-Integrated framework, New York.
-
(2004)
Enterprise Risk Management-Integrated Framework
-
-
-
23
-
-
0003983365
-
-
Construction Industry Institute (CII). (Construction Industry Development Agency, Australia.
-
Construction Industry Institute (CII). (1991). In search of partnering excellence, Construction Industry Development Agency, Australia.
-
(1991)
In Search of Partnering Excellence
-
-
-
25
-
-
0029373930
-
Conceptual model of partnering
-
Crowley, L. G., and Karim, M. A. (1995). " Conceptual model of partnering.. " J. Manage. Eng., 11 (5), 33-39.
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.5
, pp. 33-39
-
-
Crowley, L.G.1
Karim, M.A.2
-
26
-
-
0033150275
-
Process re-engineering for effective implementation of projects
-
Dey, P. K. (1999). " Process re-engineering for effective implementation of projects.. " Int. J. Proj. Manage., 17 (3), 147-159.
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.3
, pp. 147-159
-
-
Dey, P.K.1
-
28
-
-
0003732501
-
-
Department of the Environment, Transportation and Regions, London.
-
Egan, J. (1998). Rethinking construction, Department of the Environment, Transportation and Regions, London.
-
(1998)
Rethinking Construction
-
-
Egan, J.1
-
29
-
-
0036132320
-
Managing project risks: A case study from the utilities sector
-
Elkington, P., and Smallman, C. (2002). " Managing project risks: A case study from the utilities sector.. " Int. J. Proj. Manage., 20, 49-57.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 49-57
-
-
Elkington, P.1
Smallman, C.2
-
30
-
-
13944278087
-
Risks in Chinese construction market-Contractors' perspective
-
Fang, D., Li, M., Fong, P. S., and Shen, L. (2004). " Risks in Chinese construction market-Contractors' perspective.. " J. Constr. Eng. Manage., 130 (6), 853-861.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 853-861
-
-
Fang, D.1
Li, M.2
Fong, P.S.3
Shen, L.4
-
31
-
-
0035501140
-
Strategizing for anticipated risks and turbulence in large-scale engineering projects
-
Floricel, S., and Miller, R. (2001). " Strategizing for anticipated risks and turbulence in large-scale engineering projects.. " Int. J. Proj. Manage., 19, 445-455.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, pp. 445-455
-
-
Floricel, S.1
Miller, R.2
-
32
-
-
32944454709
-
Project alliancing-Creating the possibilities
-
Melbourne, Australia.
-
Gallagher, J. (2002). " Project alliancing-Creating the possibilities.. " Proc., ICEC 3rd World Congress (CD-ROM), Melbourne, Australia,.
-
(2002)
Proc., ICEC 3rd World Congress
-
-
Gallagher, J.1
-
33
-
-
0036466940
-
Evaluating the risks of public private partnerships for infrastructure projects
-
Grimsey, D., and Lewis, M. K. (2002). " Evaluating the risks of public private partnerships for infrastructure projects.. " Int. J. Proj. Manage., 20, 107-118.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 107-118
-
-
Grimsey, D.1
Lewis, M.K.2
-
34
-
-
32944467333
-
Partnering: An Australian perspective. Part 1-Partnering explored
-
Hanly, G., and Valence, G. (1993). " Partnering: An Australian perspective. Part 1-Partnering explored.. " Australian Constr. Law Reporter, 12 (2), 50-59.
-
(1993)
Australian Constr. Law Reporter
, vol.12
, Issue.2
, pp. 50-59
-
-
Hanly, G.1
Valence, G.2
-
35
-
-
0034833230
-
Egan's view on contracts
-
Hosie, J. (2001). " Egan's view on contracts.. " Eng. Manage. J., 11 (2), 43-48.
-
(2001)
Eng. Manage. J.
, vol.11
, Issue.2
, pp. 43-48
-
-
Hosie, J.1
-
36
-
-
0035254835
-
Management of risks, uncertainties and opportunities on projects: Time for a fundamental shift
-
Jaafari, A. (2001). " Management of risks, uncertainties and opportunities on projects: Time for a fundamental shift.. " Int. J. Proj. Manage., 19, 89-101.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, pp. 89-101
-
-
Jaafari, A.1
-
37
-
-
0036778998
-
Reducing user-related risks during and prior to system development
-
Jiang, J. J., Klein, G., Chen, H., and Lin, L. (2002). " Reducing user-related risks during and prior to system development.. " Int. J. Proj. Manage., 20, 507-515.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 507-515
-
-
Jiang, J.J.1
Klein, G.2
Chen, H.3
Lin, L.4
-
38
-
-
1342309164
-
Trust in project relationships-Inside the black box
-
Kadefors, A. (2004). " Trust in project relationships-Inside the black box.. " Int. J. Proj. Manage., 22, 175-182.
-
(2004)
Int. J. Proj. Manage.
, vol.22
, pp. 175-182
-
-
Kadefors, A.1
-
39
-
-
0029469867
-
Risk management perceptions and trends of U.S. construction
-
Kangari, R. (1995). " Risk management perceptions and trends of U.S. construction.. " J. Constr. Eng. Manage., 121 (4), 422-429.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 422-429
-
-
Kangari, R.1
-
40
-
-
0035426616
-
Risk and its management in the Kuwaiti construction industry: A contractors' perspective
-
Kartam, N. A., and Kartam, S. A. (2001). " Risk and its management in the Kuwaiti construction industry: A contractors' perspective.. " Int. J. Proj. Manage., 19, 325-335.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, pp. 325-335
-
-
Kartam, N.A.1
Kartam, S.A.2
-
42
-
-
0030271075
-
A review of client-generated risks to project consultants
-
Kometa, S. T., Olomolaiye, P. O., and Harris, F. C. (1996). " A review of client-generated risks to project consultants.. " Int. J. Proj. Manage., 14 (5), 273-279.
-
(1996)
Int. J. Proj. Manage.
, vol.14
, Issue.5
, pp. 273-279
-
-
Kometa, S.T.1
Olomolaiye, P.O.2
Harris, F.C.3
-
44
-
-
32944477453
-
Project partnering in Australia
-
Li, D., and Green, D. (1996). " Project partnering in Australia.. " Austr. Proj. Manage., 16 (3), 37-43.
-
(1996)
Austr. Proj. Manage.
, vol.16
, Issue.3
, pp. 37-43
-
-
Li, D.1
Green, D.2
-
45
-
-
84993074016
-
Triangulation in construction management research
-
Love, P. D., Holt, G. D., and Li, H. (2002). " Triangulation in construction management research.. " Eng., Constr., Archit. Manage., 9 (4), 294-303.
-
(2002)
Eng., Constr., Archit. Manage.
, vol.9
, Issue.4
, pp. 294-303
-
-
Love, P.D.1
Holt, G.D.2
Li, H.3
-
46
-
-
36248964485
-
Construction management practice on the Three Gorges Project
-
Beijing
-
Lu, Y. (2005). " Construction management practice on the Three Gorges Project.. " Proc., 1st Greater China Project Management Summit, Beijing, 13-26.
-
(2005)
Proc., 1st Greater China Project Management Summit
, pp. 13-26
-
-
Lu, Y.1
-
49
-
-
0345098580
-
Project risk management in the Queensland engineering construction industry: A survey
-
Lyons, T., and Skitmore, M. (2003). " Project risk management in the Queensland engineering construction industry: A survey.. " Int. J. Proj. Manage., 22, 51-61.
-
(2003)
Int. J. Proj. Manage.
, vol.22
, pp. 51-61
-
-
Lyons, T.1
Skitmore, M.2
-
50
-
-
0242724677
-
-
National Audit Office (NAO). (Press Office of National Audit Office, London.
-
National Audit Office (NAO). (2001). Modernising construction, Press Office of National Audit Office, London.
-
(2001)
Modernising Construction
-
-
-
51
-
-
32944463373
-
-
National Statistical Bureau of China. (China Statistical Publishing House, Beijing.
-
National Statistical Bureau of China. (2002). Construction statistical yearbook of China, China Statistical Publishing House, Beijing.
-
(2002)
Construction Statistical Yearbook of China
-
-
-
52
-
-
0001849920
-
Communication and governance in the building process
-
Pietroforte, R. (1997). " Communication and governance in the building process.. " Constr. Manage. Econom., 15, 71-82.
-
(1997)
Constr. Manage. Econom.
, vol.15
, pp. 71-82
-
-
Pietroforte, R.1
-
53
-
-
0036142951
-
Joint risk management through transactionally efficient relational contracting
-
Rahman, M. M., and Kumaraswamy, M. M. (2002a). " Joint risk management through transactionally efficient relational contracting.. " Constr. Manage. Econom., 20, 45-54.
-
(2002)
Constr. Manage. Econom.
, vol.20
, pp. 45-54
-
-
Rahman, M.M.1
Kumaraswamy, M.M.2
-
54
-
-
84993077991
-
Risk management trends in the construction industry: Moving towards joint risk management
-
Rahman, M. M., and Kumaraswamy, M. M. (2002b). " Risk management trends in the construction industry: Moving towards joint risk management.. " Eng., Constr., Archit. Manage., 9 (2), 131-151.
-
(2002)
Eng., Constr., Archit. Manage.
, vol.9
, Issue.2
, pp. 131-151
-
-
Rahman, M.M.1
Kumaraswamy, M.M.2
-
55
-
-
14744292492
-
Contracting relationship trends and transitions
-
Rahman, M. M., and Kumaraswamy, M. M. (2004). " Contracting relationship trends and transitions.. " J. Manage. Eng., 20 (4), 147-161.
-
(2004)
J. Manage. Eng.
, vol.20
, Issue.4
, pp. 147-161
-
-
Rahman, M.M.1
Kumaraswamy, M.M.2
-
56
-
-
0035201702
-
Use and benefits of tools for project risk management
-
Raz, T., and Michael, E. (2001). " Use and benefits of tools for project risk management.. " Int. J. Proj. Manage., 19 (1), 9-17.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, Issue.1
, pp. 9-17
-
-
Raz, T.1
Michael, E.2
-
58
-
-
0031109413
-
Project risk management in Hong Kong
-
Shen, L. Y. (1997). " Project risk management in Hong Kong.. " Int. J. Proj. Manage., 15 (2), pp. 101-105.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.2
, pp. 101-105
-
-
Shen, L.Y.1
-
60
-
-
0003669844
-
-
Standards Association of Australia. (AS/NZS 4360, Australia.
-
Standards Association of Australia. (1999). " Risk management.. " AS/NZS 4360, Australia,.
-
(1999)
Risk Management
-
-
-
62
-
-
36248986516
-
-
Statistical Package for Social Science Incorporated (SPSS).
-
Statistical Package for Social Science Incorporated (SPSS). (1997). SPSS Base 7.5 for Windows users' guide, Chicago.
-
(1997)
-
-
-
63
-
-
0042842069
-
Application of systems thinking to the identification, avoidance and prevention of risk
-
Stewart, R. W., and Fortune J. (1995). " Application of systems thinking to the identification, avoidance and prevention of risk.. " Int. J. Proj. Manage., 13 (5), 279-286.
-
(1995)
Int. J. Proj. Manage.
, vol.13
, Issue.5
, pp. 279-286
-
-
Stewart, R.W.1
Fortune, J.2
-
64
-
-
10044263325
-
Developing a matrix to explore the relationship between partnering and total quality management in construction
-
Tang, W., Duffield, C. F., and Young, D. M. (2004). " Developing a matrix to explore the relationship between partnering and total quality management in construction.. " J. Harbin Inst. Technol., 11 (4), 422-427.
-
(2004)
J. Harbin Inst. Technol.
, vol.11
, Issue.4
, pp. 422-427
-
-
Tang, W.1
Duffield, C.F.2
Young, D.M.3
-
65
-
-
32944458539
-
Partnering mechanism in construction: An empirical study on the Chinese construction industry
-
Tang, W., Duffield, C. F., and Young, D. M. (2006). " Partnering mechanism in construction: An empirical study on the Chinese construction industry.. " J. Constr. Eng. Manage., 132 (3), 217-229.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.3
, pp. 217-229
-
-
Tang, W.1
Duffield, C.F.2
Young, D.M.3
-
66
-
-
0041707895
-
Risk perception analysis of BOT road project participants in India
-
Thomas, A. V., Kalidindi, S. N., and Ananthanarayanan, K. (2003). " Risk perception analysis of BOT road project participants in India.. " Constr. Manage. Econom., 21, 393-407.
-
(2003)
Constr. Manage. Econom.
, vol.21
, pp. 393-407
-
-
Thomas, A.V.1
Kalidindi, S.N.2
Ananthanarayanan, K.3
-
69
-
-
0031251828
-
Practices, barriers and benefits of using risk management approaches in selected Hong Kong Industries
-
Tummala, V. M. R., Leung, H. M., Mok, C. K., Burchett, J. F., and Leung, Y. H. (1997). " Practices, barriers and benefits of using risk management approaches in selected Hong Kong Industries.. " Int. J. Proj. Manage., 15 (5), 297-312.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.5
, pp. 297-312
-
-
Tummala, V.M.R.1
Leung, H.M.2
Mok, C.K.3
Burchett, J.F.4
Leung, Y.H.5
-
70
-
-
0035500575
-
Project contract management and a theory of organization
-
Turner, J. R., and Simister, S. J. (2001). " Project contract management and a theory of organization.. " Int. J. Proj. Manage., 19, 457-464.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, pp. 457-464
-
-
Turner, J.R.1
Simister, S.J.2
-
71
-
-
0033150106
-
Risk management in the conceptual phase of a project
-
Uher, T. E., and Toakley, A. R. (1999). " Risk management in the conceptual phase of a project.. " Int. J. Proj. Manage., 19 (3), 161-169.
-
(1999)
Int. J. Proj. Manage.
, vol.19
, Issue.3
, pp. 161-169
-
-
Uher, T.E.1
Toakley, A.R.2
-
72
-
-
0036779007
-
Understanding bi-project management: Engineering complex industrial construction projects
-
Velde, R. R., and Donk, D. P. (2002). " Understanding bi-project management: Engineering complex industrial construction projects.. " Int. J. Proj. Manage., 20, 525-533.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 525-533
-
-
Velde, R.R.1
Donk, D.P.2
-
74
-
-
0037211120
-
Construction industry joint venture behaviour in Hong Kong-Designed for collaborative results?
-
Walker, D. H. T., and Johannes, D. S. (2003). " Construction industry joint venture behaviour in Hong Kong-Designed for collaborative results? " Int. J. Proj. Manage., 21, 39-49.
-
(2003)
Int. J. Proj. Manage.
, vol.21
, pp. 39-49
-
-
Walker, D.H.T.1
Johannes, D.S.2
-
75
-
-
0033988396
-
Case study of government initiatives for PRC's BOT power plant project
-
Wang, S. Q., and Tiong, L. K. (2000). " Case study of government initiatives for PRC's BOT power plant project.. " Int. J. Proj. Manage., 18, 69-78.
-
(2000)
Int. J. Proj. Manage.
, vol.18
, pp. 69-78
-
-
Wang, S.Q.1
Tiong, L.K.2
-
76
-
-
0032667280
-
Political risks: Analysis of key contract clauses in China's BOT project
-
Wang, S. Q., Tiong, L. K., Ting, S. K., and Ashley, D. (1999). " Political risks: Analysis of key contract clauses in China's BOT project.. " J. Constr. Eng. Manage., 125 (3), 190-197.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 190-197
-
-
Wang, S.Q.1
Tiong, L.K.2
Ting, S.K.3
Ashley, D.4
-
77
-
-
0031206633
-
Empowerment vs risk management
-
Williams, T. M. (1997). " Empowerment vs risk management.. " Int. J. Proj. Manage., 15 (4), 219-222.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.4
, pp. 219-222
-
-
Williams, T.M.1
-
78
-
-
3242726643
-
Risk management practices of leading UK cost consults
-
Wood, G. D., and Ellis, R. C. T. (2003). " Risk management practices of leading UK cost consults.. " Eng., Constr., Archit. Manage., 10 (4), 254-262.
-
(2003)
Eng., Constr., Archit. Manage.
, vol.10
, Issue.4
, pp. 254-262
-
-
Wood, G.D.1
Ellis, R.C.T.2
|