-
1
-
-
84986139336
-
Business-process modelling and simulation for manufacturing management: A practical way forward
-
Barber, K., Dewhurst, F., Burns, R., Rogers, J. (2003), "Business-process modelling and simulation for manufacturing management: a practical way forward" in Business Process Management Journal, Vol. 9, No. 4, pp. 527-42.
-
(2003)
Business Process Management Journal
, vol.9
, Issue.4
, pp. 527-542
-
-
Barber, K.1
Dewhurst, F.2
Burns, R.3
Rogers, J.4
-
2
-
-
0002724916
-
Automated production control with a simulation capability
-
IFIP Working Paper WG5(7), Copenhagen
-
Burbidge, J.L. (1984), "Automated production control with a simulation capability", IFIP Working Paper WG5(7), Copenhagen.
-
(1984)
-
-
Burbidge, J.L.1
-
3
-
-
0032624968
-
Managing supply chain demand variability with scheduled ordering policies
-
Cachon, G. (1999), "Managing supply chain demand variability with scheduled ordering policies" in Management Science, Vol. 45, No. 6, pp. 843-56.
-
(1999)
Management Science
, vol.45
, Issue.6
, pp. 843-856
-
-
Cachon, G.1
-
4
-
-
77950515757
-
Supply chain coordination with contracts
-
de Kok, A.G., Graves, S.C. (Eds.), Elsevier, Amsterdam
-
Cachon, G.P. (2003), "Supply chain coordination with contracts" in de Kok, A.G. and Graves, S.C. (Eds.), Supply Chain Management: Design, Coordination and Operation, Elsevier, Amsterdam, pp. 229-340.
-
(2003)
Supply Chain Management: Design, Coordination and Operation
, pp. 229-340
-
-
Cachon, G.P.1
-
5
-
-
84925104726
-
Supply chain modelling using simulation
-
Chang, Y., Makatsoris, H. (2003), "Supply chain modelling using simulation" in International Journal of Simulation, Vol. 2, No. 1, pp. 24-30.
-
(2003)
International Journal of Simulation
, vol.2
, Issue.1
, pp. 24-30
-
-
Chang, Y.1
Makatsoris, H.2
-
7
-
-
0035171613
-
Offline programming and simulation help Boeing use giant automated riveter on C-17 aircraft
-
Dale, R. (2001), "Offline programming and simulation help Boeing use giant automated riveter on C-17 aircraft" in Industrial Robot: An International Journal, Vol. 18, No. 6, pp. 478-82.
-
(2001)
Industrial Robot: An International Journal
, vol.18
, Issue.6
, pp. 478-482
-
-
Dale, R.1
-
8
-
-
0003816118
-
-
Harvard Business Press, Boston, MA
-
Davenport, T. (1994), Process Innovation, Harvard Business Press, Boston, MA.
-
(1994)
Process Innovation
-
-
Davenport, T.1
-
9
-
-
3042771395
-
The slab design problem in steel industry
-
Dawande, M., Kalagnanam, J., Lee, H.S., Reddy, C., Siegel, S., Trumbo, M. (2004), "The slab design problem in steel industry" in INFORM, Vol. 34, No. 3, pp. 215-25.
-
(2004)
INFORM
, vol.34
, Issue.3
, pp. 215-225
-
-
Dawande, M.1
Kalagnanam, J.2
Lee, H.S.3
Reddy, C.4
Siegel, S.5
Trumbo, M.6
-
10
-
-
0037151238
-
Transfer function analysis of forecasting induced bullwhip in supply chains
-
Dejonckeere, J., Disney, S.M., Lambrecht, M.R., Towill, D.R. (2000), "Transfer function analysis of forecasting induced bullwhip in supply chains" in International Journal of Production Economics, Vol. 78, pp. 133-44.
-
(2000)
International Journal of Production Economics
, vol.78
, pp. 133-144
-
-
Dejonckeere, J.1
Disney, S.M.2
Lambrecht, M.R.3
Towill, D.R.4
-
11
-
-
0037449229
-
Measuring and avoiding the bullwhip effect: A control theoretic approach
-
Dejonckeere, J., Disney, S.M., Lambrecht, M.R., Towill, D.R. (2002), "Measuring and avoiding the bullwhip effect: a control theoretic approach" in European Journal of Operational Research, Vol. 147, No. 1, pp. 567-90.
-
(2002)
European Journal of Operational Research
, vol.147
, Issue.1
, pp. 567-590
-
-
Dejonckeere, J.1
Disney, S.M.2
Lambrecht, M.R.3
Towill, D.R.4
-
12
-
-
64949146561
-
A multi agent system for the integrated dynamic scheduling of steel production
-
PhD thesis, University of Nottingham, School of Computer Science and Information Technology
-
Djamila, O. (2003), "A multi agent system for the integrated dynamic scheduling of steel production", University of Nottingham, School of Computer Science and Information Technology, Nottingham, PhD thesis.
-
(2003)
-
-
Djamila, O.1
-
14
-
-
0034171704
-
Agent oriented supply chain management
-
Fox, M., Barbuceanu, M., Teigen, R. (2000), "Agent oriented supply chain management" in The International Journal of Flexible Manufacturing System, Vol. 12, No. 1, pp. 165-88.
-
(2000)
The International Journal of Flexible Manufacturing System
, vol.12
, Issue.1
, pp. 165-188
-
-
Fox, M.1
Barbuceanu, M.2
Teigen, R.3
-
15
-
-
0038519919
-
Measuring the bullwhip effect in the supply chain
-
Fransoo, J.C., Wouters, M.J.F. (2000), "Measuring the bullwhip effect in the supply chain" in Supply Chain Management: An International Journal, Vol. 5, No. 2, pp. 78-89.
-
(2000)
Supply Chain Management: An International Journal
, vol.5
, Issue.2
, pp. 78-89
-
-
Fransoo, J.C.1
Wouters, M.J.F.2
-
16
-
-
0034427652
-
Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains
-
Fu, Y.H., Piplani, R., de Souza, R., Wu, J. (2000), "Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains" in Proceedings of the 2000 Winter Simulation Conference, Vol. 2, No. 1, pp. 1763-71.
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
, vol.2
, Issue.1
, pp. 1763-1771
-
-
Fu, Y.H.1
Piplani, R.2
de Souza, R.3
Wu, J.4
-
17
-
-
84986120925
-
Using business-process simulation within a business-process reengineering approach
-
Greasley, A. (2003), "Using business-process simulation within a business-process reengineering approach" in Business Process Management Journal, Vol. 9, No. 4, pp. 408-21.
-
(2003)
Business Process Management Journal
, vol.9
, Issue.4
, pp. 408-421
-
-
Greasley, A.1
-
18
-
-
0030206040
-
System design of two echelon steel industry supply chain
-
Hafeez, K., Griffiths, M., Griffiths, J., Naim, M.M. (1996), "System design of two echelon steel industry supply chain" in International Journal of Production Economics, Vol. 45, No. 1, pp. 121-30.
-
(1996)
International Journal of Production Economics
, vol.45
, Issue.1
, pp. 121-130
-
-
Hafeez, K.1
Griffiths, M.2
Griffiths, J.3
Naim, M.M.4
-
19
-
-
0003594966
-
-
HarperCollins Publisher, New York, NY
-
Hammer, M., Champy, J. (1993), Reengineering the Corporation: A Manifest for Business Revolution, HarperCollins Publisher, New York, NY.
-
(1993)
Reengineering the Corporation: A Manifest for Business Revolution
-
-
Hammer, M.1
Champy, J.2
-
21
-
-
34247147010
-
Business process modelling using discrete-event simulation: Current opportunities and future challenges
-
Hlupic, V., Vreede, G.J. (2005), "Business process modelling using discrete-event simulation: current opportunities and future challenges" in International Journal of Simulation and Process Modeling, Vol. 1, Nos 1/2, pp. 72-81.
-
(2005)
International Journal of Simulation and Process Modeling
, vol.1
, Issue.1-2
, pp. 72-81
-
-
Hlupic, V.1
Vreede, G.J.2
-
22
-
-
0037151230
-
Supply chain simulation - a tool for education, enhancement and endeavour
-
Holweg, M., Bicheno, J. (2002), "Supply chain simulation - a tool for education, enhancement and endeavour" in International Journal of Production Economics, Vol. 78, No. 1, pp. 163-75.
-
(2002)
International Journal of Production Economics
, vol.78
, Issue.1
, pp. 163-175
-
-
Holweg, M.1
Bicheno, J.2
-
23
-
-
77954224282
-
Integration of supply chain IT and lean practices for mass customization: Benchmarking of product and service focused manufacturers
-
Hong, P., Dobrzykowski, D., Vonderembse, M. (2010), "Integration of supply chain IT and lean practices for mass customization: benchmarking of product and service focused manufacturers" in Benchmarking: An International Journal, Vol. 17, No. 4, pp. 561-92.
-
(2010)
Benchmarking: An International Journal
, vol.17
, Issue.4
, pp. 561-592
-
-
Hong, P.1
Dobrzykowski, D.2
Vonderembse, M.3
-
24
-
-
0005139234
-
Engineering the leagile supply chain
-
Jones, R.M., Naylor, B., Towill, D.R. (2000), "Engineering the leagile supply chain" in International Journal of Agile Management Systems, Vol. 2, No. 1, pp. 54-61.
-
(2000)
International Journal of Agile Management Systems
, vol.2
, Issue.1
, pp. 54-61
-
-
Jones, R.M.1
Naylor, B.2
Towill, D.R.3
-
25
-
-
0032677463
-
The effect of (s, S) ordering policy on the supply chain
-
Kelle, P., Milne, A. (1999), "The effect of (s, S) ordering policy on the supply chain" in International Journal Production Economics, Vol. 59, Nos 1-3, pp. 113-22.
-
(1999)
International Journal Production Economics
, vol.59
, Issue.1-3
, pp. 113-122
-
-
Kelle, P.1
Milne, A.2
-
26
-
-
0036929122
-
The extended simulation environment
-
Yücesan, E., Chen, C.-H., Snowdon, J.L., Charnes, J.M. (Eds.)
-
Krahl, D. (2002), "The extended simulation environment" in Yücesan, E., Chen, C.-H., Snowdon, J.L. and Charnes, J.M. (Eds.), Proceedings of the 2002 Winter Simulation Conference, pp. 205-13.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 205-213
-
-
Krahl, D.1
-
27
-
-
34249704468
-
An investigation of the relationships between organizational factors, business process improvement, and ERP success
-
Law, C., Ngai, E. (2007), "An investigation of the relationships between organizational factors, business process improvement, and ERP success" in Benchmarking: An International Journal, Vol. 14, No. 3, pp. 387-406.
-
(2007)
Benchmarking: An International Journal
, vol.14
, Issue.3
, pp. 387-406
-
-
Law, C.1
Ngai, E.2
-
28
-
-
0002663868
-
The bullwhip effect in the supply chain
-
Spring
-
Lee, H.L., Padmanabhan, V., Whang, S. (1997), "The bullwhip effect in the supply chain" in Sloan Management Review, Spring, pp. 93-102.
-
(1997)
Sloan Management Review
, pp. 93-102
-
-
Lee, H.L.1
Padmanabhan, V.2
Whang, S.3
-
29
-
-
0030102183
-
Primary production scheduling at steel-making industries
-
Lee, H.S., Murthy, S.S. (1996), "Primary production scheduling at steel-making industries" in IBM Journal of Research & Development, Vol. 40, No. 2, pp. 231-53.
-
(1996)
IBM Journal of Research & Development
, vol.40
, Issue.2
, pp. 231-253
-
-
Lee, H.S.1
Murthy, S.S.2
-
30
-
-
0035648143
-
Integrating knowledge and processes in a learning organization
-
Levine, L. (2001), "Integrating knowledge and processes in a learning organization" in Information System Management, Vol. 18, No. 1, pp. 21-32.
-
(2001)
Information System Management
, vol.18
, Issue.1
, pp. 21-32
-
-
Levine, L.1
-
31
-
-
0032108281
-
Reengineering the order fulfillment process in supply chain networks
-
Lin, F., Shaw, M.J. (1998), "Reengineering the order fulfillment process in supply chain networks" in International Journal of Flexible Manufacturing Systems, Vol. 10, No. 3, pp. 197-229.
-
(1998)
International Journal of Flexible Manufacturing Systems
, vol.10
, Issue.3
, pp. 197-229
-
-
Lin, F.1
Shaw, M.J.2
-
32
-
-
3242679524
-
Diagnosis and reduction of bullwhip in supply chains
-
McCullen, P., Towill, D. (2002), "Diagnosis and reduction of bullwhip in supply chains" in International Journal of Supply Chain Management, Vol. 7, No. 3, pp. 164-79.
-
(2002)
International Journal of Supply Chain Management
, vol.7
, Issue.3
, pp. 164-179
-
-
McCullen, P.1
Towill, D.2
-
33
-
-
0031141908
-
Quantifying the bullwhip effect in supply chains
-
Metters, R. (1997), "Quantifying the bullwhip effect in supply chains" in Journal of Operations Management, Vol. 3, No. 15, pp. 89-100.
-
(1997)
Journal of Operations Management
, vol.3
, Issue.15
, pp. 89-100
-
-
Metters, R.1
-
34
-
-
27144490694
-
Systems thinking ability for supply chain management
-
Moon, S.-A., Kim, D.-J. (2005), "Systems thinking ability for supply chain management" in Supply Chain Management: An International Journal, Vol. 10, No. 5, pp. 394-401.
-
(2005)
Supply Chain Management: An International Journal
, vol.10
, Issue.5
, pp. 394-401
-
-
Moon, S.-A.1
Kim, D.-J.2
-
35
-
-
84874147788
-
-
available at:, (accessed 12 February 2008)
-
Naylor, D.J., Bernhard, C., Green, A.M., Sjökvist, T. (2007), Learn How to Continuously Steel on the Internet at Steeluniversity.org, available at: http://library.mcc-cdl.at/8200.pdf (accessed 12 February 2008).
-
(2007)
Learn How to Continuously Steel on the Internet at Steeluniversity.Org
-
-
Naylor, D.J.1
Bernhard, C.2
Green, A.M.3
Sjökvist, T.4
-
36
-
-
0004573482
-
Redesigning organisations through business process re-engineering and object-orientation
-
Paolucci, E., Bonci, F., Russi, V. (1997), "Redesigning organisations through business process re-engineering and object-orientation" in Proceedings of the European Conference on Information Systems, Cork, Ireland, pp. 587-601.
-
(1997)
Proceedings of the European Conference on Information Systems, Cork, Ireland
, pp. 587-601
-
-
Paolucci, E.1
Bonci, F.2
Russi, V.3
-
37
-
-
0036542527
-
An efficient scheduling algorithm for the hot coil making in the steel mini-mill
-
Park, H., Hong, Y., Chang, S.Y. (2002), "An efficient scheduling algorithm for the hot coil making in the steel mini-mill" in Production Planning & Control, Vol. 13, No. 3, pp. 298-306.
-
(2002)
Production Planning & Control
, vol.13
, Issue.3
, pp. 298-306
-
-
Park, H.1
Hong, Y.2
Chang, S.Y.3
-
38
-
-
33645458116
-
Simulation of range safety for the NASA space shuttle
-
Rabelo, L., Sepulveda, J., Compton, J., Turner, R. (2006), "Simulation of range safety for the NASA space shuttle" in Aircraft Engineering & Aerospace Technology: An International Journal, Vol. 78, No. 2, pp. 98-106.
-
(2006)
Aircraft Engineering & Aerospace Technology: An International Journal
, vol.78
, Issue.2
, pp. 98-106
-
-
Rabelo, L.1
Sepulveda, J.2
Compton, J.3
Turner, R.4
-
39
-
-
61449230766
-
Demand forecasting for supply processes in consideration of pricing and market information
-
Reiner, G., Fichtinger, J. (2009), "Demand forecasting for supply processes in consideration of pricing and market information" in International Journal of Production Economics, Vol. 118, No. 1, pp. 55-62.
-
(2009)
International Journal of Production Economics
, vol.118
, Issue.1
, pp. 55-62
-
-
Reiner, G.1
Fichtinger, J.2
-
40
-
-
33751189840
-
Managing project business development: An inter-organizational and intra-organizational perspective
-
doctoral dissertation, Swedish School of Economics and Business Administration, Helsinki
-
Sandhu, M. (2005), "Managing project business development: an inter-organizational and intra-organizational perspective", Swedish School of Economics and Business Administration, Helsinki, doctoral dissertation.
-
(2005)
-
-
Sandhu, M.1
-
41
-
-
84986065157
-
Business process development in project-based industry: A case study
-
Sandhu, M., Gunasekaran, A. (2004), "Business process development in project-based industry: a case study" in Business Process Management Journal, Vol. 10, No. 6, pp. 673-90.
-
(2004)
Business Process Management Journal
, vol.10
, Issue.6
, pp. 673-690
-
-
Sandhu, M.1
Gunasekaran, A.2
-
42
-
-
0032268192
-
Modeling supply chain dynamics: A multi agent approach
-
Swaminathan, J.R., Smith, S.F., Sadeh, N.M. (1998), "Modeling supply chain dynamics: a multi agent approach" in Decision Sciences, Vol. 29, No. 3, pp. 607-32.
-
(1998)
Decision Sciences
, vol.29
, Issue.3
, pp. 607-632
-
-
Swaminathan, J.R.1
Smith, S.F.2
Sadeh, N.M.3
-
44
-
-
0001847466
-
The application of filter theory to the study of supply chain dynamics
-
Towill, D.R., Del Vecchio, A. (1994), "The application of filter theory to the study of supply chain dynamics" in Production Planning & Control, Vol. 5, No. 1, pp. 82-96.
-
(1994)
Production Planning & Control
, vol.5
, Issue.1
, pp. 82-96
-
-
Towill, D.R.1
Del Vecchio, A.2
-
45
-
-
0037893105
-
Integrating the automotive supply chain: Where are we now?
-
Towill, D.R., Childerhouse, P., Disney, S.M. (2002), "Integrating the automotive supply chain: where are we now?" in International Journal of Physical Distribution & Logistics Management, Vol. 32, No. 2, pp. 79-95.
-
(2002)
International Journal of Physical Distribution & Logistics Management
, vol.32
, Issue.2
, pp. 79-95
-
-
Towill, D.R.1
Childerhouse, P.2
Disney, S.M.3
-
47
-
-
33947220287
-
Exploiting the order book for mass customized manufacturing control systems with capacity limitation
-
Wilkner, J.M., Naim, M., Rudberg, M. (2007), "Exploiting the order book for mass customized manufacturing control systems with capacity limitation" in IEEE Transactions on Engineering Management, Vol. 54, No. 1, pp. 145-55.
-
(2007)
IEEE Transactions on Engineering Management
, vol.54
, Issue.1
, pp. 145-155
-
-
Wilkner, J.M.1
Naim, M.2
Rudberg, M.3
-
48
-
-
77950582382
-
Challenges to the supply chain in the steel industry
-
Xiong, G., Helo, P. (2008), "Challenges to the supply chain in the steel industry" in International Journal of Logistics Economics and Globalisation, Vol. 1, No. 2, pp. 160-75.
-
(2008)
International Journal of Logistics Economics and Globalisation
, vol.1
, Issue.2
, pp. 160-175
-
-
Xiong, G.1
Helo, P.2
-
49
-
-
9144254022
-
Fuzzy discrete-event simulation for modeling uncertain activity duration
-
Zhang, H., Li, H., Tam, C. (2004), "Fuzzy discrete-event simulation for modeling uncertain activity duration" in Engineering, Construction and Architectural Management, Vol. 11, No. 6, pp. 426-37.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.6
, pp. 426-437
-
-
Zhang, H.1
Li, H.2
Tam, C.3
|