메뉴 건너뛰기




Volumn 20, Issue 1, 2013, Pages 45-61

Steel supply chain management by simulation modelling

Author keywords

Modelling; Simulation; Steel supply simulation; Supply chain management

Indexed keywords


EID: 84874121849     PISSN: 14635771     EISSN: None     Source Type: Journal    
DOI: 10.1108/14635771311299489     Document Type: Review
Times cited : (32)

References (50)
  • 1
    • 84986139336 scopus 로고    scopus 로고
    • Business-process modelling and simulation for manufacturing management: A practical way forward
    • Barber, K., Dewhurst, F., Burns, R., Rogers, J. (2003), "Business-process modelling and simulation for manufacturing management: a practical way forward" in Business Process Management Journal, Vol. 9, No. 4, pp. 527-42.
    • (2003) Business Process Management Journal , vol.9 , Issue.4 , pp. 527-542
    • Barber, K.1    Dewhurst, F.2    Burns, R.3    Rogers, J.4
  • 2
    • 0002724916 scopus 로고
    • Automated production control with a simulation capability
    • IFIP Working Paper WG5(7), Copenhagen
    • Burbidge, J.L. (1984), "Automated production control with a simulation capability", IFIP Working Paper WG5(7), Copenhagen.
    • (1984)
    • Burbidge, J.L.1
  • 3
    • 0032624968 scopus 로고    scopus 로고
    • Managing supply chain demand variability with scheduled ordering policies
    • Cachon, G. (1999), "Managing supply chain demand variability with scheduled ordering policies" in Management Science, Vol. 45, No. 6, pp. 843-56.
    • (1999) Management Science , vol.45 , Issue.6 , pp. 843-856
    • Cachon, G.1
  • 4
    • 77950515757 scopus 로고    scopus 로고
    • Supply chain coordination with contracts
    • de Kok, A.G., Graves, S.C. (Eds.), Elsevier, Amsterdam
    • Cachon, G.P. (2003), "Supply chain coordination with contracts" in de Kok, A.G. and Graves, S.C. (Eds.), Supply Chain Management: Design, Coordination and Operation, Elsevier, Amsterdam, pp. 229-340.
    • (2003) Supply Chain Management: Design, Coordination and Operation , pp. 229-340
    • Cachon, G.P.1
  • 7
    • 0035171613 scopus 로고    scopus 로고
    • Offline programming and simulation help Boeing use giant automated riveter on C-17 aircraft
    • Dale, R. (2001), "Offline programming and simulation help Boeing use giant automated riveter on C-17 aircraft" in Industrial Robot: An International Journal, Vol. 18, No. 6, pp. 478-82.
    • (2001) Industrial Robot: An International Journal , vol.18 , Issue.6 , pp. 478-482
    • Dale, R.1
  • 8
    • 0003816118 scopus 로고
    • Harvard Business Press, Boston, MA
    • Davenport, T. (1994), Process Innovation, Harvard Business Press, Boston, MA.
    • (1994) Process Innovation
    • Davenport, T.1
  • 12
    • 64949146561 scopus 로고    scopus 로고
    • A multi agent system for the integrated dynamic scheduling of steel production
    • PhD thesis, University of Nottingham, School of Computer Science and Information Technology
    • Djamila, O. (2003), "A multi agent system for the integrated dynamic scheduling of steel production", University of Nottingham, School of Computer Science and Information Technology, Nottingham, PhD thesis.
    • (2003)
    • Djamila, O.1
  • 16
    • 0034427652 scopus 로고    scopus 로고
    • Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains
    • Fu, Y.H., Piplani, R., de Souza, R., Wu, J. (2000), "Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains" in Proceedings of the 2000 Winter Simulation Conference, Vol. 2, No. 1, pp. 1763-71.
    • (2000) Proceedings of the 2000 Winter Simulation Conference , vol.2 , Issue.1 , pp. 1763-1771
    • Fu, Y.H.1    Piplani, R.2    de Souza, R.3    Wu, J.4
  • 17
    • 84986120925 scopus 로고    scopus 로고
    • Using business-process simulation within a business-process reengineering approach
    • Greasley, A. (2003), "Using business-process simulation within a business-process reengineering approach" in Business Process Management Journal, Vol. 9, No. 4, pp. 408-21.
    • (2003) Business Process Management Journal , vol.9 , Issue.4 , pp. 408-421
    • Greasley, A.1
  • 21
    • 34247147010 scopus 로고    scopus 로고
    • Business process modelling using discrete-event simulation: Current opportunities and future challenges
    • Hlupic, V., Vreede, G.J. (2005), "Business process modelling using discrete-event simulation: current opportunities and future challenges" in International Journal of Simulation and Process Modeling, Vol. 1, Nos 1/2, pp. 72-81.
    • (2005) International Journal of Simulation and Process Modeling , vol.1 , Issue.1-2 , pp. 72-81
    • Hlupic, V.1    Vreede, G.J.2
  • 22
    • 0037151230 scopus 로고    scopus 로고
    • Supply chain simulation - a tool for education, enhancement and endeavour
    • Holweg, M., Bicheno, J. (2002), "Supply chain simulation - a tool for education, enhancement and endeavour" in International Journal of Production Economics, Vol. 78, No. 1, pp. 163-75.
    • (2002) International Journal of Production Economics , vol.78 , Issue.1 , pp. 163-175
    • Holweg, M.1    Bicheno, J.2
  • 23
    • 77954224282 scopus 로고    scopus 로고
    • Integration of supply chain IT and lean practices for mass customization: Benchmarking of product and service focused manufacturers
    • Hong, P., Dobrzykowski, D., Vonderembse, M. (2010), "Integration of supply chain IT and lean practices for mass customization: benchmarking of product and service focused manufacturers" in Benchmarking: An International Journal, Vol. 17, No. 4, pp. 561-92.
    • (2010) Benchmarking: An International Journal , vol.17 , Issue.4 , pp. 561-592
    • Hong, P.1    Dobrzykowski, D.2    Vonderembse, M.3
  • 25
    • 0032677463 scopus 로고    scopus 로고
    • The effect of (s, S) ordering policy on the supply chain
    • Kelle, P., Milne, A. (1999), "The effect of (s, S) ordering policy on the supply chain" in International Journal Production Economics, Vol. 59, Nos 1-3, pp. 113-22.
    • (1999) International Journal Production Economics , vol.59 , Issue.1-3 , pp. 113-122
    • Kelle, P.1    Milne, A.2
  • 26
    • 0036929122 scopus 로고    scopus 로고
    • The extended simulation environment
    • Yücesan, E., Chen, C.-H., Snowdon, J.L., Charnes, J.M. (Eds.)
    • Krahl, D. (2002), "The extended simulation environment" in Yücesan, E., Chen, C.-H., Snowdon, J.L. and Charnes, J.M. (Eds.), Proceedings of the 2002 Winter Simulation Conference, pp. 205-13.
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 205-213
    • Krahl, D.1
  • 27
    • 34249704468 scopus 로고    scopus 로고
    • An investigation of the relationships between organizational factors, business process improvement, and ERP success
    • Law, C., Ngai, E. (2007), "An investigation of the relationships between organizational factors, business process improvement, and ERP success" in Benchmarking: An International Journal, Vol. 14, No. 3, pp. 387-406.
    • (2007) Benchmarking: An International Journal , vol.14 , Issue.3 , pp. 387-406
    • Law, C.1    Ngai, E.2
  • 29
    • 0030102183 scopus 로고    scopus 로고
    • Primary production scheduling at steel-making industries
    • Lee, H.S., Murthy, S.S. (1996), "Primary production scheduling at steel-making industries" in IBM Journal of Research & Development, Vol. 40, No. 2, pp. 231-53.
    • (1996) IBM Journal of Research & Development , vol.40 , Issue.2 , pp. 231-253
    • Lee, H.S.1    Murthy, S.S.2
  • 30
    • 0035648143 scopus 로고    scopus 로고
    • Integrating knowledge and processes in a learning organization
    • Levine, L. (2001), "Integrating knowledge and processes in a learning organization" in Information System Management, Vol. 18, No. 1, pp. 21-32.
    • (2001) Information System Management , vol.18 , Issue.1 , pp. 21-32
    • Levine, L.1
  • 31
    • 0032108281 scopus 로고    scopus 로고
    • Reengineering the order fulfillment process in supply chain networks
    • Lin, F., Shaw, M.J. (1998), "Reengineering the order fulfillment process in supply chain networks" in International Journal of Flexible Manufacturing Systems, Vol. 10, No. 3, pp. 197-229.
    • (1998) International Journal of Flexible Manufacturing Systems , vol.10 , Issue.3 , pp. 197-229
    • Lin, F.1    Shaw, M.J.2
  • 33
    • 0031141908 scopus 로고    scopus 로고
    • Quantifying the bullwhip effect in supply chains
    • Metters, R. (1997), "Quantifying the bullwhip effect in supply chains" in Journal of Operations Management, Vol. 3, No. 15, pp. 89-100.
    • (1997) Journal of Operations Management , vol.3 , Issue.15 , pp. 89-100
    • Metters, R.1
  • 37
    • 0036542527 scopus 로고    scopus 로고
    • An efficient scheduling algorithm for the hot coil making in the steel mini-mill
    • Park, H., Hong, Y., Chang, S.Y. (2002), "An efficient scheduling algorithm for the hot coil making in the steel mini-mill" in Production Planning & Control, Vol. 13, No. 3, pp. 298-306.
    • (2002) Production Planning & Control , vol.13 , Issue.3 , pp. 298-306
    • Park, H.1    Hong, Y.2    Chang, S.Y.3
  • 39
    • 61449230766 scopus 로고    scopus 로고
    • Demand forecasting for supply processes in consideration of pricing and market information
    • Reiner, G., Fichtinger, J. (2009), "Demand forecasting for supply processes in consideration of pricing and market information" in International Journal of Production Economics, Vol. 118, No. 1, pp. 55-62.
    • (2009) International Journal of Production Economics , vol.118 , Issue.1 , pp. 55-62
    • Reiner, G.1    Fichtinger, J.2
  • 40
    • 33751189840 scopus 로고    scopus 로고
    • Managing project business development: An inter-organizational and intra-organizational perspective
    • doctoral dissertation, Swedish School of Economics and Business Administration, Helsinki
    • Sandhu, M. (2005), "Managing project business development: an inter-organizational and intra-organizational perspective", Swedish School of Economics and Business Administration, Helsinki, doctoral dissertation.
    • (2005)
    • Sandhu, M.1
  • 41
    • 84986065157 scopus 로고    scopus 로고
    • Business process development in project-based industry: A case study
    • Sandhu, M., Gunasekaran, A. (2004), "Business process development in project-based industry: a case study" in Business Process Management Journal, Vol. 10, No. 6, pp. 673-90.
    • (2004) Business Process Management Journal , vol.10 , Issue.6 , pp. 673-690
    • Sandhu, M.1    Gunasekaran, A.2
  • 42
    • 0032268192 scopus 로고    scopus 로고
    • Modeling supply chain dynamics: A multi agent approach
    • Swaminathan, J.R., Smith, S.F., Sadeh, N.M. (1998), "Modeling supply chain dynamics: a multi agent approach" in Decision Sciences, Vol. 29, No. 3, pp. 607-32.
    • (1998) Decision Sciences , vol.29 , Issue.3 , pp. 607-632
    • Swaminathan, J.R.1    Smith, S.F.2    Sadeh, N.M.3
  • 44
    • 0001847466 scopus 로고
    • The application of filter theory to the study of supply chain dynamics
    • Towill, D.R., Del Vecchio, A. (1994), "The application of filter theory to the study of supply chain dynamics" in Production Planning & Control, Vol. 5, No. 1, pp. 82-96.
    • (1994) Production Planning & Control , vol.5 , Issue.1 , pp. 82-96
    • Towill, D.R.1    Del Vecchio, A.2
  • 47
    • 33947220287 scopus 로고    scopus 로고
    • Exploiting the order book for mass customized manufacturing control systems with capacity limitation
    • Wilkner, J.M., Naim, M., Rudberg, M. (2007), "Exploiting the order book for mass customized manufacturing control systems with capacity limitation" in IEEE Transactions on Engineering Management, Vol. 54, No. 1, pp. 145-55.
    • (2007) IEEE Transactions on Engineering Management , vol.54 , Issue.1 , pp. 145-155
    • Wilkner, J.M.1    Naim, M.2    Rudberg, M.3
  • 49
    • 9144254022 scopus 로고    scopus 로고
    • Fuzzy discrete-event simulation for modeling uncertain activity duration
    • Zhang, H., Li, H., Tam, C. (2004), "Fuzzy discrete-event simulation for modeling uncertain activity duration" in Engineering, Construction and Architectural Management, Vol. 11, No. 6, pp. 426-37.
    • (2004) Engineering, Construction and Architectural Management , vol.11 , Issue.6 , pp. 426-437
    • Zhang, H.1    Li, H.2    Tam, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.